background image

10

Appliance Certification

The Heat-N-Glo fireplace models discussed in this 

Installers

Guide

 have been tested to certification standards and listed

by the applicable laboratories.

Certification

MODELS:

    7000TR, 6000TRB, 6000SEB

LABORATORY:   

 Underwriters Laboratories

TYPE:    

Direct Vent Gas Fireplace

STANDARD: 

   ANSI Z21.50•CGA2.22/IR#41

Installation Codes

The fireplace installation must conform to local codes. Before

installing the fireplace, consult the local building code

agency to ensure that you are in compliance with all

applicable codes, including permits and inspections.
In the absence of local codes, the fireplace installation must

conform to the  National Fuel Gas Code ANSI Z223.1 (in

the United States) or the CAN/CGA-B149 Installation Codes

(in Canada). The appliance must be electrically grounded

in accordance with local codes or, in the absence of local

codes with the National Electric Code ANSI/NFPA No. 70

(in the United States), or to the  CSA C22.1 Canadian Electric

Code (in Canada).
These models may be installed in a bedroom or bed-sitting

room in the U.S.A. and Canada.

1

Approvals and

Codes

High Altitude Installations

U.L. Listed gas fireplaces are tested and approved for

elevations from 0 to 2,000 feet in the U.S.A. and from 0 to

4,500 feet in Canada.
When installing this fireplace at an elevation above 2,000

feet (in the United States), it may be necessary to decrease

the input rating by changing the existing burner orifice to a

smaller size. Input should be reduced four percent (4%) for

each 1,000 feet above sea level, unless the heating value of

the gas has been reduced, in which case this general rule

will not apply. To identify the proper orifice size, check with

the local gas utility.
When installing this fireplace at an elevation between 2,000

and 4,500 feet (in Canada), the input rating must be reduced

by ten percent (10%).
When installing this fireplace at an elevation above 4,500

feet (in Canada), check with local authorities.
Consult your local gas utility for assistance in determining

the proper orifice for your location.

Heat-N-Glo Quality

Systems registered

by SGS ICS

Содержание 6000SEB

Страница 1: ...ERENCE 1 This appliance may be installed in an af termarket permanentlylocated manufac tured mobile home wherenotprohibited by local codes 2 Thisapplianceisonlyfor usewiththetype of gas indicated on t...

Страница 2: ...he installation FAILURE TO FOLLOW these installation instructions may result in a possible fire hazard and will void the warranty Prior to the first firing of the fireplace READ the Using Your Firepla...

Страница 3: ...nt System 16 A Vent System Approvals 16 B Installing Vent Components 22 C Vent Termination 26 Step 4 Positioning Leveling and Securing the Fireplace 29 Step 5 The Gas Control Systems 29 Step 6 The Gas...

Страница 4: ...e CSAC22 1 Canadian Electric Code in Canada These models may be installed in a bedroom or bed sitting room in the U S A and Canada 1Approvals and Codes High Altitude Installations U L Listed gas firep...

Страница 5: ...in place Remove the two screws holding the pilot assembly to the burner 7 Remove the burner assembly from the firebox 8 Replace the burner orifice with the orifice included in the plastic manual bag B...

Страница 6: ...installed The vent system configuration to be used Gas supply piping Electrical wiring Framing and finishing details Whether optional accessories devices such as a fan wall switch or remote control ar...

Страница 7: ...he fireplace is one inch 25 mm The back of the fireplace may be recessed 21 1 2 inches 546 mm into combustible construction Minimum Clearances from the Vent Pipe to Combustible Materials Inches mm Ver...

Страница 8: ...ng material The dia gram below shows framing reference dimensions CAUTION MEASURE FIREPLACE DIMENSIONS AND VERIFY FRAMING METHODS AND WALL COVERING DETAILS BEFORE FRAMING 1 2 CLEARANCE FROM BACK OF FI...

Страница 9: ...T EACH JOINT DV 36D 5 3 4 146mm 8 3 4 222mm 11 3 4 298mm DV 48D 7 3 8 187mm 6 5 32 156mm 11 5 8 295mm 8 5 8 220mm 8 1 2 216mm 6 7 16 164mm 11 1 16 281mm 6 1 2 165mm 8 1 2 216mm 5 1 16 129mm 8 5 8 220m...

Страница 10: ...onfiguration used Terminations Kits Identifying Vent Components The vent systems installed on this gas fireplace may in clude one two or three 90 elbow assemblies The rela tionships of vertical rise t...

Страница 11: ...ing NOTE On vertical venting configurations where the vertical component is over 10 feet you may want to install the vertical baffle included in the manual bag assembly to improve flame appearance see...

Страница 12: ...Venting with One 90 Elbow VENTING WITH ONE 1 90 ELBOW VENTING WITH ONE 1 90 ELBOW V FT H FT 1 MIN 305mm 5 MAX 1 52m 2 MIN 610mm 10 MAX 3 1m 3 MIN 914mm 15 MAX 4 65m 4 MIN 1 22m 20 MAX 6 2m V H 40 MAX...

Страница 13: ...914 mm 6 MAX 1 86 m 15 MAX 4 65m 4 MIN 1 22 m 8 MAX 2 48 m 20 MAX 6 2m V H H1 40 MAX 12 4 m H 8 MAX 2 48 m H H1 20 MAX 6 2m Figure 12 Venting with Two 90 Elbows VENTING WITH TWO 2 90o ELBOWS V FT H H...

Страница 14: ...914mm 6 MAX 1 86m 15 MAX 4 65m 4 MIN 1 22m 8 MAX 2 48m 20 MAX 6 2m V H H1 H2 40 MAX 12 4 m H 8 MAX 2 48 m H H1 H2 20 MAX 6 2 m V H H H1 H2 1 MIN 305mm 2 MAX 610mm 5 MAX 1 52m 2 MIN 610mm 4 MAX 1 22m...

Страница 15: ...m 3 MIN 914mm 15 MAX 4 65m 4 MIN 1 22m 20 MAX 6 2m NOTE H H1 20 MAX 6 2m V V1 H H1 40 MAX 12 4m V FT H H1 FT 1 MIN 305mm 5 MAX 1 52m 2 MIN 610mm 10 MAX 3 1m 3 MIN 914mm 15 MAX 4 65m 4 MIN 1 22m 20 MAX...

Страница 16: ...inch 127mm fireplace starting collar Make sure that the fiberglass rope gasket supplied with the fireplace seals between the first 8 5 8 inch 219mm vent component and the outer fireplace wrap Lock the...

Страница 17: ...und the preceding component s vertical axis If an el bow does not end up in a locked position with the pre ceding component attach with a minimum of two 2 sheet metal screws Figure 18 CORRECT INCORREC...

Страница 18: ...ops for horizontal runs that pass through either interior or exterior walls Cut a 12 inch by 12 inch 305mm X 305mm hole through the wall NOTE The center of the hole is one 1 inch 25 4mm above the cent...

Страница 19: ...11 inch 280mm X 280mm hole through the ceiling using the centerpoint previously marked Frame the hole with framing lumber the same size as the ceiling joists Figure 24 Ceiling Firestop Ceiling Side If...

Страница 20: ...of the wall firestop to secure the vent pipe in place For trapezoidal cap termination kits Using screws secure the cap to the exterior wall through the flanges in the cap Figure 26 Round Trapezoid Ter...

Страница 21: ...oor that may be opened C 9 U S A 12 Canada clearance to permanently closed window D 18 vertical clearance to ventilated soffit located above the termi nal within a horizontal distance of 2 feet 60 cm...

Страница 22: ...FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS PROVIDED THE TERMI NATION CAP IS AT LEAST TWO 2 FEET FROM A VERTICALWALLAND 2 FEET BELOWA HORIZON TAL OVERHANG NOTE This also pertains to vertical vent systems i...

Страница 23: ...n DSI Standing Pilot Ignition System This system includes millivolt control valve standing pilot thermopile thermocouple flame sensor and piezo ignitor WARNING 110 120 VAC MUST NEVER BE CONNECTED TO A...

Страница 24: ...vent cold air infiltration Open the fireplace lower grille insert the gas supply line throughthegaslinehole andconnectittotheshut offvalve When attaching the pipe support the control so that the lines...

Страница 25: ...itch in the desired position on a wall Run a maximum of 25 feet 7 8 m or less length of 18 A W G minimum wire and connect it to the fireplace ON OFF switch pigtails WARNING DO NOT CONNECT 110 120 VAC...

Страница 26: ...8 m or less of 16A W G minimum wire and connect it to the fireplace ON OFF switch pigtails CAUTION LABEL ALL WIRES PRIOR TO DISCONNEC TION WHEN SERVICING CONTROLS WIRING ERRORS CANCAUSEIMPROPERANDDAN...

Страница 27: ...N IF JOINTS BETWEEN THE FINISHED WALLS AND THE FIREPLACE SURROUND TOP AND SIDES ARE SEALED A 300 F MINIMUM SEALANT MATE RIAL MUST BE USED THESE JOINTS ARE NOT RE QUIRED TO BE SEALED ONLY NON COMBUSTIB...

Страница 28: ...slightly to avoid excessive flame impingement Step 10 Installing Trim Logs and Ember Material Placing the Ember Material Ember material is shipped with this gas fireplace The bag labeled Golden Ember...

Страница 29: ...ll help to cure the chemicals used in the paint and logs Step 12 Lighting the Fireplace You ve reviewed all safety warnings you ve checked the fireplace for gas leaks you know the vent system is unobs...

Страница 30: ...Qualified service technician Task Brush or vacuum the control compartment fireplace logs and burner areas surrounding the logs Checking Flame Patterns Flame Height Frequency Periodically By Qualified...

Отзывы: