11
BKP
TM
and BKP-AC
TM
SERIES TROUBLESHOOTING CHECK LIST
Company: ________________________________
Phone: (____) ________ Fax: (____) __________
Job Name: ________________________________
Model # : __________ Serial # : ______________
Test performed by: ______________ Date: ______
Test Dehumidification
Air
Conditioning
Air
Return Air Flow
CFM
CFM
Return Air Temperature
°F DB °F WB
°F DB °F WB
Return Air Static Pressure (Negative)
in. WG
Return Duct Size
" Depth " Width
Supply Air Temperatures
°F DB °F WB
°F DB °F WB
Supply Duct Air Pressure (Positive)
In. WG
Supply Duct Size
" Depth " Width
Condensate after 15 min (see
Note
below)
Refrigeran
t
High Discharge Pressure / Sat. Temperature
psig °F
psig °F
Liquid Line Temperature / Sight Glass
°F SG Clear?
°F SG Clear?
Low Suction Pressure / Saturated Temperature psig °F
psig °F
Suction Line Temperature (@coil outlet)
°F
°F
Suction Superheat
°F
°F
Elec.
Compressor Volts / Amps at outdoor °F
Amps at °F DB Amps at °F DB
Indoor Blower
Lo
Med
Hi Volts/Amps
Volts Amps
BKP
-A
C
Outdoor Fan ________ Volts / Amps
Amps
Outdoor Fan Pressure Switch set at
ON: _______ psig
OFF: _______ psig
Vapor Line Length / Size
ft "OD
Liquid Line Length / Size
ft "OD
Note
: To perform condensate flow test, run the unit for 15 minutes, then capture condensate for 5
minutes in a graduated container. Air side conditions must be measured during this time.
Is condensate TRAP properly installed?
Yes.
No.
Remote Condenser
Return
Air
Supply
Air
BKP
Содержание BKP 250
Страница 12: ...12 BKP 250 350 450 and AC Wiring Schematic ...
Страница 13: ...13 BKP 250 350 450 Wiring Diagram ...
Страница 14: ...14 BKP 250AC 350AC 450AC Wiring Diagram ...
Страница 15: ...15 BKP 250AC 350AC 450AC With Cooling Priority Wiring Schematic ...
Страница 16: ...16 BKP 250AC 350AC 450AC With Cooling Priority Wiring Diagram ...
Страница 17: ...17 BKP 250AC 350AC 450AC Remote Condenser Wiring Diagram ...