Installation Instructions LRS 01
10
HEKATRON Vertriebs GmbH · Brühlmatten 9 · D-79295 Sulzburg
7002428 100206.VDA Ausgabe 10.02.2006
Installation Instructions LRS 01
11
7002428 100206.VDA Ausgabe 10.02.2006
HEKATRON Vertriebs GmbH · Brühlmatten 9 · D-79295 Sulzburg
If the self-drilling screws (4.8 x 22) supplied are not suitable for fastening the
socket to the ventilation duct, use other more suitable fasteners. There are two
holes 6 mm diameter spaced at 206 mm in the base of the LKS 02 for mounting
it.
Two larger holes for the inlet and outlet tubes must also be drilled in the venti-
lation duct (see Figure 06).
Figure 06
Opening the LKS 02 cover
For servicing, the LKS 02 has quick-action clips. By pressing gently on the hous-
ing cover, it is easier to open or close the clips. If the LKS 02 socket is mounted
inverted, take care, when opening the transparent cover, that parts do not fall
on the floor (cover, suction tube etc.).
Handling
The connection lead for the Smoke Switch ORS 210 must be passed through the
plug supplied into the housing and connected.
The Smoke Switch ORS 210 is screwed into the socket LKS 02.
Then the inlet tube with flow adapter is fitted.
After a positive functional check with test gas, the cover of the LKS 02 can be
fitted by pressing gently on it and closing the clips.
Display of Smoke Switch ORS 210
The display of Smoke Switch ORS 210 is visible through the transparent cover of
the LKS 02 housing.
Application limits
This Smoke Switch should not be used where quantities of dust, smoke,
moisture or steam are to be expected from plant operations. Make sure that the
Smoke Switch will not be subject to dew formation. TheLRS 01 must not be used
out of doors. These instructions must be taken into account when planning the
installation.