Heat & Glo • Escape-I35-C, Escape-I30-C • 2201-901 Rev. H • 5/12
26
E. Installing Adaptor and Termination Cap
CAUTION! Risk of Cuts/Abrasions/Flying Debris.
Wear protective gloves and safety glasses during instal-
lation. Sheet metal edges are sharp.
For installation of termination cap see minimum vent
heights for various pitched roofs (see Figure 8.4) .
To install adaptor see Figure 8.5.
To prevent odors and cold drafts, the chimney must be
sealed around the vent with non-combustible blanket in-
sulation or fi eld fabricated metal plates.
Roof Pitch H (Min.) Ft.
Flat to 6/12....................1.0*
Over 6/12 to 7/12 ........1.25*
Over 7/12 to 8/12 ..........1.5*
Over 8/12 to 9/12 ..........2.0*
Over 9/12 to 10/12 ........2.5*
Over 10/12 to 11/12 ..... 3.25
Figure 8.4 Minimum Height from Roof to Lowest Discharge
Opening
* 3 foot minimum in snow regions
Roof Pitch H (Min.) Ft.
Over 11/12 to 12/12 ....... 4.0
Over 12/12 to 14/12 ....... 5.0
Over 14/12 to 16/12 ....... 6.0
Over 16/12 to 18/12 ....... 7.0
Over 18/12 to 20/12 ....... 7.5
Over 20/12 to 21/12 ....... 8.0
Figure 8.6
Masonry
Factory Built
Wood Burning
Remove 18 inch x 18 inch fl ashing on cap by removing 3
screws. Connect both the LINK-ZC-ADPB to Class A Pipe
and the termination cap to the LINK-ZC-ADPB with the
self tapping screws provided.
OPTIONAL LINK-ZC-ADPB
FOR USE WITH CLASS A
WOODBURNING PIPE
HORIZONTAL
OVERHANG
VERTICAL
WALL
GAS DIRECT VENT
TERMINATION CAP
12
X
ROOF PITCH
IS X/ 12
LOWEST
DISCHARGE
OPENING
2 FT.
MIN.
20 INCHES MIN.
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
EXHAUST
AIR
VENT PIPE
TERMINATION
CAP
LINK-DV30B
Installation
LINK-DV4-30B
Installation
INLET AIR
VENT PIPE
WARNING:
DO NOT BLOCK
THIS PIPE END!
INLET AIR
VENT PIPE
EXHAUST
AIR
VENT PIPE
Note: Untwist the
pipe while extend-
ing it, to achieve full
30’ length.
OR
To help eliminate cold air drafts, it may be necessary to
place non-combustible insulation around the fl ues as they
go though the damper.
Note
: The LINK-DV4-30B system REQUIRES this insulation.