background image

 

 

 

 

Installation and operating manual 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Please read the instructions carefully and store them in a safe place 

 

Magnetic-Inductive Flow Velocity Sensor 

 

 
PITe with 
UMF2 (B) 

Содержание PITe-Series

Страница 1: ...Installation and operating manual Please read the instructions carefully and store them in a safe place Magnetic Inductive Flow Velocity Sensor PITe with UMF2 B...

Страница 2: ...HE TRANSMITTER 8 6 3 1 Sensor versions 9 6 4 PERFORMANCE CHARACTERISTICS 9 7 INSTALLATION CONDITIONS OF USE 10 7 1 INSTALLATION REQUIREMENTS 10 7 1 1 Examples of installation positions 10 7 1 2 Immers...

Страница 3: ...Heinrichs Messtechnik Installation and Operation Manual PITe Page 3 of 22 13 DECLARATION OF CONFORMITY 20 14 FINAL NOTES 22...

Страница 4: ...rnings in this document are defined in the four categorised terms below and are aimed to prevent putting operators and maintenance personnel at risk or to avoid material damage The used terms have wit...

Страница 5: ...ied out by qualified and authorised technicians only Heinrichs Messtechnik GmbH extends no express or implied warranty in regard to the applicability of the present document for any purpose other than...

Страница 6: ...spects during commissioning and maintenance 5 1 Use of this manual and targeted personnel This document contains all the necessary information to ensure a correct operation of the herein described pro...

Страница 7: ...improper operation of any product improper handling or use of any replacement part or from external electrical or mechanical effects overvoltage or lightning Any such improper operation use or handli...

Страница 8: ...2 System configuration The magnetic inductive PITe UMF2 B flow measurement system consists of a sensor PITe which picks up an induced measuring signal from the medium flowing through the pipe with a k...

Страница 9: ...ptor 40mm with M52x2 sensor locking with rotation lock DN25 PN40 Form B1 DIN EN1092 1 JIS 16K 1 class 150 300RF ASME B16 5 6 4 Performance Characteristics Measurement accuracy Q 30 FS 1 5 of actual ra...

Страница 10: ...tandard the minimum straight run of pipe ahead of the inlet must be 10 pipe diameters 10 x DN and 5 pipe diameters following the outlet 5 x DN DN nominal diameter of pipe The limits for the product an...

Страница 11: ...r is an additional safety feature for recognizing empty or partially filled pipes Caution There is the danger of accumulation of solids in the vacinity of a siphon The installation of a cleaning apert...

Страница 12: ...selected so that the installation pipe with the sensor is continually filled with the medium This requirement can be met by using drains and check valves Installation of pumps To avoid negative pressu...

Страница 13: ...threaded version Installing the flanged version 7 1 3 Earthing potential equalisation The sound grounding concept of the flowmeter is a necessity for both safety reasons as well as to ensure a faultle...

Страница 14: ...be taken if the window of the transmitter enclosure becomes fogged over or discolored This is a sure sign that moisture water or product medium has seeped into the terminal compartment of the housing...

Страница 15: ...8 4 Zero point calibration To ensure precise measurements are obtained zero point calibration is essential the first time the device is put into operation and before any regular operations is carried...

Страница 16: ...2 B transmitter combination has not been performed by the manufacturer the necessary settings must be implemented in the transmitter before the sensor can operate correctly This applies in particular...

Страница 17: ...gth as can be seen in the graphic below The unbraided strands must lie over the O ring whos function it is to press the braids of the outer shield onto the metal cable gland This O ring does not serve...

Страница 18: ...Heinrichs Messtechnik Installation and Operation Manual PITe Page 18 of 22 11 Dimensions weight 11 1 Dimensional drawings Threaded version standard Flanged version optional...

Страница 19: ...ng the following fluid Since the used fluid is potentially hazardous to water toxic corrosive combustible we have checked all cavities on the device to ensure that they are free of fluid residues wash...

Страница 20: ...en entspricht We declare herewith in sole responsibility that the product described above is conform with the provisions of the following EU directives including all published changes and amendments a...

Страница 21: ...linie Direktive Norm Ref Nr Standard Ref No DIN Ausgabe Edition Kurz Beschreibung Short Description UMF2 B PIT PITe 2014 30 EU EN 61000 6 2 2011 06 Immunity Industry X X X EN 61000 6 3 2012 11 Emissio...

Страница 22: ...losed We plan to optimize and improve the products described and in so doing will incorporate not only our own ideas but also and in particular any suggestions for improvement made by our customers If...

Отзывы: