B. Mantel and Wall Projections
WARNING! Risk of Fire!
Comply with all minimum clear-
ances as speci
fi
ed. Framing closer than the minimums list-
ed must be constructed entirely of non-combustible materi-
als (i.e., steel studs, concrete board, etc.).
Combustible Mantel Legs or Wall Projections
Note:
Measurement is taken from top of the
opening, NOT the top of the
fi
replace.
3 FT. MAXIMUM
2-7/8 IN.
MINIMUM
1/2 IN.
MINIMUM
FIREPLACE OPENING
See Dimension B on Appliance Dimension Diagram
Figure 3.1(550/750)
Figure 3.2 (950)
Figure 10.3 Clearances to Mantels or other Combustibles
above Appliance
5 6
7
8 9
10
3
4
5
12
11
10
9
8
7
6
4
12
13
11
32
CEILING
MEASUREMENTS FROM
TOP EDGE OF THE OPENING
See Dimension V on Appliance Dimension Diagram
Figure 3.1 (550/750)
Figure 3.2 (950).
Note
: Clearance from opening
to perpendicular wall.
5-3/8 IN.
MINIMUM
3 IN.
MINIMUM
UNLIMITED
FIREPLACE OPENING
See Dimension B on Appliance Dimension Diagram
Figure 3.1(550/750)
Figure 3.2 (950)
Figure 10.4 Non-Combustible Zone
Models: SL-550TR-E, SL-750TR-E
SL-550TR-IPI-E,
SL-750TR-IPI-E
Note
: Clearance from opening
to perpendicular wall.
1/2 in.
SHEETROCK
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE
BOARD SHIPPED
WITH APPLIANCE
Figure 10.7 Non-Combustible Zone
Models:
SL-950TR-IPI-E
NON-COMBUSTIBLE ZONE
1/2 in.
1/2 in. SHEETROCK
OR COMBUSTIBLE
MATERIAL
3-1/2 in.
Figure 10.6 Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
Figure 10.5 Non-Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)