![Heatrae Sadia Megaflo Eco Solar Series Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/heatrae-sadia/megaflo-eco-solar-series/megaflo-eco-solar-series_product-manual_2117689018.webp)
18
Unvented Hot Water Cylinder
Fixed grating
Discharge below
fixed grating
(Building Regulation
G3 section 3.61 gives
alternative points
of discharge)
Trapped
gully
Discharge pipe (D2) from tundish,
with continuous fall. See Building
Regulation G3 section 3.56,
Table 4 and worked example
300mm
minimum
600mm maximum
Metal discharge pipe (D1) from
Temperature relief valve to tundish
Tundish
Safety device
(e.g. Temperature
relief valve)
VALVE OUTLET
SIZE
MINIMUM SIZE OF
DISCHARGE PIPE D1
MINIMUM SIZE OF
DISCHARGE PIPE D2
FROM TUNDISH
MAXIMUM RESISTANCE
ALLOWED, EXPRESSED
AS A LENGTH OF
STRAIGHT PIPE (I.E. NO
ELBOWS OR BENDS
RESISTANCE CREATED BY
EACH ELBOW OR BEND
G 1/2
15mm
22mm
28mm
35mm
UP TO 9m
UP TO 18m
UP TO 27m
0.8m
1.0m
1.4m
G 3/4
22mm
28mm
35mm
42mm
UP TO 9m
UP TO 18m
UP TO 27m
1.0m
1.4m
1.7m
G 1
28mm
35mm
42mm
54mm
UP TO 9m
UP TO 18m
UP TO 27m
1.4m
1.7m
2.3m
Notes:
1) Discharge pipe-work D2 can now be a plastic pipe but only pipes that have been tested to a
minimum110°C must be used.
2) Discharge pipe D2 can now be plumbed in the soil stack but only soil stacks that can handle
temperatures of 99°C or greater should be used.
Table 5 Sizing of copper discharge pipe “D2” for common T&P Relief Valve sizes.
Figure 10 - Schematic discharge pipe arrangement
INST
ALLA
TION AND
COMMISSIONING INSTRUCTIONS (2)
Discharge Pipework
It is a requirement of Building Regulations that any discharge from an unvented system is conveyed to where it is visible, but will not cause danger
to persons in or about the building. The tundish and discharge pipes should be fitted in accordance with the requirements and guidance notes of
Building Regulations. Building Regulation G3 Requirements and Guidance (p. 17) are reproduced in the following sections.
For discharge pipe arrangements not covered by G3 Guidance advice should be sought from your local Building Control Officer. Any discharge pipe
connected to the Pressure Relief devices (Expansion Valve and Temperature and Pressure Relief Valve) must be installed in a continuously downward
direction and in a frost free environment.
The water may drip from the discharge pipe of the pressure relief device and that this pipe must be left open to the atmosphere. The Pressure Relief
device is to be operated regularly to remove lime deposits and to verify that it is not blocked.
G3 Requirement
“...there shall be precautions...to ensure that the hot water discharged from safety devices is safely conveyed to where it is visible but will not cause
danger to persons in or about the building”.
Содержание Megaflo Eco Solar Series
Страница 1: ...Unvented Direct Indirect Solar Megaflo Product Guide Hot Water Cylinders...
Страница 10: ...10 Unvented Hot Water Cylinder NOTES PRODUCT SPECIFICATION 1...
Страница 26: ...26 Unvented Hot Water Cylinder NOTES INSTALLATION AND COMMISSIONING INSTRUCTIONS 2...
Страница 27: ...Maintenance Fault Finding Servicing Spares Benchmark Unvented Hot Water Cylinder 27 MAINTENANCE AND SERVICING 3...
Страница 34: ...34 Unvented Hot Water Cylinder MAINTENANCE AND SERVICING 3...
Страница 35: ...Unvented Hot Water Cylinder 35 MAINTENANCE AND SERVICING 3...
Страница 37: ...Unvented Hot Water Cylinder 37 User Instructions Guarantee Customer Service USER GUIDE 4...