Unvented Hot Water Cylinder

25

INST

ALLA

TION AND

COMMISSIONING  INSTRUCTIONS (2)

Commissioning

Filling and flushing the MEGAFLO Eco Solar

 

Ensure that all fittings and immersion heaters are correctly fitted and tightened. An immersion heater key spanner is provided to aid in tightening 
the immersion heater(s).

i)  Open a hot tap furthest from the MEGAFLO 

Eco

 Solar.

ii)   Open the isolating valve on the 3  Bar Pressure Reducing Valve by turning the blue handle on the stop cock (if fitted in this position) so that it lies 

parallel to the direction of flow. Open the mains stop cock to fill the unit. When water issues from the tap, allow to run for a few minutes to 
thoroughly flush through any residue, dirt or swarf, then close tap.

iii) Open successive hot taps to purge any air from the system.

iv) Check all connections for leaks and rectify as necessary.

v)  The Strainer housed within the 3 Bar Pressure Reducing Valve should be cleaned to remove any debris that may have been flushed through the 

main supply pipe. Refer to Section 3, (p. 28) 

 

for instructions on how to do this.

WARNING: If the installation is to be left unused following installation and commissioning, e.g. 

unoccupied properties, the water heater should be drained or regularly flushed through with fresh 

mains water once a week.

When placing the unit into service, the procedure for filling the unit and the system checks above 

should be observed.

Check the operation of the Safety Valves

 

i)   Slowly, manually open (turn black knob on end counter-clockwise), for a few seconds, the Temperature and Pressure Relief Valve (T&P Valve) 

situated on the MEGAFLO 

Eco

 Solar unit (see Figure 1, p.5). Check water discharged runs freely away through the tundish and discharge 

pipework. Close valve, ensure water flow stops and valve reseats correctly.

ii)  Repeat for the 8 Bar Pressure Relief Valve (see Figures 5 and 6, p. 13).

NOTE: The water discharged may be very hot

Indirect Units (Solar Primary Circuit)

Fill the solar primary circuit following the instructions provided with the solar hydraulic controls. The cylinder temperature control sensor probe 
supplied with the solar differential temperature controller must be inserted into the pocket in the lower controls housing and its cable securely 
clamped. Heating by the solar primary circuit is controlled by the solar differential temperature controller, refer to the manufacturer’s installation 
instructions for details of how to set up and commission the solar primary circuit. The solar controller should be programmed to give a maximum 
storage temperature in the MEGAFLO 

Eco

 Solar of 70

o

C although 60

o

C is recommended to minimise scaling.

 

Direct Units

 

Switch on the electrical supply to the immersion heater(s) and allow the unit to heat up. Check that the thermostat operates correctly. A storage 
temperature of approx. 60ºC is recommended. If necessary the temperature can be adjusted by inserting a flat bladed screwdriver in the adjustment 
knob on top of the immersion heater thermostat and rotating clockwise (see Figure 16, p. 23). The full adjustment represents a temperature range 
of between 12º and 68ºC. Check that no water is discharged from either the Expansion Valve or Temperature and Pressure Relief Valve during the 
heating cycle.

I

ndirect Units

 

Fill the indirect (primary) circuit following the boiler manufacturer’s commissioning instructions. To ensure the primary heating coil in the MEGAFLO 

Eco

 Solar is filled the 2-port motorised valve (supplied) should be manually opened by moving the lever on the motor housing to the 

MAN OPEN

 

position. When the primary circuit is full return the lever to the AUTO position. Vent any trapped air by opening the air bleed.

Switch on the boiler, ensure the programmer is set to Domestic Hot Water. Allow the MEGAFLO 

Eco

 Solar unit to heat up and check that the 

indirect thermostat and 2-port motorised valve operate correctly. A storage temperature of approx. 60ºC is recommended. If necessary the 
temperature can be adjusted by inserting a flat bladed screwdriver in the adjustment knob (located on the front of the thermostat mounting bracket 
see Figure 16, p. 23 ) and rotating clockwise to increase the temperature or counter clockwise to reduce the temperature. The minimum thermostat 
setting is 12ºC. The adjustment range on the combined thermostat and thermal cut-out is 12°C-68°C

Check that no water is discharged from either the Expansion Valve or Temperature and Pressure Relief Valve during the heating cycle.

Benchmark

tm

 Log Book

 

On completion of the installation and commissioning procedures detailed in this Product Guide the Benchmark

TM

 “Installation, Commissioning 

and Service Record Log”, pages 34 and 35, should be completed and signed off by the competent installer or commissioning engineer in the 
relevant sections. The various system features, location of system controls, user instructions and what to do in the event of a system failure should 
be explained to the customer. The customer should then countersign the Benchmark

TM

 commissioning checklist (page 34) to accept completion. 

The Service Record should be filled in when any subsequent service or maintenance operation is carried out on the MEGAFLO 

Eco

 Solar unit (See 

Maintenance and Servicing, p. 35).

Содержание Megaflo Eco Solar Series

Страница 1: ...Unvented Direct Indirect Solar Megaflo Product Guide Hot Water Cylinders...

Страница 2: ...Contents Product Specification Page 3 Installation and Commissioning Instrucions Page 11 Maintenance and Servicing Page 27 User Guide Page 36...

Страница 3: ...Introduction Checklist General Requirements Water Supply Power Supply The Environment Specification and Dimensions 3 Unvented Hot Water Cylinder PRODUCT SPECIFICATION 1...

Страница 4: ...levels exceed the latest requirements of Building Regulation Part L The MEGAFLO Eco Solar unvented water heater can be fed directly from the cold water mains supply to the property without the need f...

Страница 5: ...are subject to freezing must be avoided Ensure that the floor is of sufficient strength to support the full weight of the unit refer to Tables 3 and 4 on page 9 for unit weights Pipe runs should be k...

Страница 6: ...opriate Building Regulations either The Building Regulations England The Building Regulations Scotland or Building Regulations Northern Ireland The Water Fittings Regulations England and Wales or Wate...

Страница 7: ...ns All connections accept 22mm outside diameter pipe compression nuts and olives supplied Thread rate is 3 4 BSP male parallel to accept standard 3 4 BSP female fittings if required Safety features Di...

Страница 8: ...8 Unvented Hot Water Cylinder PRODUCT SPECIFICATION 1 Fig 2 Megaflo eco Solar Direct A D 373 454 414 C B 47 27 30 45 73 600 Fig 3 Megaflo eco Solar Indirect A 373 454 414 E D F C 7 3 600 47 27 30 45...

Страница 9: ...IGHT kg SIZE EMPTY FULL AUXILLARY VOLUME L AUXILLARY COIL SPECIFICATIONS SURFACE sqm HEAT UP mins RECOVERY mins RATING kW 170 210 260 300 37 8 42 5 47 3 61 5 207 8 252 5 307 3 361 5 N A 60 60 60 N A 7...

Страница 10: ...10 Unvented Hot Water Cylinder NOTES PRODUCT SPECIFICATION 1...

Страница 11: ...General Installation Indirect Model Direct Model Commissioning Unvented Hot Water Cylinder 11 PRODUCT SPECIFICATION 1 INSTALLATION AND COMMISSIONING INSTRUCTIONS 2...

Страница 12: ...Figure 4 below The 3 Bar Pressure Reducing Valve can be connected anywhere on the cold water mains supply prior to the MEGAFLO Eco Solar unit There is no requirement to site it close to the unit it c...

Страница 13: ...Valve 3 Bar Pressure Reducing Valve Stopcock 8 Bar Pressure Relief Valve See Figure 5 below This should be installed between the 3 bar Pressure Reducing Valve and the MEGAFLO Eco Solar cylinder Shoul...

Страница 14: ...o Kitchen unbalanced cold mains supply Incoming Cold Water Main KEY MCWS Mains Cold Water Supply HWS Hot water Service SC Stop Cock Isolating Valve DOC Drain Off Cock Discharge pipe to atmosphere see...

Страница 15: ...o SOLAR FOR ANY OTHER PURPOSE IT MUST NOT BE USED IN PLACE OF THE SOLAR PRIMARY SYSTEM EXPANSION VESSEL Secondary Circulation The secondary return pipe should be in 15mm pipe and incorporate a check v...

Страница 16: ...mains water supply to the MEGAFLO Eco Solar unit iii No control or safety valves should be tampered with iv Water may drip from the discharge pipe of the pressure relief device Expansion Valve and thi...

Страница 17: ...the safety device between 18 and 27m at least 3 sizes larger and so on bends must be taken into account in calculating the flow resistance See Diagram 1 Table 1 and the worked example Note An alterna...

Страница 18: ...r discharge pipe D2 for common T P Relief Valve sizes Figure 10 Schematic discharge pipe arrangement INSTALLATION AND COMMISSIONING INSTRUCTIONS 2 Discharge Pipework It is a requirement of Building Re...

Страница 19: ...control thermostat and thermal cut out If in doubt consult the boiler manufacturer Solid fuel boilers or any other boiler in which the energy input is not under effective thermostatic control unless a...

Страница 20: ...see p 21 However other systems may be suitable refer to the controls manufacturers instructions supplied with the controls selected for alternative system wiring schemes Immersion Heater s The MEGAFL...

Страница 21: ...N N L N L Bl W G O GY 1 2 3 L N HTG ON DHW ON PUMP BOILER 3 PORT MID POSITION VALVE MEGAFLO ECO DHW 2 PORT VALVE SUPPLIED WIRING CENTRE SUPPLIED PROGRAMMER MEGAFLO ECO INDIRECT THERMAL CONTROLS SUPPL...

Страница 22: ...tighten the brass backnut Secure the immersion heater in position by tightening with the key spanner provided Replace the thermostat capillaries spiral one in first making sure capillary tubes do not...

Страница 23: ...MPERATURE DECREASE TEMPERATURE ADJUSTING SPINDLE Figure 16 Adjustment details INSTALLATION AND COMMISSIONING INSTRUCTIONS 2 Safety DO NOT BYPASS THE THERMAL CUT OUT S IN ANY CIRCUMSTANCES DISCONNECT F...

Страница 24: ...The solar controller and solar primary circulation pump must be wired via the over temperature cut out mounted in the lower solar controls housing Figure 17 below This will ensure that the heat input...

Страница 25: ...med to give a maximum storage temperature in the MEGAFLO Eco Solar of 70o C although 60o C is recommended to minimise scaling Direct Units Switch on the electrical supply to the immersion heater s and...

Страница 26: ...26 Unvented Hot Water Cylinder NOTES INSTALLATION AND COMMISSIONING INSTRUCTIONS 2...

Страница 27: ...Maintenance Fault Finding Servicing Spares Benchmark Unvented Hot Water Cylinder 27 MAINTENANCE AND SERVICING 3...

Страница 28: ...ar to relieve the system pressure Open drain cock If water fails to drain from the MEGAFLO Eco Solar vent the unit by manually opening the Temperature Pressure Relief Valve Descaling immersion heater...

Страница 29: ...educing Valve If greater than 3 bar replac e P res s ure Reduc er c artridge b E x pans ion V alve s eat dam aged M ilk y water 1 O x y genated water No hot water flow W ater from hot taps is c old W...

Страница 30: ...k 95 605 885 Immersion Heater Backnut 95 607 940 Immersion Heater Gasket 95 611 822 Immersion Heater Key 95 607 861 Immersion Heater Blanking Plug 95 605 881 Titanium Immersion Heater Upper 95 606 989...

Страница 31: ...Stopcock Can Be Used Either with 3 Bar Inlet Control Valve or 8 Bar Pressure Relief Valve 95605885 MAINTENANCE AND SERVICING 3 Expansion Relief Cartridge 95 605 888 8 Bar Pressure Relief Valve Complet...

Страница 32: ...95 612 716 Direct Combined Thermostat and Thermal Cut Out 95 612 717 Incoloy Immersion Heater Lower 95 606 984 6 Way Terminal Block 95 607 933 Terminal cover 95 614 118 Terminal cover 95 614 118 Back...

Страница 33: ...Terminal cover 95 614 119 Titanium Immersion Heater Lower 95 606 988 Three Way Terminal Block 95 607 932 C Titanium Immersion Heater Upper 95 606 989 Direct Combined Thermostat and Thermal Cut Out 95...

Страница 34: ...34 Unvented Hot Water Cylinder MAINTENANCE AND SERVICING 3...

Страница 35: ...Unvented Hot Water Cylinder 35 MAINTENANCE AND SERVICING 3...

Страница 36: ...on Units 9 10 Hexagon Business Centre Springfield Road Hayes Middlesex UB4 0TY Tel 020 8606 3567 Parts Center Tel 0845 270 9800 www partscenter co uk Newey Eyre Unit 3 5 Wassage Way Hampton Lovett Ind...

Страница 37: ...Unvented Hot Water Cylinder 37 User Instructions Guarantee Customer Service USER GUIDE 4...

Страница 38: ...adjustments Changes to the operating temperature differential set points can affect the efficiency of the operation of the solar heating circuit it is recommended that any changes made are carried out...

Страница 39: ...een tampered with or been subjected to misuse or neglect No factory fitted parts have been removed for unauthorised repair or replacement The BenchmarkTM Commissioning Checklist and Service Record inc...

Страница 40: ...lation legal requirements regulations building regulations benchmark spares stockists guarantees and warranty are ONLY APPLICABLE WITHIN THE UK For local legislation legal requirements regulations bui...

Отзывы: