4. Firestop Spacer/Vent Installation
Frame an opening and install a firestop spacer
whenever the vent penetrates a ceiling/floor area, as
shown in Figure 8. Frame the opening with the same
sized lumber as used in the ceiling/floor joists. Unless
the flue is offset, the hole should be directly above the
appliance. DO NOT pack insulation around the vent.
Assemble vent sections as per manufacturers
specifications.
Figure 8 - Installing the Firestop Spacer
3. 90° Elbows
A maximum of four 90° elbows may be used on this
appliance when used in conjunction with the fixed glass
doors shown below. See Figure 7.
Acceptable fixed glass doors are:
DF361B/S
DF421B/S
Figure 7 - 90° Elbows
5. Chase/Termination Installation
Figure 9 and Table 1 specify minimum vent heights for
various pitched roofs. Vent sections may have to be
cut to a certain length.
These vent heights are necessary for safety and do
not ensure draft-free operation. Trees, buildings,
adjoining roof lines, adverse conditions, etc. may create
a need for a taller vent should down drafting occur.
Figure 9 - Vent Height for Vertical Termination
Note:
To ensure proper operation, verify all venting
and the termination are unobstructed.