D. Active Convection Blower Replacement
WARNING! Risk of Shock!
Label all wires prior to dis-
connection when servicing controls. Wiring errors can
cause improper and dangerous operation. Verify proper
operation after servicing.
WARNING! Risk of Shock!
Replace damaged wire with
type 105° C rated wire. Wire must have high temperature
insulation.
1. Remove any interior enhancement kit(s), such as glass
rock media, granite or porcelain, that have been already
installed in the appliance.
2. Remove pilot shield as shown in Figure 8.8.
Figure 8.8 Removing Pilot Shield
Figure 8.9 Removing Screws from Base Pan.
3. Remove screws from base pan and lift base pan up
and out of appliance. Set aside. See Figure 8.9 and
Figure 8.10.
Figure 8.10 Lifting Base Pan Up and Out.
4. Remove screws from each end of burner assembly.
Pull burner out of appliance. Set aside.
Figure 8.11. Side Burner Screw.
SIDE BURNER SCREW
5. Remove left and right side glass pane frames from
bottom of
fi
rebox. Remove glass pane and gaskets.
Gaskets may have become fragile from heat exposure.
Handle with care. At this point, blower and other
components located under the
fi
rebox are accessible.
Figure 8.12. Glass Pane Frame.
Figure 8.13. Removing Glass Pane Frame.
6. Remove four screws from valve and component tray
that is attached to the very bottom of the
fi
replace.
This entire tray can be slid to the side to provide easier
access to the blower. Removing these screws will
require a longer bit shaft in a cordless drill to reach
down through the
fi
rebox opening. See Figure 8.14.