Heatrae Sadia Multipoint 10 and 15 litre Скачать руководство пользователя страница 11

11

System malfunction

 

`

Explain how to isolate electrical and water 

supplies in case of a fault.

 

`

Explain  that  a  qualified  plumber  and/or 

electrician should be contacted if there is a fault.

 

`

Explain how to identify/check basic faults.

Maintenance

 

`

Explain the necessity to carry out regular 

maintenance of the product to ensure its 

continued safe and efficient operation.

Literature

Hand over the Installation and user instructions.

 

`

The product stores water at the temperature set 

on the adjustable thermostat. This can be set to 

give temperatures in the range of 10 to 70°C. To 

avoid any risk of freezing when the product is not 

in use for long periods during the winter months, 

do not switch off the electrical supply and set the 

thermostat to its minimum position. N.b. this will 

not protect other system pipework.

 

`

The thermostat can also be locked in either the 

mid range or a “hot” (recommended when using 

in conjunction with a Thermostatic     Blending 

Valve) position. To lock the thermostat position, 

the instructions given under Sections 4.2.3 

or 4.2.4 should be followed. We recommend 

that this procedure is carried out by a qualified 

electrician.

 

`

The indicator light will be illuminated when the 

product is heating.

8.  Operation

8.1 General

WARNING

 

`

Do not block or restrict the 

discharge from any safety valve 

fitted. 

 

`

Do not tamper with any safety 

valve fitted. 

 

`

If water discharges from any 

safety  valve  fitted,  switch  off  the 

electrical supply to the product 

immediately. Contact the Heatrae 

Sadia Service Team (Tel: 0844 

8711535) or an approved installer. 

Do not turn the electrical supply 

on again until the product has 

been checked and approved by a 

qualified installer.

Following Installation and Commissioning of the 

product, the operation should be fully explained to 

the user.

Hot water

 

`

Indicate the location of the product and identify 

the outlets to which it is connected.

 

`

Explain that the temperature is set upon 

installation  and  confirm  the  temperature  which 

the water is set at.

Содержание Multipoint 10 and 15 litre

Страница 1: ...Multipoint 10 and 15 litre Fitting Instructions...

Страница 2: ...cise warranty details to customers Contents 1 Introduction 3 1 1 General 3 1 2 Symbols used 3 1 3 Abbreviations 3 1 4 Liabilities 3 2 Safety 4 2 1 General safety warnings 4 2 2 Recommendations 4 2 3 S...

Страница 3: ...in product quality All the specifications stated in this document are therefore subject to change without notice Our liability as the manufacturer may not be invoked in the following cases Failure to...

Страница 4: ...in any circumstance 2 Safety 2 1 General safety warnings DANGER This product is unvented and as such becomes pressurised when in operation The combination of pressurisation and hot water could lead t...

Страница 5: ...maintained and disposed of at end of life See Section 3 11 Electrical rating 3kW 240V 2 75kW 230V 4 5kW 240V 4 1kW 230V Capacities 10 or 15 litres Weight full 10 litre 16 9kg 15 litre 23 8kg Rated pr...

Страница 6: ...relief valve Pressure relief expansion valve Note If pressure reducing valve is used expansion down the mains is not possible Pressure relief expansion valve Pressure relief expansion valve Expansion...

Страница 7: ...gineer in accordance with prevailing and national regulations as listed below Building Regulations The Building Standards Scotland The Building Regulations Northern Ireland I E E Electrical Regs UK Wa...

Страница 8: ...environment The pipe from the valves to the tundish should be 15mm o dia minimum From the tundish to the point of discharge the pipe should be 22mm o dia minimum and have a resistance to flow equivale...

Страница 9: ...t be earthed It is suitable for a c supply only Disconnect the electrical supply before removing the terminal cover Installation must be in accordance with the current I E E Wiring Regulations The pro...

Страница 10: ...l After filling the installation with water in the previous section please follow the following steps to complete the installation of the product WARNING DO NOT switch on the product until it has been...

Страница 11: ...d when using in conjunction with a Thermostatic Blending Valve position To lock the thermostat position the instructions given under Sections 4 2 3 or 4 2 4 should be followed We recommend that this p...

Страница 12: ...y by unscrewing the five securing screws a tapped jacking point is provided Remove any loose scale from the container Carefully clean off any scale from the element and thermostat pocket DO NOT clean...

Страница 13: ...relief valve intermittently A Expansion in mains not possible A Fit pack U2 see important installation points B Mains pressure exceeds 0 41 MPa 4 1 bar B Fit packs U1 and U2 C Pack U1 fitted without...

Страница 14: ...oduct is manufactured from many recyclable materials At the end of its useful life it should be disposed of at a Local Authority Recycling Centre to realise the full environmental benefits Insulation...

Страница 15: ...hin 60 days of installation the user completes and returns the certificate supplied along with proof of purchase to register the product The product is not covered against damage by frost and the imme...

Страница 16: ...sponsibility and sustainability charters and reduce our printed material we encourage you to download product brochures from our website In designing these files we have taken into account the need to...

Отзывы: