background image

Installation Instructions LRS 01

10

HEKATRON Vertriebs GmbH · Brühlmatten 9 · D-79295 Sulzburg 

7002428 100206.VDA   Ausgabe 10.02.2006

Installation Instructions LRS 01

11

7002428 100206.VDA   Ausgabe 10.02.2006 

HEKATRON Vertriebs GmbH · Brühlmatten 9 · D-79295 Sulzburg

If the self-drilling screws (4.8 x 22) supplied are not suitable for fastening the 
socket to the ventilation duct, use other more suitable fasteners. There are two 
holes 6 mm diameter spaced at 206 mm in the base of the LKS 02 for mounting 
it.
Two larger holes for the inlet and outlet tubes must also be drilled in the venti-
lation duct (see Figure 06).

Figure 06

Opening the LKS 02 cover

For servicing, the LKS 02 has quick-action clips. By pressing gently on the hous-
ing cover, it is easier to open or close the clips. If the LKS 02 socket is mounted 
inverted, take care, when opening the transparent cover, that parts do not fall 
on the floor (cover, suction tube etc.).

Handling

The connection lead for the Smoke Switch ORS 210 must be passed through the 
plug supplied into the housing and connected. 
The Smoke Switch ORS 210 is screwed into the socket LKS 02.
Then the inlet tube with flow adapter is fitted.
After a positive functional check with test gas, the cover of the LKS 02 can be 
fitted by pressing gently on it and closing the clips. 

Display of Smoke Switch ORS 210

The display of Smoke Switch ORS 210 is visible through the transparent cover of 
the LKS 02 housing.

Application limits 

This Smoke Switch should not be used where quantities of dust, smoke, 
moisture or steam are to be expected from plant operations. Make sure that the 
Smoke Switch will not be subject to dew formation. TheLRS 01 must not be used 
out of doors. These instructions must be taken into account when planning the 
installation.

Содержание LRS 01

Страница 1: ...Ventilation Duct Smoke Switch System LRS 01 Basic Installation Instructions ...

Страница 2: ...Installation Instructions LRS 01 2 HEKATRON Vertriebs GmbH Brühlmatten 9 D 79295 Sulzburg 7002428 100206 VDA Ausgabe 10 02 2006 ...

Страница 3: ...al data 6 3 General information 7 3 1 Operation of the LRS 01 7 3 2 Transport storage and unpacking 7 3 3 Scope of supply 7 4 Rules and regulations 8 5 Installation instructions 9 5 1 Mounting the LKS 02 9 5 2 Electrical connection of the ORS 210 12 6 Commissioning 14 6 1 Functional testing 14 6 2 Display of operating status of the ORS 210 14 7 Maintenance instructions 15 8 Ordering data 16 ...

Страница 4: ...uction Figure 01 The LRS 01 consists of a ventilation duct socket LKS 02 and an ORS 210 optical Smoke Switch with alarm latching It is used for monitoring smoke in ventilation ducts The LKS 02 provides a mounting for Smoke Switch ORS 210 and is fitted on the outside of a ventilation duct The LRS 01 is intended for use inside buildings ...

Страница 5: ...e assumed Disruptive factors which could affect reliable operation of the LRS 01 must be eliminated A2 A2 B B A1 A1 min 3 x a A1 Ideale Betriebsumgebung A2 Erhöhte Staubbelastung B Bereich für Rauchfrüherkennung ungeeignet a Kanalmaß a a Luftstromrichtung Figure 02 Figure 02 provides recommendations for project planning To ensure reliable smoke detection in large ducts several LRS 01 Smoke Switche...

Страница 6: ...e range of the socket LKS 02 and Smoke Switch ORS 210 combi nation is determined by the technical data of the Smoke Switch Temperature range 20 C to 75 C Permissible rel humidity up to 95 RH dewing and steam condensation can cause false alarms Smoke Switch ORS 210 Operating principle light scattering Reaction thresholds to construction and testing rules for smoke triggered installations 12 76 Oper...

Страница 7: ...recy cled Please note the properties of the package The carton in which the LRS 01 is packed complies with minimal package requirements and can support up to 10 times its own weight when stacked The package is only to a limited extent suitable for transport by post or rail For transport in tropical zones transport by sea etc special packages are available For further information please contact the...

Страница 8: ...epublic Rules and regulations of the country in which the equipment is installed must be observed Extract Buildings and their equipment must be constructed so that measures are incorporated to prevent outbreaks of fire and restrict the spread of fire and smoke and so that in the event of a fire the rescue of people and animals and effective fire extinguishing operations are possible As a matter of...

Страница 9: ...s in the tube must be inside the ventilation duct see Figure 04 Figure 04 The tube must not be bent and it must be cut cleanly at right angles When choosing a place to mount the LKS 02 take care that there is enough space to change the inlet tube If the inlet tube has not been shortened a space of at least 470 mm is required outside the duct The LKS 02 must be mounted on the duct using suitable fa...

Страница 10: ...the socket LKS 02 is installed corresponds to the direction of airflow in the duct To help with this the LKS 02 has arrows on its base showing the direction of flow see Figure 05 Figure 05 Warning When mounting the LKS 02 socket it is important to ensure that the airflow direction is correct and that the socket is properly sealed 206 150 Flow direction Flow direction ...

Страница 11: ...transparent cover that parts do not fall on the floor cover suction tube etc Handling The connection lead for the Smoke Switch ORS 210 must be passed through the plug supplied into the housing and connected The Smoke Switch ORS 210 is screwed into the socket LKS 02 Then the inlet tube with flow adapter is fitted After a positive functional check with test gas the cover of the LKS 02 can be fitted ...

Страница 12: ...erly closed For cable entry 4 x M16 plugs are fitted When properly used they comply with the requirements of IP 54 within their 6 10 mm sealing range The sealing plugs can be replaced supplemented by 16 x 1 5 cable glands with M16 x 1 5 locknuts Terminal assignment in socket of LKS 02 Terminal 1 24 V DC Terminal 2 0 V DC Terminal 3 Option communication RS BUS Terminal 4 and 5 Potential free NC Ter...

Страница 13: ... all normal commercially available telecommunications cable with or without screening can be used The conductor cross sections must be chosen to suit the current required by connected equipment and the installed lengths Conductor diameter min 0 6 mm to max 1 4 mm Cable diameter max 9 mm Recommended cable type IY ST Y 4 x 2 x 0 6 mm Only conductors with the same diameter may be connected at a termi...

Страница 14: ... to which the optical Smoke Switch should react can reach it For func tional testing of the Smoke Switch ORS 210 test aerosol 918 5 must be used Test aerosol 918 5 is free of halogenated hydrocarbons CFCs etc If a Smoke Switch does not react when so tested then it must be replaced The inlet tube must be free of any obstructions Warning The warnings and safety instructions on the aerosol can must b...

Страница 15: ... be needed after a shorter period By observing basic maintenance measures according to DIN 31051 in conjunction with DIN EN 13306 the LRS 01 system should be kept permanently ready for operation it should be serviced annually as specified by the manufacturer Test aerosol 918 5 from HEKATRON is to be used for functional testing of Smoke Switch ORS 210 The interaction of all items of equipment and t...

Страница 16: ... 3610370 Locknut M16 x 1 5 3610371 Replacement socket 143 A 5000350 Mains unit NG 519 5400080 Mains unit NAG 03 5400081 Signal display and operating unit SAB 04 4400043 NG 519 with SAB 04 5400083 NAG 03 with SAB 04 5400084 Push button DKT 02 grey 6200118 Push button DKT 02 yellow 6200107 Test aerosol 918 5 6900331 HEKATRON Vertriebs GmbH PO Box 1040 D 79296 Sulzburg Tel 49 76 34 5 00 2 64 FAX 49 7...

Страница 17: ...Installation Instructions LRS 01 17 7002428 100206 VDA Ausgabe 10 02 2006 HEKATRON Vertriebs GmbH Brühlmatten 9 D 79295 Sulzburg ...

Страница 18: ...Installation Instructions LRS 01 18 HEKATRON Vertriebs GmbH Brühlmatten 9 D 79295 Sulzburg 7002428 100206 VDA Ausgabe 10 02 2006 ...

Страница 19: ...Installation Instructions LRS 01 19 7002428 100206 VDA Ausgabe 10 02 2006 HEKATRON Vertriebs GmbH Brühlmatten 9 D 79295 Sulzburg ...

Страница 20: ...HEKATRON Vertriebs GmbH Brühlmatten 9 D 79295 Sulzburg Tel 0 76 34 5 00 264 Telefax 0 76 34 5 00 323 info hekatron de www hekatron de A member of the Swiss Securitas Group ...

Отзывы: