Pleasure ensure that there is no tension when routing the cables and that the plug and 
crimp are properly connected!  

 

Depending on the module performance and inverter type, different length strings are 
possible. Make absolutely sure that the permissible system voltage cannot be achieved 
at full-load (V

OC

) and at low temperatures. 

Parallel boarding of PV modules 

When wiring our brand modules, it should be noted that string fuses (safety fuse 16 A) must be used for the parallel 
boarding of more than 2 strings.  

The maximum reverse current load capacity is 20 A. Where more than two strings are connected in parallel, this may 
be exceeded in the case of a fault.

 

 

Electrical installation 

Connection of the inverter to the public electricity network must be carried out by an authorised specialised company.  

 

 

Even at low solar radiation, there is high DC voltage. Never touch unpro and - 
cables that are in operation! 

Equipotential bonding    

The requirements for the lightning and surge protection are dependent on the local conditions. Where there is already 
an external lightning protection system in place or planned for the building, the PV system must be integrated in the 
protection system against a direct lightning strike.  

When using transformer-less inverters, due to the galvanic isolation, equipotential bonding may be required for reasons 
of personal safety. Country-specific laws shall apply. 

The responsibility for a professional equipotential bonding of the module frame lies with the installing company. Country-
specific standards must be adhered to. 

A hole is drilled in the middle of the short sides of the module frame for equipotential bonding, and is marked with the 
corresponding symbol (Figure 8). 

An M4 screw is required for equipotential bonding. The fixing must be carried out using a spring washer or toothed 
washer to ensure that the anodized layer is penetrated.  

                                                             

            

Figure 8: Equipotential bonding symbol and execution 

Fire prevention 

The installation of on-roof systems can affect the fire safety of a building; improper installations can result in a hazard 
in case of fire. Please observe LBO Building Law requirements. In the event of on-roof systems, the Heckert Solar 
brand modules must be installed above a fire-resistant surface (“hard roofing” in accordance with DIN 4102-4). The 

-

 

Cable clamp 

-

 

Screw 

-

 

Toothed washer 

-

 

Nut 

Содержание NeMo 3.0

Страница 1: ...Installation and operating manual www heckert solar com Status 08 2021...

Страница 2: ...ny time without prior notice Please use the most current copy You can find this on our homepage under http www heckertsolar com de downloads partner download center montage html This installation and...

Страница 3: ...veral hours Rear ventilation The output of solar modules decreases considerably as the modules heat up Rear ventilation avoids yield impairing heat accumulation The so called chimney effect draught be...

Страница 4: ...e modules in their packaging until ready for installation Always set the pallets on a reinforced level ground and do not stack them under any circumstances Standard packaging Picking packaging Number...

Страница 5: ...ease observe the specific instructions for handling solar modules with AR glass Compared with non coated glass the surface of AR glass has a similar resistance to mechanical or chemical influences and...

Страница 6: ...llation situation and the system used Please observe the installation situations in the following table and the resulting maximum load capacity of the modules The values shown Figure 3 correspond to t...

Страница 7: ...installation and to facilitate installation our module frames are fitted with holes for load restraints Screws with hexagon socket head caps are fixed in these holes in the module frame The screws are...

Страница 8: ...trained and skilled personnel No damaged modules may be installed Both external connector sockets are fitted with a cable 1150 mm in length and connectors The socket is located on the right hand side...

Страница 9: ...or to the inverter Please use solar cables that comply with the standard EN 50618 class 5 and the respective requirements The minimum cross section is 4mm Cable losses should be 1 At greater distances...

Страница 10: ...lightning protection system in place or planned for the building the PV system must be integrated in the protection system against a direct lightning strike When using transformer less inverters due...

Страница 11: ...nd service warranty Information and terms for our product and service warranties can be found on our homepage under www heckert solar com 9 Exclusion of liability These installation and operating inst...

Страница 12: ...12 Excerpt from MC4 crimping instructions Multi contact source...

Страница 13: ...13...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...16...

Страница 17: ...17 Heckert Solar GmbH Carl von Bach Stra e 11 D 09116 Chemnitz...

Отзывы: