Heat & Glo • TIARAI-BK-IPI, TIARAI-BR-IPI, TIARAI-CES-IPI Installation Manual • 2342-980_R8 • 11/14
3
Installation Standard work Checklist
Customer:
Lot/Address:
Model (circle one): TIARAI-BK-IPI TIARAI-BK-IPIL
TIARAI-BR-IPI TIARAI-BR-IPIL
TIARAI-CES-IPI TIARAI-CES-IPIL
Date Installed:
Location of Stove:
Installer:
Dealer/Distributor Phone #
Serial #:
Comments:
Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective
action needed _____________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Comments Communicated to party responsible ____________________ by ______________________on ___________
(Builder / Gen. Contractor/) (Installer) (Date)
Appliance Install
YES
IF NO, WHY?
Veri
ed combustible or non-combustible clearances to walls. (Pg. 8)
___________________________
Stove is installed level. (Pg. 35)
___________________________
Venting/Chimney Section 7 (Pg 36-43)
Venting con
guration complies with allowable vent requirements.
___________________________
Venting installed, locked and secured in place with proper clearance.
___________________________
Interior/Exterior
restops installed and sealed.
___________________________
Attic insulation shield installed.
___________________________
Exterior wall/Roof
ashing installed and sealed.
___________________________
Terminations/Roof
ashing installed and sealed.
___________________________
Electrical Section 8 (Pg 44-47)
Unswitched power (110-120 VAC) provided for the appliance.
___________________________
Switch wires properly installed.
___________________________
Gas Section 9 (Pg 48-49)
Appliance con
guration matches fuel type.
___________________________
Was a conversion performed?
___________________________
Leak check performed and inlet/outlet pressure veri
ed.
___________________________
Set air shutter for optimal
ame appearance.
___________________________
Appliance Setup Section 10 (Pg 50-52)
All packaging and protective materials are from removed inside/under/on
the appliance).
___________________________
Refractories, logs, and embers installed correctly.
___________________________
Glass assembly installed and secured.
___________________________
Accessories installed properly.
___________________________
Mesh, doors, or decorative front properly installed.
___________________________
Manual bag and all of its contents are removed from inside/under
the appliance and given to party responsible for use and operation.
___________________________
Started appliance and veri
ed no
gas leaks exist.
___________________________
2342-982 Rev. B 2/14
= Contains updated information.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your
le.
• That this checklist remain visible at all times on the appliance until the installation is complete.
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this
installation manual.
WARNING! Risk of Fire or Explosion!
Failure to install appliance according to these instructions can
lead to a re or explosion.
ATTENTION INSTALLER:
Follow this Standard Work Checklist