28881 Rev G
4
01-02
NOVUS REAR DIRECT VENT
Tools and building supplies normally required
for installation:
Saw
Wall-finishing materials
Pliers
Framing material
Hammer
Surround
Phillips screwdriver
Caulking material
Tape measure
Gloves
Plumb line
Framing square
Level
Electric drill and bits
Safety glasses
Note:
Minimum and maximum clearances must be
maintained at all times. Illustrations throughout these
instructions reflect typical installations and are for design
purposes only. Actual installation may vary slightly due
to individual design preferences.
The illustrations and diagrams used throughout these
installation instructions are not drawn to scale.
Typical Horizontal Installation
Typical Vertical Installation
All manuals and user guides at all-guides.com