
4
Correct installation modes of probe
Please strictly select installation position and installation mode. Since the
incorrect installation will cause the reading error.
1)
The electrode should be installed in a place in the circulating and closed pipeline
where the stream is steady and air bubbles are hard to generate.
2)
No matter the concentric electrode is horizontally, slant or vertically installed,
the front head should be deeply inserted into the moving water and face to water
flow direction installation.
3)
The conductivity signal is weak electronic signal and its collecting cable should
be separately installed. When threading cable joint or connecting terminal board
is used, to avoid wetting interference or breakdown of measurement unit circuit,
they should not be connected to the same group of cable joint or terminal board
with the power line or control line.
4)
The cable of electrode is special cable and has standard length before leaving
factory. Any customization for the cable length, it’s recommended to make an
agreement with the factory before placing an order.
5)
Please keep the measuring part of electrode clean, and do not directly contact the
surface by hands or contact with the oil stain objects to avoid inaccurate
measurement.
6)
Electrode is a kind of precision components, so please do not change any part of
the electrode. The accuracy will be incorrect if the electrode was destroyed by
the strong acid, strong alkali, scrape from machine and etc.
7)
The meter is made by precision integrated circuit and electronic components, so
it needs to place in case or dry environment.
8)
In order to guarantee the safety operation, please checking after installation then
switch on.