Helioscreen RUBIX Скачать руководство пользователя страница 8

 3.2 Setting the inClination of the awning

adjuStment of the CaSSette droP Profile:

• Extend the awning by approximately 40 to 50cm.
• Loosen stop nuts at the side of the drop profile holders with

SW 13 spanner.

• Move drop profile with one hand into the desired

inclination position.

• Push drop profile to the desired position and

 

fix by tightening

 

the 

stop nut.

• Make the same adjustment on the other side. Use the mesh pattern

 

on the drop bar holder for easier orientation.

• Visually verify whether the side parts of the housing and the drop

 

profile are in alignment. If necessary, correct drop profile again.

• Wind up awning and check that the drop profile closes exactly.

adjuStment of the inClination of the awning:

• Half extend the awning.
• Remove securing screw with Allen key 5.
• Loosen the side screw with Allen key 10.
• Lift arm slightly to relieve the load on the pivoting part and adjust

the inclination by turning the screw in the pivoting part with SW

10 Allen key.

to lower the awning, turn CloCkwiSe 

to raiSe the awning, turn Counter-CloCkwiSe

In the event of a significant change of the inclination setting (more 

than 10°), the arms must be adjusted alternately.

Ensure that the pivoting part rests with its surface on the 

head of the countersunk screw. 

• Following the adjustment of the inclination, firmly tighten the side

screw and insert the securing screw with the washer, then also

tighten firmly.

Loosen screw slightly.

Stop nut

Mesh pattern

www.helioscreen.com.au | Phone 1300 766 319 

Helioscreen Rubix

 • INSTALLATION GUIDE  |  8

Содержание RUBIX

Страница 1: ...com au Phone 1300 766 319 Helioscreen Rubix INSTALLATION GUIDE 1 INSTALLATION GUIDE RUBIX Helioscreen Australia Pty Ltd Dealers Australia Wide www helioscreen com au enquiries helioscreen com au Phon...

Страница 2: ...Safety noteS 1 Safety 1 1 explanation of the safety notes 3 1 2 general safety information 3 2 inStallation 2 1 tools resources and materials 3 2 2 Preparing the installation 3 2 3 mounting situations...

Страница 3: ...awning is hoisted to higher installation positions with ropes the awning must be removed from the packaging When attaching the hoisting ropes ensure that the awning is properly fastened but not damage...

Страница 4: ...wall mounting Ceiling mounting 2 3 mounting SituationS www helioscreen com au Phone 1300 766 319 Helioscreen Rubix INSTALLATION GUIDE 4...

Страница 5: ...height and PoSition of the braCketS mounting height The awning can produce crushing forces and shear stresses for instance between the drop profile and the casing on the articulated arms and at the po...

Страница 6: ...essary to use backing for the entire surface or at least distancers for the area around the screws The accompanying figure explains a possible variant braCket mounting Loosely fasten all brackets and...

Страница 7: ...trial operation ensure that nobody is in this area there is a risk of injury in case of a malfunction 3 1 with motor driVe For trial operation always use the test cable no automatic control units etc...

Страница 8: ...tly adjuStment of the inClination of the awning Half extend the awning Remove securing screw with Allen key 5 Loosen the side screw with Allen key 10 Lift arm slightly to relieve the load on the pivot...

Страница 9: ...cedure tyPe of fault CauSe remedy motor drive does not work No power Check connection specialized company Motor drive not correctly connected Check connection specialized company Thermal protection of...

Отзывы: