2 of 5 | 20.03.2017
5. Installation/Commissioning
This product can only be installed by a qualified electrician.
The connection lines in the building must be disconnected before installation and secured against being
switched back on. For this, trip the corresponding fuse switch in the building installation.
Make sure that the surface is suitable for permanently and reliably taking the weight of the light.
Using a saw, cut out the installation dimensions at the desired position. Used the fixed retainer clips to
mount the LED recessed spotlight. Make sure that no lines are damaged.
Now connect the building installation's connection lines to the screw terminals on the transformer The
brown (or black) cable is generally the phase conductor - connect this to the terminal marked with "L".
The blue conductor must be connected to the terminal marked with "N".
Now you can easily connect the light and transformer using the attached plug connector.
Do not bend the cables; make sure that the cables and plugs are not subject to tension or torsional
forces. Protect all cables and insulation against possible damages.
Check proper connection once again.
Switch the building installation's fuse switch back on.
Proceed as follows to program the lights using the remote control:
Caution:
Only connect the respective spotlight with the power supply to learn/unlearn!
1.
Leave the light
switched on
at first for
10 seconds
using the light switch
2.
Now switch
off
the light for
10 seconds
using the light switch
3.
Switch the light
back on
4.
Now press the
activation button
for the required channel (1,2,3,4)
3 times
5.
The briefly light flashes
3 times
- the light and remote control are
programmed
Unlearning the spotlight:
1.
Follow the same points 1-3 as for learning (remote control programming)
2.
Now press the activation button for the required channel (1,2,3,4) 5 times
3.
The light briefly flashes 5 times and is now unlearned.