![Heinrichs PIT Series Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/heinrichs-0/pit-series/pit-series_operating-manual_2119974012.webp)
Heinrichs Messtechnik GmbH
Operating Manual PIT-UMF2 (B)
Page 12 of 14
14.2.1 Wiring diagram for remote installation
The outer shield hast o be connected to the metalized cable glands at both ends. The inner shields
are connected to each other and are plugged into the terminal with the
label “Schirm / shield”.
For more details on wiring see Instruction Manual UMF2 (B)(b)_BA_01_eng.pdf