![Heat Wagon VG1000 Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/heat-wagon/vg1000/vg1000_installation-and-maintenance-manual_2116014006.webp)
FUEL SUPPLY (CONTINUED)
• Ensure that for the surrounding temperature, size and capacity of the propane supply cylinder
is adequate to provide the rated Btu/hr input to the heater.
• Visually inspect the hose assembly and ensure that it is protected from traffic, building
materials, and contact with hot surfaces. If it is evident that there is excessive abrasion or wear,
or the hose is cut, replace it immediately.
• Purge air from line and wait 10 minutes for gas to dissipate.
• After installation, check the hose assembly for gas leaks by applying a water and soap solution
to each connection.
• Fuel hose must be UL approved.
• The installation of this heater to a natural gas supply must confirm with all applicable local
codes or, in the absence of local codes, with the
National Fuel Gas Code ANSI Z223.1/NFPA 54.
For vapor propane, refer to standard for
Storage and Handling of Liquified Petroleum Gases
ANSI/NFPA 58.
ELECTRICAL
• Electric cable extensions must be connected by qualified authorized electricians based on the
unit capacity and cable length.
• Connect unit to a power supply with a suitable appliance receptacle (30 Amp). Green
indicator lamp will light up.
• Confirm voltage at heater connection (208V min.) to ensure proper operation.
EXHAUST FLUE PIPE
• The unit is to be connected to a flue pipe with adequate draft, to ensure the proper start and
operation of the unit. Refer to page 27.
• The flue pipe is to be made of non-combustible material and clearances from combustible
materials must be a minimum 8 inches (temperature of flue gases is approximately 410º F).
• The flue pipe and its installation must comply with the regulations and instructions given by
the local authorities.
START UP
• Only people trained in the operation and supervision of this heater should operate
and maintain the unit.
• Check the unit to make certain that there are no visible defects on the control and safety
devices and that the unit has been installed correctly.
1. Open door at back of unit (control box compartment).
2. Check that the control switch in the control box is in position “0” (STOP).
3. Pre-select desired room temperature on the room thermostat. The temperature must be set
higher than the ambient temperature.
4. Open all possible shut-off devices of the fuel supply lines and push the reset on the low
pressure gas switch (Wayne Burner Only).
6
Содержание VG1000
Страница 18: ...WAYNE BURNER PARTS BREAKDOWN 18 ...
Страница 20: ...20 WAYNE BURNER SERVICING ELECTRODE SETTING ...
Страница 21: ...21 WAYNE BURNER SERVICING ...
Страница 23: ...23 MIDCO BURNER VG1000 ...
Страница 24: ...24 WAYNE BURNER Serial No M5659 Lower WAYNE BURNER Serial No M5895 Beyond ...
Страница 25: ...MIDCO BURNER VG1000 25 ...
Страница 26: ...26 CONTROL BOX MAIN CIRCUIT DIAGRAM CONTROL BOX WIRING DIAGRAM ...
Страница 27: ...27 CONTROL BOX WIRING ...
Страница 28: ...28 CONTROL BOX PARTS HWP210080 20 HWP 22211 Aux Contact 20 HWP 20582 ...