System Control and Economy Measures  

 
Important 

It is very important that since the boiler stores heat to avoid using peak rate power, all pipes in the vicinity 
of the boiler and outside the heated areas in the house (i.e. under the floors and in the attic), should be 
insulated with good quality insulation, minimum thickness of 25mm to prevent standing heat loss. 
  

Failure to insulate

 

can lead to very high electricity bills

.  

 
In addition care must be taken to avoid gravity feeding, hot water travelling upwards and heating radiators 
upstairs with the pump off. This draws heat from the boiler when it is not required. 

 
System Control

 

 
It is important for reasons of economy that there is proper control over the heating system. For this reason 
it is recommended that the Danfoss TP5000, or similar programmer is used. This programmer is battery 
operated and as such does not require a power supply, which means it will retain the set program in the 
event of a power failure. It serves as a room thermostat and time clock combined, thus removing the need 
to provide a by-pass radiator. This type of programmer also serves as a frost stat, which will bring the 
heating on if the temperature in the house drops below 5deg C. Provided of course the boiler is switched 
on. 
It is recommended that the programmer is set up in the sitting room, in a position where it is not influenced 
by heat from the radiators or sunlight. If the sitting room contains a solid fuel fire or any other form of 
additional heating, then an alternative site must be considered such as the hall. 
The radiators throughout the house should be fitted with thermostatic valves, except in the room where the 
programmer is sited. 
This would mean that the rooms would be controlled by the thermostatic valves and because they are 
usually smaller, or require a lower temperature, the required heat will be achieved before the sitting room. 
When the sitting room reaches temperature the pump is switched off, this removes the need for a by-pass 
radiator wasting heat from a pump circulating heat round a house which has achieved temperature. 
It should also be considered that the amount of water in the system is kept to a minimum by the use of low 
capacity radiators. When the system is switched on all the cold water in the radiators and pipes has to be 
reheated by the boiler and that has to be paid for! 
 

______________________________________ 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание 215 DSS/12Kw

Страница 1: ...ion Vessel Fixing Brackets Central Heating Expansion Charging Kit 2 Stainless Steel Braided Connectors Installer Owners Instruction Manuel Installation User Instructions for Combination Boiler Models 215 DSS 12Kw 215DSS 15Kw To be left with The Householder beside the boiler for future reference After Commissioning System ...

Страница 2: ...r Specification 12 Manufacturers Guarantee 13 User instructions 14 Fault Correction 15 Maintenance 15 Hydro Electric Total Control Tariff 16 Boiler front view 17 Manufacturer Electric Central Heating Company Ltd Emtex House Benneworth Close Hucknall Nottingham NG15 6EL Tel 0115 968 1273 Installed by Name_______________________________________________ Address________________________________________...

Страница 3: ...able If the water supply pressure can not be relied on then a vented system can be considered Heatwell should be contacted for assistance with the planning of the vented installation so that the maker s guarantee remains intact If the boiler is used in an area where the temporary hardness exceeds 200ppm to comply with warranty an approved scale inhibitor must be fitted to the cold water supply of ...

Страница 4: ...a fitted pipe to a drain The diagram above shows the plumbing connections to the boiler which consist of the mains water supply 22mm pipe Domestic Hot Water supply from the Mixing valve pre set at 55deg C balanced cold water supply for mixer shower Central Heating flow and return pipes and expansion vessels as shown in the diagram All fittings must be checked for leak tightness along with the fact...

Страница 5: ...RNING The outlets for the T P relief valve and expansion relief valve must not be used for any other purpose No other valve may be fitted between the expansion valve or the temperature and pressure relief valve and the storage boiler Take great care not to allow debris or jointing tape to get into the system as this could impair the operation of the safety valves Tundish worked example The example...

Страница 6: ...13m Subtract the resistance for 4 No 28mm elbows at 1m each 4m Therefore the maximum permitted length equates to 9m i e the actual length is 7m A 28mm D2 copper pipe will be satisfactory Diagram 1 Typical discharge pipe arrangement 3 9 The discharge pipe D1 from the vessel up to and including the tundish is generally supplied by the manufacturer of the hot water storage system see paragraph 3 5 Wh...

Страница 7: ...d is positioned to prevent contact whilst maintaining visibility 3 Discharges at a high level e g in to a metal hopper and metal down pipe with the end of the discharge pipe clearly visible tundish visible or not or onto a roof capable of withstanding high Temperature Pressure Relief Valve temperature discharges of water and 3m from any plastic guttering systems that would collect such discharges ...

Страница 8: ...oad carried and should be run from the switch fuse or MCB to an isolator with two pole disconnection and a minimum contact separation of 3mm adjacent to the boiler From the local isolator to the boiler a cable should be run in conduit the same size as was used to bring the supply from the switch fuse or MCB WARNING THIS APPLIANCE MUST BE EARTHED FITTED WITH AN EARTH LEAKAGE CIRCUIT BREAKER Wiring ...

Страница 9: ...9 Boiler Control and Mains power Connections Commissioning Commissioning can only be carried out when the electrical and plumbing work is completed including the electric metering ...

Страница 10: ...lling loop disconnected by filling the required amount of inhibitor through the 15mm pipe stub provided for the auto air vent on the flow side of the central heating system on top of the boiler The heating system can then be filled to its proper pressure of 1 5Bar the pump should be run for some time to expel all the air from the system including bleeding the radiators Finally the radiators should...

Страница 11: ...mmer also serves as a frost stat which will bring the heating on if the temperature in the house drops below 5deg C Provided of course the boiler is switched on It is recommended that the programmer is set up in the sitting room in a position where it is not influenced by heat from the radiators or sunlight If the sitting room contains a solid fuel fire or any other form of additional heating then...

Страница 12: ...Kg Heating System Pressure Relief Valve Setting Expansion Vessel Pre charge Pressure System Cold Pressure 3Bar 1 5Bar 1 5Bar Domestic Hot Water Store Heatwell 12 215Ltrs 100 Heat up Time 15Deg C to 80Deg C 5Hrs 29Min 70 Re heat Time 4Hrs 42Min T PR Valve Opening Temperature Pressure Relief Valve Setting Pressure Reduction Valve 95Deg Celsius 6Bar 3Bar Expansion Vessel Capacity Central Heating Expa...

Страница 13: ...or hire purchase documents is required if service under guarantee is required Any service under guarantee will not alter the original expiry date at the end of the 24 month period 5 Warranty registration card must be completed and returned to register your guarantee Failure to do so may result in a delay should any fault arise 6 Scale will build up in hard water areas with a boiler operating at hi...

Страница 14: ... a standard heating programmer room thermostats and thermostatic radiator valves common to all wet central heating systems Reference should be made to the makers instructions supplied with this equipment Hot Water Hot water is supplied from the boiler through a mixing valve located on the boiler hot water outlet pipe This valve is factory pre set at 55Deg C and should not normally require adjustme...

Страница 15: ...e serviced annually by the installer or his approved agent It is also recommended that the concentration of the central heating protector be checked to ensure that the boiler and radiator system are protected against corrosion In addition the following checks must be made 1 The correct operation of the expansion pressure relief valves central heating and hot water systems 2 The correct operation o...

Страница 16: ...length and load carried They should be run from the switch fuse or MCB to an isolator with two pole isolation in both circuits of a minimum contact separation of 3mm to a location in adjacent to the boiler If the boiler is situated in the same space as the supply companies meter then this isolator will not be required From the local isolator cables should be run in conduit the same size as was use...

Страница 17: ...17 Heatwell Stainless Steel Electric Combination Boiler With front Cover Removed to show location of Electrical Components Warning There are live electrical components Under the front cover ...

Отзывы: