18
Heatilator • ECLIPSE-32, ECLIPSE-36 Installation Manual • 2297-984 Rev. B • 6/15
H
2
H
1
V
2
V
1
Three Elbows
V
1
Minimum**
H
1
Maximum
H
1
+ H
2
Maximum
90 Elbow Only**
1-1/2 ft. 457 mm
2 ft.
610 mm
1/2 ft.** 152 mm 1-1/2 ft. 457 mm
4 ft.
1.2 m
1-1/2 ft. 457 mm
3 ft.
914 mm
6 ft.
1.8 m
2-1/2 ft. 762 mm
5 ft.
1.5 m
10 ft.
3.0 m
3-1/2 ft.
1.1 m
7 ft.
2.1 m
14 ft.
4.3 m
4-1/2 ft.
1.4 m
14 ft.
4.3 m
14 ft.
4.3 m
H
1
+ H
2
MAX. =14 ft. (4.3 m)
V
1
+ V
2
+ H
1
+ H
2
MAX. = 40 ft. (12.2 m)
** See Warning Below.
Note
: There MUST be a 25% reduction
in total H when using
fl
ex vent except
when using the simple up and out
installation (see Figure 4.6).
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-
SS termination caps on top vented
fi
replaces,
a one foot minimum vertical vent section is
required before installing
fi
rst elbow.
WARNING**
Top Vent - Horizontal Termination
- (continued)
Figure 4.10
Note: Use SLP Series
components only.