Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. AC • 3/15
30
Figure 7.10
INSTALLED
HORIZONTALLY
H
1
H
2
V
1
V
2
Top Vent - Vertical Termination
Venting with three 90º elbows
V
1
MIN.
SL-550TR-E
SL-750TR-E
SL-950TR-E
H MAX.
H MAX.
H MAX.
V
2
V
1
+ V
2
MIN.
90 Elbow
1/2 ft.
152 mm
1/2 ft.
152 mm
0 ft.
0 mm
*
*
1/2 ft.
152 mm
1 ft.
305 mm
1 ft.
305 mm
1 ft.
305 mm
*
*
1-1/2 ft. 457 mm
2 ft.
610 mm
2 ft.
610 mm
2 ft.
610 mm
*
*
2-1/2 ft. 762 mm
4 ft.
1.2 m
4 ft.
1.2 m
4 ft.
1.2 m
*
*
3-1/2 ft.
1.1 m
6 ft.
1.8 m
6 ft.
1.8 m
6 ft.
1.8 m
*
*
4-1/2 ft.
1.4 m
14 ft.
4.3 m
14 ft.
4.3 m
14 ft.
4.3 m
*
*
H MAX. =14 ft. (4.6 m)
V
1
+ V
2
+ H
1
+ H
2
MAX. = 40 ft. (12.2 m)
* No speci
fi
c restrictions on this value EXCEPT V
1
+ V
2
+ H
1
+ H
2
cannot exceed 40 ft. (12.2 m)
Note
: There MUST be a 25%
reduction in total H when using
fl
ex vent except when using the
simple up and out installation
(see Figure 7.3).
Note
: Use SLP Series
components only.