Heinrichs PITe-Series Скачать руководство пользователя страница 7

Heinrichs Messtechnik

 

Installation and Operation Manual PITe  

 

Page 7 of 22 

5.3  Installation commissioning and maintenance 

The devices described in this manual are to be installed and serviced only by qualified technical 
personnel such as a qualified Heinrichs Messtechnik electronics engineer or service technician.  

Warning

 

Before servicing, the device must be completely deenergised and disconnected from 
all peripheral devices. The technician must also check to ensure that the device is 
completely off-circuit. Only original replacement parts are to be used. 

5.4  Replacing the transmitter electronics 

Before replacing the transmitter electronics, read first the safety instructions in this section. 

Warning

 

Make sure that you abide by the applicable standards and regulations pertaining to 
electrical devices, device installation and process technology when replacing the 
transmitter electronics. The highly integrated electronic components in the device 
carry the risk of ESD hazards and are only protected when installed in the device 

pursuant to EMC standards. 

Caution 

The complete electronic stack is to be replaced with all of its printed circuit boards 
(except for the memory chip (DSM)). The specified precision and interchangeability of 
the electronics are only guaranteed if the electronic stack is replaced as a whole. 

Heinrichs Messtechnik GmbH accepts no liability for loss or damage of any kind arising from improper 
operation of any product, improper handling or use of any replacement part, or from external electrical 
or mechanical effects, overvoltage or lightning. Any such improper operation, use or handling shall 
automatically invalidate the warranty for the product concerned. 

In the event a problem arises with your device, please contact us at one of the following numbers to 
arrange to have your device repaired: 

Phone: +49 221 49708-0 

Fax: 

+49 221 49708-178 

Contact our customer service department if your device requires repair or if you need assistance in 
diagnosing a problem. 

5.5  Returning the device for repairs or servicing 

Note: 

According to German waste disposal legislation, it is the owner’s or customer’s responsibility to 

dispose of hazardous waste. Thus, before any devices are returned to Heinrichs Messtechnik for 
servicing or repairs the following measures must be performed: 

  When returning the unit for an inspection, please enclose as detailed a description as possible 

of the fault and the specific application, as well as the chemical-physical properties of the 
measurement medium. 

  Remove all residue of measurement medium which may be present. 

p

aying special attention 

to the gasket grooves and crevices. This is especially important if the medium is detrimental to 
health and safety, for example: corrosive, poisonous, carcinogenic or radioactive etc. 

  Costs, which result from insufficient cleaning, (disposal and/or personal injuries) will be 

invoiced to the customer. 

A decontamination certificate, to be found in section 12 “Declaration of Decontamination“, must be 
completed and enclosed in the return delivery! 

Содержание PITe-Series

Страница 1: ...Installation and operating manual Please read the instructions carefully and store them in a safe place Magnetic Inductive Flow Velocity Sensor PITe with UMF2 B...

Страница 2: ...HE TRANSMITTER 8 6 3 1 Sensor versions 9 6 4 PERFORMANCE CHARACTERISTICS 9 7 INSTALLATION CONDITIONS OF USE 10 7 1 INSTALLATION REQUIREMENTS 10 7 1 1 Examples of installation positions 10 7 1 2 Immers...

Страница 3: ...Heinrichs Messtechnik Installation and Operation Manual PITe Page 3 of 22 13 DECLARATION OF CONFORMITY 20 14 FINAL NOTES 22...

Страница 4: ...rnings in this document are defined in the four categorised terms below and are aimed to prevent putting operators and maintenance personnel at risk or to avoid material damage The used terms have wit...

Страница 5: ...ied out by qualified and authorised technicians only Heinrichs Messtechnik GmbH extends no express or implied warranty in regard to the applicability of the present document for any purpose other than...

Страница 6: ...spects during commissioning and maintenance 5 1 Use of this manual and targeted personnel This document contains all the necessary information to ensure a correct operation of the herein described pro...

Страница 7: ...improper operation of any product improper handling or use of any replacement part or from external electrical or mechanical effects overvoltage or lightning Any such improper operation use or handli...

Страница 8: ...2 System configuration The magnetic inductive PITe UMF2 B flow measurement system consists of a sensor PITe which picks up an induced measuring signal from the medium flowing through the pipe with a k...

Страница 9: ...ptor 40mm with M52x2 sensor locking with rotation lock DN25 PN40 Form B1 DIN EN1092 1 JIS 16K 1 class 150 300RF ASME B16 5 6 4 Performance Characteristics Measurement accuracy Q 30 FS 1 5 of actual ra...

Страница 10: ...tandard the minimum straight run of pipe ahead of the inlet must be 10 pipe diameters 10 x DN and 5 pipe diameters following the outlet 5 x DN DN nominal diameter of pipe The limits for the product an...

Страница 11: ...r is an additional safety feature for recognizing empty or partially filled pipes Caution There is the danger of accumulation of solids in the vacinity of a siphon The installation of a cleaning apert...

Страница 12: ...selected so that the installation pipe with the sensor is continually filled with the medium This requirement can be met by using drains and check valves Installation of pumps To avoid negative pressu...

Страница 13: ...threaded version Installing the flanged version 7 1 3 Earthing potential equalisation The sound grounding concept of the flowmeter is a necessity for both safety reasons as well as to ensure a faultle...

Страница 14: ...be taken if the window of the transmitter enclosure becomes fogged over or discolored This is a sure sign that moisture water or product medium has seeped into the terminal compartment of the housing...

Страница 15: ...8 4 Zero point calibration To ensure precise measurements are obtained zero point calibration is essential the first time the device is put into operation and before any regular operations is carried...

Страница 16: ...2 B transmitter combination has not been performed by the manufacturer the necessary settings must be implemented in the transmitter before the sensor can operate correctly This applies in particular...

Страница 17: ...gth as can be seen in the graphic below The unbraided strands must lie over the O ring whos function it is to press the braids of the outer shield onto the metal cable gland This O ring does not serve...

Страница 18: ...Heinrichs Messtechnik Installation and Operation Manual PITe Page 18 of 22 11 Dimensions weight 11 1 Dimensional drawings Threaded version standard Flanged version optional...

Страница 19: ...ng the following fluid Since the used fluid is potentially hazardous to water toxic corrosive combustible we have checked all cavities on the device to ensure that they are free of fluid residues wash...

Страница 20: ...en entspricht We declare herewith in sole responsibility that the product described above is conform with the provisions of the following EU directives including all published changes and amendments a...

Страница 21: ...linie Direktive Norm Ref Nr Standard Ref No DIN Ausgabe Edition Kurz Beschreibung Short Description UMF2 B PIT PITe 2014 30 EU EN 61000 6 2 2011 06 Immunity Industry X X X EN 61000 6 3 2012 11 Emissio...

Страница 22: ...losed We plan to optimize and improve the products described and in so doing will incorporate not only our own ideas but also and in particular any suggestions for improvement made by our customers If...

Отзывы: