Heat & Glo SLR-X-AU Скачать руководство пользователя страница 1

1

Heat & Glo  •  SLR-X-AU Installation Manual  • 2493-980  Rev B  •  12/17

Models:

Installation Manual

Installation and Appliance Setup

INSTALLER:  Leave this manual with party responsible for use and operation.

OWNER:  Retain this manual for future reference.

NOTICE: DO NOT

 discard this manual!

• 

DO NOT

 store or use gasoline or other flam

-

mable vapors and liquids in the vicinity of this 

or any other appliance.

•  What to do if you smell gas   

DO NOT

 try to light any appliance.

DO NOT

 touch any electrical switch. 

DO 

NOT

 use any phone in your building.

-  Leave the building immediately.
-  Immediately  call  your  gas  supplier  from 

a neighbor’s phone. Follow the gas sup

-

plier’s instructions.

-  If you cannot reach your gas supplier, call 

the fire department.

•  Installation and service must be performed 

by a qualified installer, service agency, or the 

gas supplier.

WARNING: 

FIRE OR EXPLOSION HAZARD

Failure to follow safety warnings exactly 

could result in serious injury, death, or 

property damage. 

DANGER

HOT GLASS 

WILL 

CAUSE BURNS.

DO NOT TOUCH 

GLASS 

UNTIL COOLED.

NEVER 

ALLOW CHILDREN

 TO TOUCH GLASS

.

A  barrier  designed  to  reduce  the  risk  of 

burns from the hot viewing glass is provided 

with this appliance and shall be installed for 

the  protection  of  children  and  other  at-risk 

individuals.

SLR-X-AU

  NOTE:

  NOT INTENDED FOR  

               FIREPLACE INSERT.

Ref No: GMK10477

AS/NZS 5263.1.3.2016

DO NOT PLACE ARTICLES ON OR AGAINST THIS APPLIANCE.
DO NOT USE OR STORE FLAMMABLE MATERIALS NEAR THIS APPLIANCE. 
DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT IS IN OPERATION.  
DO NOT MODIFY THIS APPLIANCE.

Содержание SLR-X-AU

Страница 1: ... your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier WARNING FIRE OR EXPLOSION HAZARD Failure to follow safety warnings exactly could result in serious injury death or property damage DANGER HOT GLASS WILL CAUSE BURNS DO NOT TOUCH GLASS UNTIL COOLED NEVER ALLOW CHILDREN TO TOUCH GLASS A barrier designed t...

Страница 2: ...15 D Use of Elbows 15 E Measuring Standards 16 F Vent Diagrams 17 5 Vent Clearances and Framing A Pipe Clearances to Combustibles 27 B Wall Penetration Framing Firestops 27 C Ceiling Firestop Floor Penetration Framing 28 D Install Attic Insulation Shield 28 6 Appliance Preparation A Vent Collar Preparation 29 B Installing the Optional Heat Zone 240V Kit 29 C Securing and Leveling the Appliance 30 ...

Страница 3: ..._______ Gas Section 9 Pg 40 42 Proper appliance for fuel type ___________________________ Was a conversion performed ___________________________ Leak check performed and inlet pressure verified ___________________________ Verified proper air shutter setting for installation type ___________________________ Finishing Section 10 Pg 43 49 Combustible materials not installed in non combustible areas ___...

Страница 4: ...upply piping system during any pressure testing of the system at test pressures in excess of 3 4 kPa If the fireplace must be isolated from the gas supply pip ing system by closing an individual shut off valve it must be of the handle less type The allowable Outlet Manifold Gas Pressure ranges are Natural Gas 80 95 kPa and ULPG 2 37 2 61 kPa MODEL SLR X AU LABORATORY IAMPO OCEANA TYPE Direct Vent ...

Страница 5: ...ting entirely of steel iron brick tile concrete slate glass or plasters or any combination thereof Materials that are reported as passing ASTM E 136 Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 ºC 1382 F shall be con sidered non combustible materials F Combustible Materials Specification Materials made of or surfaced with wood compressed pa per plant fibers plas...

Страница 6: ...3 19 mm length 6 or 8 Self drilling screws Caulking material 300 ºF 149 ºC minimum continuous exposure rating Improper installation adjustment alteration service or maintenance can cause injury or property damage For assistance or additional information consult a qualified service technician service agency or your dealer B Good Faith Wall Surface TV Guidelines Installation and service of this appl...

Страница 7: ...ould impair safe operation DO NOT install damaged in complete or substitute components Keep appliance dry Hearth Home Technologies disclaims any responsibility for and the warranty will be voided by the following actions Installation and use of any damaged appliance or vent system component Modification of the appliance or vent system Installation other than as instructed by Hearth Home Technologi...

Страница 8: ...ensions Table O GAS LINE ACCESS ELECTRICAL ACCESS Q LEFT VIEW P C S FRONT VIEW A B T D E G RIGHT VIEW F H I J K N Ø M R L U Ø HEAT ZONE 240V ACCESS V W TOP VIEW X Location Inches Millimeters M 16 3 4 425 N 6 5 8 168 O 32 3 8 822 P 2 3 16 56 Q 6 152 R 17 1 4 438 S 25 7 8 657 T 50 1 2 1283 U 5 127 V 14 356 W 10 5 8 270 X 7 3 4 197 Location Inches Millimeters A 48 1219 B 43 1092 C 39 1 16 992 D 15 1 ...

Страница 9: ...CFT DECORATIVE FRONTS A B C D E F G SLR X AU CFT 42 in 40 3 16 14 1 8 45 1 8 6 7 8 9 13 16 20 26 7 8 mm 1021 359 1146 175 249 508 683 D G E C B A F Dimensions are actual decorative front dimensions Use for reference only Figure 3 2 Decorative Front Dimensions CFT ...

Страница 10: ...drawn to scale Actual installation could vary due to individual design preference It is important to follow the framing and finishing instruc tions step by step to ensure proper placement of fireplace in the surrounding framing finishing materials 1 2 IN A E A C TOP VENT ONE 900 ELBOW ALCOVE INSTALLATION D TOP VENT ONE 90 ELBOW B F Refer to Section 10 C for mantel and wall projection information C...

Страница 11: ...ce is designed to be recessed into combus tible framing with non combustible material pre installed on top and side Drywall or combustible materials mini mum 1 2 in 13 mm thick are designed to contact the non combustible material appliance as called out in Sec tion 10 Finishing This appliance has been thoroughly tested to minimize drywall cracking and or the protrusion of screws screw pops when fr...

Страница 12: ...er prevent drafts and air leakage the wall shield and ceiling firestops should be caulked with caulk with a minimum of 300 ºF 149 ºC continuous exposure rating to seal gaps Gas line holes and other openings should be caulked with caulk with a minimum of 300 ºF 149 ºC continuous exposure rating or stuffed with unfaced insula tion If the appliance is being installed on a cement surface a layer of pl...

Страница 13: ...tance may need to be increased Refer to the installation instructions supplied with the decorative cap cover A B 6 in 152 mm minimum up to 20 in 508 mm 18 in 457 mm minimum 20 in 508 mm and over 0 in minimum In a staggered installation with both gas and wood or fuel oil terminations the wood or fuel oil termination cap must be higher than the gas termination cap H MIN MINIMUM HEIGHT FROM ROOF TO L...

Страница 14: ...T a Below eaves balconies or other projections MIN CLEARANCE in mm Appliances up to 50 MJ h input 12 300 Appliances over 50 MJ h input 20 1 2 500 b From the ground or above a balcony 12 300 c From a return wall or external corner 20 1 2 500 d From a gas meter M 39 1000 e From an electricity meter or fuse box P 20 1 2 500 f From a drain or soil pipe 6 150 g Horizontally from any building structure ...

Страница 15: ...ontal Offset for SLP Elbows Vent Type X Y Inches Millimeters Inches Millimeters SLP 5 127 11 3 4 298 SLP Pipe Effective Length Rise Run Inches Millimeters Inches Millimeters SLP4 4 102 2 3 4 70 SLP6 6 152 4 1 4 108 SLP12 12 305 8 1 2 216 SLP24 24 610 17 432 SLP36 36 914 25 1 2 648 SLP48 48 1219 34 864 SLP6A 3 to 6 76 to 152 2 1 8 4 1 4 54 108 SLP12A 3 to 12 76 to 305 2 1 8 8 1 2 54 216 C Approved ...

Страница 16: ...tion 12 A Figure 12 1 for information on effective length of pipe components Horizontal terminations are measured to the outside mounting surface flange of termination cap see Figure 4 6 Vertical terminations are measured to top of last section of pipe See Figure 4 7 Horizontal pipe installed level with no rise MEASURE TO SHADED SURFACE OUTSIDE MOUNTING SURFACE Figure 4 6 Measure to Outside Mounti...

Страница 17: ...e replaced with two back to back 45º elbows When penetrating a combustible wall a wall shield firestop must be installed When penetrating a combustible ceiling a ceiling firestop must be installed Horizontal runs of vent do not require vertical rise horizontal runs may be level Horizontal termination cap should have a 1 4 in 6 mm downward slant to allow any moisture in cap to be released See Figur...

Страница 18: ...ermination Figure 4 9 Note Use SLP Series components only One 90º Elbow H1 V1 V Minimum H1 Maximum SLR X AU 90 Elbow Not Allowed 1 ft 305 mm 1 1 2 ft 457 mm 2 ft 610 mm 3 ft 914 mm 3 ft 914 mm 5 ft 1 5 m 4 ft 1 2 m 7 ft 2 1 m 5 ft 1 5 14 ft 4 3 m H MAX 14 ft 4 3 m V H MAX 40 ft 12 2 m ...

Страница 19: ... Two Elbows Figure 4 10 Note Use SLP Series components only INSTALLED HORIZONTALLY H1 H2 V1 V Minimum H1 Maximum SLR X AU 90 Elbow Not Allowed 1 ft 305 mm 1 ft 305 mm 2 ft 610 mm 2 ft 610 mm 3 ft 914 mm 4 ft 1 2 m 4 ft 1 2 m 6 ft 1 8 m 5 ft 1 5 15 ft 4 6 m H1 H2 MAX 15 ft 4 6 m V1 H1 H2 MAX 40 ft 12 2 m ...

Страница 20: ... continued Three Elbows Note Use SLP Series components only SLR X AU V1 Minimum H1 H2 Maximum V2 V1 V2 Minimum 1 ft 305 mm 10 ft 3 0 m 2 ft 610 mm 12 ft 3 7 m 3 ft 914 mm 14 ft 4 3 m H1 H2 MAX 14 ft 4 3 m V1 V2 H1 H2 MAX 40 ft 12 2 m No specific restrictions on this value EXCEPT V1 V2 H1 H2 cannot exceed 40 ft 12 2 m ...

Страница 21: ... INSTALLED HORIZONTALLY V Minimum H1 H2 H3 MAXIMUM SLR X AU NG ONLY 4 ft 1 2 m 15 ft 4 6 m H1 H2 H3 MAX 15 ft 4 6 m V1 MAX 7 ft 2 1 m Top Vent Horizontal Termination continued Risk of Fire This vent configuration can ONLY be used for SLR X AU Natural Gas appliances WARNING Figure 4 12 Three Elbows ...

Страница 22: ...Rev B 12 17 Top Vent Vertical Termination No Elbow V1 60 ft Max 18 3 m Note Use SLP Series components only Note If installing a vertical vent termination off the top of the appliance the optional vertical termination baffle may be needed V1 Figure 4 13 ...

Страница 23: ...tor can be located in the appliance manual bag 1 Remove inner heat shield by removing two wing nuts from top front of heat shield and two screws that se cure the heat shield to back wall of fireplace Retain heat shield and fasteners 2 Center the exhaust restrictor in the open end of the exhaust outlet and secure through the slots on the exhaust restrictor with the two 1 4 in 6 mm self tap ping scr...

Страница 24: ...Vent Vertical Termination continued H1 V1 V2 SLR X AU V1 Minimum H Maximum V2 V1 V2 Minimum 1 ft 305 mm 2 ft 610 mm 2 ft 610 mm 3 ft 914 mm 3 ft 914 mm 5 ft 1 5 m 4 ft 1 2 m 7 ft 2 1 m 5 ft 1 5 m 15 ft 4 6 m H MAX 15 ft 4 6 m V1 V2 H MAX 40 ft 12 2 m No specific restrictions on this value EXCEPT V1 V2 H cannot exceed 40 ft 12 2 m ...

Страница 25: ...ALLY H1 H2 V1 V2 Note Use SLP Series components only SLR X AU V1 Minimum H1 H2 Maximum V2 V1 V2 Minimum 1 ft 305 mm 1 ft 305 mm 2 ft 610 mm 2 ft 610 mm 3 ft 914 mm 4 ft 1 2 m 4 ft 1 2 m 6 ft 1 8 m 5 ft 1 5 m 14 ft 4 3 m H MAX 14 ft 4 3 m V1 V2 H1 H2 MAX 40 ft 12 2 m No specific restrictions on this value EXCEPT V1 V2 H1 H2 cannot exceed 40 ft 12 2 m ...

Страница 26: ... V1 H1 V2 V3 H2 Note Use SLP Series components only SLR X AU V1 MIN H1 MAX V2 MIN H2 MAX V3 MIN 2 1 2 ft 762 mm 4 ft 1 2 m 4 ft 1 2 m 4 ft 1 2 m 3 1 2 ft 1 0 m V1 V2 V3 H1 H2 Maximum 40 ft 12 2 m Figure 4 17 Four 90º Elbows Top Vent Vertical Termination continued ...

Страница 27: ...shields must be field trimmed If wall thickness is greater than 7 5 8 in a DVP HSM B will be required SLP Pipe Shown 3 in 76 mm top clearance 1 in 25 mm clearance bottom sides Heat Shield Wall Shield Firestop Heat Shield WALL 3 in 76 mm top clearance 1 in 25 mm clearance around vertical sections B Wall Penetration Framing Firestops Combustible Wall Penetration Whenever a combustible wall is penetr...

Страница 28: ... to prevent overheating Figure 5 3 Installing Ceiling Firestop Figure 5 4 Installing the Attic Shield INSTALL ATTIC INSULATION SHIELDS BEFORE OR AFTER INSTALLATION OF VENT SYSTEM CEILING FIRESTOP INSTALLED BELOW CEILING CEILING FIRESTOP INSTALLED ABOVE CEILING ATTIC ABOVE A PIPE SLP A 9 in 229 mm A D Install Attic Insulation Shield WARNING Fire Risk DO NOT allow loose materials or insulation to to...

Страница 29: ...Shipping Position Figure 6 2 Top Heat Shield in Position and Heat Zone 240V Locations B Installing the Optional Heat Zone 240V Kit NOTICE Additional clearance are required for Heat Zone 240V installation Provisions must be made in ad vance to ensure fit within the framing Locate the Heat Zone 240V ports on the left and right sides of the appliance Either one or two Heat Zone 240V Kits may be insta...

Страница 30: ...osition and secure the appliance See Figure 6 4 Nailing tabs are provided to secure the appliance to the framing members Bend out nailing tabs on each side Place the appliance into position Keep nailing tabs flush with the framing Level the appliance from side to side and front to back Shim the appliance as necessary It is acceptable to use wood shims underneath the appliance Secure the appliance ...

Страница 31: ... Remove the lower cover panel by removing two screws located on the lower left and right sides of the appliance opening Retain screws Lift the lower cover panel up and out to remove 3 Locate the manual bag assembly and remove the small package containing the 1 1 2 in 38 mm Phillips screws Note Care should be taken when installing screws into the non combustible board DO NOT overtighten screws Scre...

Страница 32: ...evel exceeding two stories or High Rise Applications All outer pipe joints must be sealed with high temperature silicone 300 ºF 149 ºC minimum continuous exposure rating including the slip section that connects directly to the horizontal termination cap Apply a bead of silicone sealant 300 ºF 149 ºC mini mum continuous exposure rating to the outside of connecting joint after joining sections See F...

Страница 33: ... See Figure 7 4 120º Figure 7 5 Securing Vertical Pipe Sections 120º Figure 7 6 Securing Horizontal Pipe Sections C Secure the Vent Sections Vertical runs originating off the top of the appliance with no offsets must be supported every 8 ft 2 44 m after the maximum allowed 25 ft 7 62 m of unsupported rise Vertical runs originating off the rear of the appliance or after any elbow must be supported ...

Страница 34: ...Disassemble Vent Sections Rotate either section see Figure 7 7 so the seams on both pipe sections are aligned as shown in Figure 7 8 Pull carefully to separate the pieces of pipe Figure 7 8 Align and Disassemble Vent Sections Figure 7 7 Rotate Seams for Disassembly ...

Страница 35: ...of as shown in Figure 7 10 NOTICE Failure to properly caulk the roof flashing and pipe seams could permit entry of water Caulk the gap between the roof flashing and the outside diameter of the pipe Caulk the perimeter of the flashing where it contacts the roof surface See Figure 7 10 Caulk the overlap seam of any exposed pipe sections that are located above the roof line Figure 7 11 insert Bolt in...

Страница 36: ...p 1 1 2 in 38 mm mini mum There are two sections of the heat shield One section is factory attached to the wall shield firestop The other section is factory attached to the cap See Figure 7 13 If the wall thickness does not allow the required 1 1 2 in 38 mm heat shield overlap when installed an extended heat shield must be used If the wall thickness is less than 4 in 102 mm DVP or 4 3 8 in 111 mm ...

Страница 37: ...maintain overlap could cause overheating and fire Vent termination must not be recessed in the wall Siding may be brought to the edge of the cap base Flash and seal as appropriate for siding material at outside edges of cap When installing a horizontal termination cap follow the cap location guidelines as prescribed by current local or national codes and refer to Section 4 of this manual CAUTION R...

Страница 38: ... damaged wire with type 105 ºC rated wire Wire must have high temperature insulation Valve Control Access The valve control cavity is accessible by removing two screws located in the lower right and left corners of the fireplace opening Once finish material has been installed access to the valve control cavity is limited to access through the fire box see Section 9 C Accessories Requirements This ...

Страница 39: ... to the unit OR install 4 AA cell batteries not included into the battery pack before use B Wiring Requirements NOTICE Batteries should only be used as a power source in the event of an emergency power outage Batteries should not be used as a primary long term power source Battery polarity must be correct when installing batteries When using batteries as a power source the 6 volt transformer must ...

Страница 40: ...esting gas line at test pressures above 1 2 psig Close the manual shutoff valve BEFORE pressure testing gas line at test pressures equal to or less than 1 2 psig WARNING REMOVE 2 SCREWS Figure 9 1 Base Pan Removal Gas Pressure Natural Gas Propane Butane Minimum inlet pressure 1 13 kPa 2 75 kPa 2 75 kPa Maximum inlet pressure 3 40 kPa 3 40 kPa 3 40 kPa Manifold pressure 87 kPa 2 40 kPa 2 40 kPa C G...

Страница 41: ...cket Remove the one screw that secures the burner bracket to the valve plate See Figure 9 2 Gently push the pilot assembly backwards to allow for the burner to be removed 3 Remove the screw that secures the burner bracket to the valve plate See Figure 9 2 4 Slide burner assembly to the left to disengage the burner tube from the orifice Remove the burner from the appliance 5 Remove the nine screws ...

Страница 42: ...ight and operate normally WARNING Risk of Fire Explosion or Asphyxiation Check all fittings and connections with a non corrosive commercially available leak check solution DO NOT use open flame Fittings and connections could have loos ened during shipping and handling WARNING Risk of Fire DO NOT change valve settings This valve has been preset at the factory F Air Shutter Setting The Natural Gas S...

Страница 43: ...re proper placement of fireplace into the sur rounding framing finishing materials Wall sheathing materials 10 mm thick are specified in this installation manual to properly align with the factory supplied non combustible material WARNING Risk of Fire DO NOT remove the factory installed non combustible board or cover it with combus tible material such as Drywall gypsum board Plywood Materials that...

Страница 44: ... the non combustible board See Figure 10 2 and Section 6 D 4 When installing drywall around the appliance install a rectangular hole for the fireplace non combustible board in a single sheet of drywall This will minimize the joints that require finishing adjacent to the fireplace opening Ensure that the 1 8 inch 3 mm gap is main tained between the factory installed non combustible board and the su...

Страница 45: ...ith the Inside Fit and Overlap Fit methods It is acceptable to pre drill holes and use self tapped screws in the factory installed non combustible board to attach non combustible backer board for tile marble etc Refer to Figure 10 2 for acceptable screw location and screw length requirements Do not drill or install screws which may penetrate the lower cover panel as this will restrict required acc...

Страница 46: ...the fireplace Figure 10 3 Clearances To Combustibles Mantels Or Other Combustibles Above Appliance Combustible Mantels Non combustible Mantels Figure 10 4 Clearances To Non Combustible Mantels Or Other Non Combustibles Above Appliance 10 mm THICK WALL SHEATHING 12 IN MAX 14 IN 356 mm MIN BOTTOM OF MANTEL TO TOP OF APPLIANCE OPENING COMBUSTIBLE MANTEL 305 mm APPLIANCE OPENING 12 IN MAX 305 mm 10 mm...

Страница 47: ...n Combustible Mantel Leg or Wall Projections Unlimited Wall Length Acceptable on both sides of opening Note Clearance from opening to perpendicular wall MantelLegsOrWallProjectionsExtendingPastTheFace Of The Fireplace Combustible or Non Combustible WALL 3 FT MAX 914 mm 6 IN 152 mm MIN APPLIANCE OPENING Note Clearance from opening to perpendicular wall WALL UNLIMITED 7 IN 178 mm MIN APPLIANCE OPENI...

Страница 48: ...FRONT SHOWN DRYWALL OR EQUIVALENT 10 mm Non Combustible Finish Materials 0 1 in 0 25 mm Thick Overlap Fit Method The CFT is designed to overlap finish materials 0 in to 1 in 0 25 mm thick See Figure 10 8 NOTICE This one inch maximum not only includes the decorative finish materials marble tile slate etc but also the mortar or adhesive used to attach the decorative finish material The non combustib...

Страница 49: ...49 Heat Glo SLR X AU Installation Manual 2493 980 Rev B 12 17 BOTH SIDES BOTH SIDES FACE OF NON COMBUSTIBLE BOARD Figure 10 10 CFT Front Without Outer Door Trim ...

Страница 50: ...igned for positive placement when replacing the glass assembly See Figure 11 1 and Section F 11 Appliance Setup Figure 11 1 Fixed Glass Assembly D Install the Refractory Optional An optional glass refractory kit is available for use with the SLR X AU model Install the glass refractory per instruc tions included with the kit B Remove the Shipping Materials Remove shipping materials from inside or u...

Страница 51: ...to create a small gap between the glass clip and the face of the appliance See Figure 11 1 1 Install the bottom of the glass assembly so that the two tabs on the bottom of the glass latch engage the gap By tilting the top of the glass towards the face of the appliance tension will be applied to the bottom two glass latches Use one hand to support the glass at all times 2 Fasten the two upper glass...

Страница 52: ...with your decorative front G Install Fan Brackets NOTICE These brackets are designed to improve the effeciency of the fan performance by directing discharge air through the CFT decorative front more effiecently 1 Locate the fan brackets that are enclosed in the manual bag assembly Separate into left and right brackets by bending the bracket at the perforation until it breaks and the pieces are sep...

Страница 53: ...2 in 165 mm 9 1 4 in 235 mm SLP45 45 Elbow SLP90 90 Elbow Effective Height Length SLP PIPE SLP HVS Horizontal Pipe Support SLP FS Ceiling Firestop SLP WS Wall Shield Firestop 10 7 8 in 276 mm 8 7 8 in 225 mm 1 1 2 in 38 mm 8 11 16 in 220 mm 8 11 16 in 220 mm 1 1 2 in 38 mm 12 in 305 mm 12 in 305 mm 5 1 2 in 146 mm Effective Height Length Pipe inches mm SLP4 4 102 SLP6 6 152 SLP12 12 305 SLP24 24 6...

Страница 54: ...o be used on a wall 4 in to 7 1 4 in 102 mm to 184 mm thick If wall thickness is less than 4 in 102 mm the existing heat shields must be field trimmed If wall thickness is greater than 7 1 4 in 184 mm a DVP HSM B will be required Heat Shield Term Cap Minimum Effective Length Maximum Effective Length Trap1 3 1 8 in 4 3 4 in 79 mm 121mm Trap2 5 1 4 in 9 1 4 in 133 mm 235 mm 8 in 203 mm 12 in 305 mm ...

Страница 55: ...n 305 mm SLP CCS BK Cathedral Ceiling Support Box Black SLP DCF BK Ceiling Firestop Black SLK SNKD Snorkel Termination Cap SLP TVHW Vertical Termination Cap DVP FBHT Horizontal Termination Cap SL 2DVP Required 13 1 2 in 343 mm 28 1 2 in 724 mm 10 11 16 in 271mm 4 3 4 in 121 mm 4 1 8 in 105 mm 17 7 8 IN 454 mm 7 3 8 IN 187 mm 14 IN 356 mm 12 IN 305 mm SLP TB1 Basement Vent Cap A Vent Components Dia...

Страница 56: ...17 Figure 12 4 SLP series Vent Components 13 in 330 mm 15 in 381 mm 8 1 8 in 206 mm 10 7 8 in 276 mm 10 1 2 in 267 mm 3 87 Effective Length 5 3 4 in to 8 3 8 in 146 mm to 213 mm 5 1 2 in 140 mm 8 3 8 in 213 mm SLP HRC SS SLP HRC ZC SS HORIZONTAL TERMINATION CAP ...

Страница 57: ...es access for installation of the remote control upgrades If finishing material is al ready installed the optional accessories must be installed by removing the base pan burner and valve assembly Use only Hearth Home Technologies approved optional accessories with this appliance WARNING Risk of Fire and Electric Shock Use ONLY Hearth Home Technologies approved optional acces sories with this appli...

Отзывы: