background image

2" (5,1 cm)

x8

14

Place 

SP

 on flat under 

THA

 for temporary support as shown.

BEGIN

2

3

4

1

BACK WALL PANELS

PARTS REQUIRED:

For squareness maintain 1-3/4" 

measurement along panel edge.

3/8 x 48 x 76"

(1 x 121,9 x 193 cm)

x1

Place 

48" x 76"

 panel on frame with primed side facing up. 

Use 

SP 

on edge to support the panel as shown.

x21

1-1/2" (3,8 cm)

Carefully flip the back wall frame over.

Hold panel flush against top plate 

SZ 

and keep 1-3/4" measurement along middle stud. 

Nail using 1-1/2" and 2" nails spaced 6" apart.

2 x 4 x 48" (5,1 x 10,2 x 122 cm)

SP

x2

Temporary Support

76"

(193 cm)

48"

(121,9 cm)

1-3/4 

(4,4 cm)

1-3/4 

(4,4 cm)

6"

(15,2cm)

SZ

SP 

(on edge)

 

Temporary Support

2" (5,1 cm) 

Nails

SP 

(on flat)

 

Temporary Support

THA

Flush

Primed side UP

1-1/2" (3,8 cm) 

Nails

Содержание ARCHITECTURAL SERIES

Страница 1: ...y or product information call our toll free number 1 800 577 9663 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 6 00 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST ...

Страница 2: ... This page intentionally left blank ...

Страница 3: ... department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 8 CHECK ALL PARTS Inventory...

Страница 4: ...l Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Wood Glue Caulk Gun Hammer Level FINI...

Страница 5: ...2 x 226 1 cm x2 LV 2 x 3 x 22 1 2 5 1 x 7 6 x 57 1 cm x4 QHA 2 x 4 x 59 7 8 5 1 x 10 2 x 152 1 cm x1 3 8 x 2 1 2 x 61 1 x 6 4 x 154 9 cm x1 3 8 x 2 1 2 x 61 1 x 6 4 x 154 9 cm x2 3 8 x 4 3 4 x 61 1 x 12 1 x 154 9 cm x2 3 8 x 4 3 4 x 61 1 x 12 1 x 154 9 cm x2 FDA 19 32 x 2 1 2 x 55 1 8 1 5 x 6 3 x 140 cm 19 32 x 2 1 2 x 63 1 5 x 6 4 x 160 cm x1 WR OO x2 1 1 4 x 2 1 2 x 69 3 2 x 6 3 x 175 3 cm x2 GI...

Страница 6: ...3 4 1 9 cm 2 5 0 cm 3 7 6 cm 2 5 1 cm 1 1 2 3 8 cm x42 1 5 8 4 1 cm 4 x1 T Handle x2 1 1 2 3 8 cm 2 screws in each package x2 Vent x1 56 Metal Threshold 3 4 1 9 cm x18 Bagged seperately special coating WALL PANELS OVERHANG SOFFIT DOORS x6 3 8 x 48 x 76 1 x 121 9 x 193 cm x1 3 8 x 48 x 76 1 x 121 9 x 193 cm x1 3 8 x 48 x 76 1 x 121 9 x 193 cm x2 3 8 x 23 7 8 x 76 1 x 60 6 x 193 cm x1 LEFT DOOR x1 R...

Страница 7: ... 2 x 4 x 8 5 x 10 x 244 cm Treated Lumber Cut to 3 2 x 4 x 93 5 x 10 x 236 cm ea 3 7 6 cm Hot Dipped Galvanized Nails Optional 12 30 5 cm spacing Standard 16 40 7 cm spacing IMPORTANT Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list of additional materials not included 5 FOUNDATION OR FLOOR MAT...

Страница 8: ...en 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements 96 243 8 cm 113 287 cm 8 x 10 235 x 304 8 cm 8 x 10 243 8 x 304 8 cm 120 304 8 cm Treated Sill Plate Caulk between sill plate and concrete 2 x 4 x 8 5 1 x 10 2 x 243 8 cm 2 x 4 x 10 5 1 x 10 2 x 305 cm Requires x2 x2 MUST be treated lumber MUST be ...

Страница 9: ... treated lumber 7 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm x3 x1 x28 x28 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 40 Nails 3 7 6 cm Hot Dipped Galvanized Box Type Nails MATERIAL REQUIRED 4 x 4 x 10 10 2 x 10 2 x 304 8 cm x2 Screws for Frame to 4 x 4 Minimum 3 screws exterior grade DOOR 120 304 8 cm 96 243 8 cm 93 236 2 cm 16 40 6 cm 16 40 6 cm 3 7 6 cm 2 5 1 cm 3 7 6 cm ...

Страница 10: ...crews shown as one option Minimum 24 3 screws exterior grade Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Leveling higher than 16 not recommended LEVELING MATERIALS Gravel 2x4 Treated Lumber Solid Masonry Blocks in 1 2 4 or 8 thickness Asphalt Shingles 4 Block 8 Block Gravel Gravel Do not exceed 16 4x4 Runner Shingle Shingle M...

Страница 11: ... for frame squareness by measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 150 5 16 383 4 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each r...

Страница 12: ...g floor panels Re level if needed The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT IMPORTANT DOOR EAVE WALL EAVE WALL FRONT WALL BACK WALL D O O R ...

Страница 13: ...PVA is 22 1 4 at both ends for squareness BEGIN 1 Secure one PVA flush to the floor deck using two 3 screws Measure over 96 3 4 and install a second PVA flush to the floor deck PWA will overhang the floor Secure using two 3 screws 2 96 3 4 245 7 cm IMPORTANT MEASUREMENT Fig B Fig A It is very important to assemble your rafters using the following method for an even and flat roof You will build a r...

Страница 14: ... this step 4 5 6 3 2 Keep QJA firm against outside PVA s as shown Fig A and push rafters tight to the middle PVA Rafters should touch at tips Fig A Apply glue to rafters where gusset will attach Fig B Place gusset onto QJA holding a 1 4 gap from edge Fig C and keeping rafters firm as instructed Secure gusset using one 1 5 8 screw into each rafter HINT These screws will help hold the measurements w...

Страница 15: ... to THA with one 3 nail as shown Orient parts on floor as shown Fig A Measure and mark Fig A 2 x 4 x 73 1 2 5 1 x 10 2 x 186 7 cm x1 THA x1 SZ 2 x 4 x 89 5 1 x 10 2 x 226 1 cm HINT 89 226 1 cm 44 1 2 113 cm 73 1 2 186 7 cm 44 1 2 113 cm 1 1 2 3 8 cm 3 1 2 8 9 cm 3 1 2 8 9 cm 3 7 6 cm THA SZ FINISH 4 You have finished building your back wall frame SZ THA ...

Страница 16: ...ng up Use SP on edge to support the panel as shown x21 1 1 2 3 8 cm Carefully flip the back wall frame over Hold panel flush against top plate SZ and keep 1 3 4 measurement along middle stud Nail using 1 1 2 and 2 nails spaced 6 apart 2 x 4 x 48 5 1 x 10 2 x 122 cm SP x2 Temporary Support 76 193 cm 48 121 9 cm 1 3 4 4 4 cm 1 3 4 4 4 cm 6 15 2cm SZ SP on edge Temporary Support 2 5 1 cm Nails SP on ...

Страница 17: ... finished installing your back wall panels x21 1 1 2 3 8 cm Hold panel tight to the installed panel and tight against top plate Nail using 1 1 2 and 2 nails spaced 6 apart To draw panels tight angle nail at seam 76 193 cm 48 121 9 cm 6 15 2cm 2 5 1 cm Nails For squareness hold panel tight against left panel and top plate 2 x 4 x 48 5 1 x 10 2 x 122 cm SP x1 Temporary Support Primed side UP SP on e...

Страница 18: ...GIN 2 3 Orient parts on edge on floor Measure and mark Use two 3 nails at each mark Repeat STEPS 1 2 to build the second eave wall frame You have finished building your eave wall frames EAVE SIDE WALL FRAMING 3 7 6 cm FINISH 4 3 7 6 cm Nails x56 TOENAILING IMPORTANT YOU WILL BUILD TWO IDENTICAL EAVE SIDE WALLS 16 2 x 4 x 72 5 1 x 10 2 x 182 9 cm x16 TM 2 x 4 x 48 5 1 x 10 2 x 122 cm SP x4 ...

Страница 19: ... using 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails Fig B For squareness maintain Flush and 3 4 measurement along panel edge BEGIN HERE 6 15...

Страница 20: ...ails 6 apart on edges and 12 apart inside panel Place 48 x 76 panel on frame as shown with primed side facing up flush with 23 7 8 panel Nail using 2 nails 6 apart on edges and 12 apart inside panel Repeat STEPS 1 5 to install second eave side wall panels 4 5 6 You have finished building your eave walls FINISH 7 Flush Flush Flush To draw panels tight at seams angle nail 3 8 x 48 x 76 1 x 121 9 x 1...

Страница 21: ...ch end You have finished your front wall frame 3 19 FRONT WALL FRAME PARTS REQUIRED 3 7 6 cm x8 2 x 4 x 73 1 2 5 1 x 10 2 x 186 7 cm x2 THA x1 SZ 2 x 4 x 89 5 1 x 10 2 x 226 1 cm 89 226 1 cm 56 142 2 cm HINT 4 FINISH 1 1 2 3 8 cm 1 1 2 3 8 cm 2 7 8 7 3 cm 15 3 4 40 cm 15 3 4 40 cm THA THA SZ 2 x 4 x 56 5 1 x 10 2 x 142 2 cm QU x1 Fig A QU QU 3 7 6 cm Nails ...

Страница 22: ...l flush to top of frame with primed side facing up Use QHA to support the panel while nailing 44 1 2 113 cm CENTER Ensure panel is flush along edge of stud Nail using 2 nails spaced 6 apart x1 QHA 2 x 4 x 59 7 8 5 1 x 10 2 x 152 1 cm Temporary Support 6 15 2cm QHA Temporary Support 2 5 1 cm Nails x1 3 8 x 48 x 76 1 x 121 9 x 193 cm LEFT ...

Страница 23: ...ng edge of stud Nail panel using 2 nails spaced 6 apart FINISH 6 You have finished installing your front wall panels x2 Attach OO as a temporary brace as shown using 3 screws one at each side to hold the important 56 door opening Flush Flush Flush 56 142 2 cm OO x1 1 1 4 x 2 1 2 x 69 3 2 x 6 3 x 175 3 cm Temporary Brace 6 15 2cm Temporary Brace OO 2 5 1 cm Nails 3 7 6 cm Screws QHA Temporary Suppo...

Страница 24: ...O R D O O R 22 2 5 1 cm PARTS REQUIRED x20 3 7 6 cm x10 120 304 8 cm 3 Nails into bottom plate 6 15 2 cm Flush OO 1 2 5 cm 3 7 6 cm Screws 3 7 6 cm x2 OO x1 1 1 4 x 2 1 2 x 69 3 2 x 6 3 x 175 3 cm Temporary Brace Angle to nail into floor frame Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig A BEGIN Stand right eave wall on floor Center right eave wall assembly on the 120 304 8 cm floor dimens...

Страница 25: ... nail to hit floor frame Fig B ENSURE GABLE AND EAVE WALL PANELS ARE FLUSH BEFORE SECURING You have finished standing your gable end wall FINISH 4 Nail gable end wall panel to eave wall stud using 1 1 2 nails 6 apart Fig C Secure gable end wall to floor using two 3 nails toe nailed Fig C Secure gable wall top frame 2 x 4 using one 3 screw toe screwed into eave wall frame at an angle as shown Fig D...

Страница 26: ...gable end wall panel to eave wall stud using 1 1 2 nails 6 apart Fig B 3 4 ENSURE GABLE AND EAVE WALL PANELS ARE FLUSH BEFORE SECURING 6 15 2 cm Fig B 1 1 2 3 8 cm Nails Fig C 3 7 6 cm Screw BE SURE TOP OF WALL FRAMES ARE FLUSH 2 7 6 cm Screw 2 5 1 cm Screw 2 Move to the bottom of gable end wall and secure bottom of wall using one 2 screw into eave wall bottom plate Fig A Flush Secure gable end wa...

Страница 27: ...r frame Fig D Secure eave wall bottom plates to floor using 3 nails Fig D 5 Remove temporary brace 6 3 7 6 cm x10 2 5 1 cm x20 LEFT EAVE WALL INSTALLATION 25 D O O R 3 7 6 cm Nails Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig D You have finished standing your left eave wall FINISH 7 6 15 2 cm ...

Страница 28: ...IRED 3 7 6 cm x4 2 5 1 cm x4 26 BEGIN Stand front gable wall on floor It is important to secure the front wall in the following order Fig B 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Fig A 2 5 1 cm Screw Flush Flush Flush Move to the bottom of gable wall and secure bottom of wall using one 2 screw into eave wall bottom plate Fig B ENSURE WALL PANELS ARE FLUSH BEFORE SECURING 2 5 1 cm Screw ...

Страница 29: ...g D Secure gable wall to floor using 3 nails toe nailed Fig E 2 5 1 cm Nails Angle nail to hit floor frame Fig F FINISH 6 4 3 5 3 7 6 cm Screw 3 7 6 cm Screw 1 1 2 3 8 cm Nails Fig E Fig D Secure gable door wall top frame 2 x 4 using 3 screws toe screwed at each corner into top wall frames at an angle as shown in Fig F 3 7 6 cm Nails Nail lower edge of panels to floor using 2 nails 6 apart Angle n...

Страница 30: ...rient parts on flat as shown Place LEFT back gable panel as shown Use temporary support SP on flat side to support panel Secure panel using four 1 1 2 nails Place RIGHT back gable panel as shown Use temporary support SP on flat side to support panel Secure panel using four 1 1 2 nails 2 1 BEGIN 3 You have finished your back gable assembly FINISH 4 Flush SP Temporary Support SP Temporary Support 3 ...

Страница 31: ...ont gable panel as shown Use temporary support SP on flat side to support panel Secure panel using four 1 1 2 nails Place RIGHT front gable panel as shown Use temporary support SP on flat side to support panel Secure panel using four 1 1 2 nails 2 1 BEGIN 3 You have finished your front gable assembly FINISH 4 Flush SP Temporary Support SP Temporary Support To draw panels tight angle nail at seam 3...

Страница 32: ...e ladder unit 59 7 8 152 1 cm 3 1 2 8 9 cm 48 121 9 cm 24 61 cm 3 7 6 cm Screws 3 7 6 cm Screws QHA QHA RCO RCO x4 Arrange measure and mark locations of four RCO as shown place QHA on top Secure using 3 screws as shown Fig A Ensure parts are flush along edges 2 3 1 BEGIN Orient parts as shown Fig A You will build TWO ladder assemblies Fig B Fig B x2 Fig A Flush Flush Flush Flush Flip over gable la...

Страница 33: ...ig E 2 3 Orient gable and ladder assemblies as shown Fig A 3 7 6 cm x4 Fig A Fig B Front Gable Assembly Flush Flush Flush Flush 3 7 6 cm Screws 1 5 8 4 1 cm Screws Attach PVA to ladder assembly using 3 screws Fig B x1 Ladder Unit x2 2 x 4 x 5 7 8 5 1 x 10 2 x 14 9 cm PVA Flush FINISH 4 You have finished building your front gable unit x16 1 5 8 4 1 cm 1 BEGIN Primed side DOWN ...

Страница 34: ...the gable unit in the following order BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING 2 Continue nailing lower edge of panels into top plate using 2 nails 6 apart as shown You have finished attaching your front gable unit FINISH 4 2 5 1 cm x16 TOP PLATE SBA 3 7 6 cm Screws NAIL FIRST 2 5 1 cm NAIL FIRST 2 5 1 cm 6 15 2 cm Fig A TOP PLATE 2 1 8 5 4 cm Measure and Mark 2 1 8 5 4 cm Measure and Mark...

Страница 35: ...cure the gable assembly in the following order BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING 2 Continue nailing lower edge of panels into top plate using 2 nails 6 apart as shown You have finished attaching your back gable assembly FINISH 4 2 5 1 cm TOP PLATE YG 3 7 6 cm Screws NAIL FIRST 2 5 1 cm NAIL FIRST 2 5 1 cm 6 15 2 cm Fig A TOP PLATE 2 1 8 5 4 cm Measure and Mark 2 1 8 5 4 cm Measure a...

Страница 36: ...d at rafter end Fig B and one 3 screw angled from inside up through top plate and into rafter end Fig B Repeat STEPS 1 2 for opposite side of shed to install second LV and PVA FINISH 4 You have finished installing your rafters 1 BEGIN 2 3 24 61 cm 24 61 cm 24 61 cm 24 3 8 61 9 cm 24 3 8 61 9 cm x4 Pre assembled Rafter with 2 gussets x1 Pre assembled Rafter with 1 gusset MEASUREMENTS ARE TO CENTER ...

Страница 37: ...Keep PVA flush to all edges of rafter Fig B Pre drill a 1 8 hole through PVA to avoid splitting Secure with 3 screws Fig B Repeat STEPS 1 2 for opposite side of shed to install second LV and PVA FINISH 4 You have finished installing your eave nailers and rafter spacers 1 BEGIN 2 3 x2 LV 2 x 3 x 22 1 2 5 1 x 7 6 x 57 1 cm LV PRE DRILL Fig A BACK OF SHED 2nd RAFTER 1st RAFTER 22 1 2 57 1 cm x2 2 x 4...

Страница 38: ...fit board Fig B Secure using fourteen 2 finish nails Ensure soffit boards are flush at seam and flush at overhang end Fig A x28 2 5 1 cm 2 1 BEGIN You have finished installing your front gable soffit panels FINISH 3 36 Flush to wall Fig B 12 30 5 cm Primed Side Down Primed Side Down Flush to wall Fig A 12 30 5 cm 2 5 1 cm Finish Nails x14 per side x2 3 8 x 11 7 8 x 58 1 4 1 x 30 2 x 148 cm Hint Pr...

Страница 39: ...1 2 to attach eave side soffit boards on the opposite side Ensure soffit boards are flush at rafter ends Fig B and flush at seams x30 2 5 1 cm 3 1 BEGIN You have finished installing your eave side soffit panels FINISH 4 3 8 x 5 7 8 x 47 7 8 1 x 12 1 x 121 6 cm x2 3 8 x 5 7 8 x 73 5 8 1 x 14 9 x 187 6 cm x2 37 Primed Side Down Fig A DOOR 2 5 1 cm Finish Nails Flush Fig B Flush Flush Flush Fig C 5 7...

Страница 40: ...ush along edge of installed 2 13 16 x 73 7 8 trim board and flush under eave wall soffit Fig B Secure using one 2 finish nail at top as shown Place one 2 13 16 x 73 7 8 trim board flush under gable panel and flush with eave wall panel Fig A Secure using one 2 finish nail at top as shown Repeat STEPS 1 2 to attach trim to all four corners Fig C Complete attaching trim flush to corners using six 2 5...

Страница 41: ...x 5 1 x 30 5 cm x4 NGO 1 x 3 x 11 7 8 2 5 x 7 6 x 30 2 cm x3 2 x 4 x 14 5 1 x 10 2 x 35 6 cm LPA x54 2 5 1 cm x3 PRO 2 x 2 x 10 3 8 5 1 x 5 1 x 26 4 cm Build the left corbel next Orient PKA PRO GCA and FJ as shown Note position of FJ Fig B Nail using 2 finish nails Build the right corbel next Orient PKA PRO GCA and FJ as shown Note position of FJ Fig B Nail using 2 finish nails x2 FJ 1 x 4 x 11 7 ...

Страница 42: ...gainst the bottom of soffit as shown Fig A Fasten from inside using three 3 screws as shown Fig B BEGIN 1 4 Repeat STEPS 1 3 for the right corbel Fasten using two 3 screws down through the soffit as shown Fig C Fig D Fig B Fig D Fig A Fig C 4 4 4 3 3 7 10 3 7 61 cm Screws 3 7 61 cm Screws Centered on trim Flush to soffit INSIDE VIEW ...

Страница 43: ... screws as shown measuring from the top of the gable connector Fig B BEGIN 1 FINISH 4 You have finished installing your corbels Fasten using two 3 screws angled in between the seam of the gable down through the soffit panel into the corbel Fig C Fig D Fig B Fig D Fig A Fig C 5 3 8 12 3 7 61 cm Screws 3 7 61 cm Screws Centered on gable panel seam Flush to soffit Gable Connector INSIDE VIEW FRONT ...

Страница 44: ...anel is flush at the rafter ends Fig C Secure panel with two 2 5 1 cm nails in the corners 2 Attach 48 x 36 roof panel with the rough side up with a 5 8 measurement on the front gable frame Fig D and flush with the installed panel Fig E Ensure the panel is flush at the rafter ends Fig C Secure panel with two 2 5 1 cm nails in the corners Flush at rafter ends Fig C 3 4 1 9 cm Gauge Block Fig A 48 x...

Страница 45: ...panels using 2 nails 6 apart on edges and 12 apart inside panel Fig G 3 4 12 30 5 cm Fig G PARTS REQUIRED 2 5 1 cm x148 7 16 x 11 7 8 x 48 1 1 x 30 2 x 121 9 cm x1 7 16 x 11 7 8 x 84 1 1 x 30 2 x 213 4 cm x1 43 MEASUREMENTS ARE TO CENTER OF RAFTERS Fig F 24 61 cm 24 61 cm 24 61 cm 24 3 8 61 9 cm 24 3 8 61 9 cm Flush at seam 2 5 1 cm Nails From inside of panel From inside of panel 6 15 2 cm ...

Страница 46: ...with a 3 8 measurement at the back gable rafter Fig H Nail the roof panels using 2 nails 6 apart on edges and 12 apart inside panel Repeat STEPS 1 6 to attach roof panels on the opposite side 5 6 7 PARTS REQUIRED FINISH 8 You have finished installing your roof panels 3 8 1 cm 5 8 1 6 cm Gable Frame Gable Frame 11 7 8 x 84 11 7 8 x 48 Flush at seam Flush at seam 7 16 x 11 7 8 x 48 1 1 x 30 2 x 121 ...

Страница 47: ...venly as shown You have finished installing your gable fascia FINISH 2 1 BEGIN 45 x1 3 8 x 4 3 4 x 61 1 x 12 1 x 154 9 cm x1 3 8 x 4 3 4 x 61 1 x 12 1 x 154 9 cm PARTS REQUIRED Primed Side Out Fig A Flush SPACED EVENLY Fig B Flush with top of OSB roof panels Flush at peak 2 5 1 cm Finish Nails x10 per side Hint Pre set nails in fascia before final installation ...

Страница 48: ...nly as shown You have finished installing your gable trim FINISH 2 1 BEGIN 46 x1 3 8 x 2 1 2 x 61 1 x 6 4 x 154 9 cm x1 3 8 x 2 1 2 x 61 1 x 6 4 x 154 9 cm PARTS REQUIRED Primed Side Out Fig A Flush SPACED EVENLY Fig B Flush with top of OSB roof panels Flush at peak 2 5 1 cm Finish Nails x6 per side Hint Pre set nails in trim before final installation ...

Страница 49: ...3 1 2 x 5 7 8 Filler Boards flush to rafter edges as shown Secure each using two 1 screws 47 x1 3 8 x 4 3 4 x 61 1 x 12 1 x 154 9 cm x1 3 8 x 4 3 4 x 61 1 x 12 1 x 154 9 cm PARTS REQUIRED Primed Side Out Fig A Flush SPACED EVENLY Fig B Flush with top of OSB roof panels Flush at peak 2 5 1 cm Finish Nails x10 per side Hint Pre set nails in fascia before final installation x2 3 8 x 3 1 2 x 5 7 8 1 x...

Страница 50: ...e using 2 finish nails into rafter ends and rafter brace LV Repeat STEP 1 on opposite side You have finished installing your eave side fascia FINISH 3 1 BEGIN 48 3 8 x 4 3 4 x 61 1 2 1 x 12 1 x 156 2 cm x2 3 8 x 4 3 4 x 72 1 x 12 1 x 182 9 cm x2 PARTS REQUIRED Primed Side Out Flush at seam 2 5 1 cm Finish Nails Fig A Flush Flush 72 LV LV 61 1 2 Flush with roof panel ...

Страница 51: ... 6 4 x 160 cm x1 WR x3 3 4 1 9 cm x1 JF 1 x 4 x 60 2 5 x 10 2 x 152 4 cm WR OVER DOOR TRIM PARTS REQUIRED x10 2 5 1 cm Center WR tight up against front gable panels Attach using 2 finish nails along bottom edge as shown Ensure nails are into wall framing Secure top edge with three 3 4 screws back screwed from inside 2 5 1 cm Finish Nails x7 3 4 5 1 cm Screws x3 3 8 You have finished installing you...

Страница 52: ... shown Tighten securely Attach temporary support GAA with two 1 1 4 screws as shown Tighten securely HINT Look for 3 8 SPACER attached to doors OO GAA Make sure spacer is attached Tighten screws securely OFFSET 4 3 7 6 cm Screws Screws 1 1 4 3 cm Bottom edges flush NOTE Screw hole will be used later 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm 3 4 1 9 cm 23 1 2 59 7 cm 23 1 2 59 7...

Страница 53: ...studs and floor using 3 screws as shown Make sure screws go into framing and floor Fig C D 6 3 7 6 cm Screws into the wall support and floor frame Fig C SEAM 3 8 1 cm Fig B Fig D Angle 3 7 6 cm Screw Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using two 3 screws Fig A x12 O O Flush under panel Fig A O O 51 Hinge Board Hinge Board Over Door Trim TEMPOR...

Страница 54: ...or Secure vertical door rail FDA with five 3 4 screws from behind to center of doors Fig B Use measurement shown 4 3 Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown Fig B Use two screws at seams PARTS REQUIRED 19 32 x 2 1 2 x 23 1 5 x 6 3 x 58 4 cm GI x2 x58 3 4 1 9 cm 10 1 4 26 cm 10 1 4 26 cm 3 4 1 9 cm Screws from behind Door Trim Hinge Board F...

Страница 55: ...THERSTRIP FINISH 5 On right door center OO vertically in door opening Fig A OO will offset the right door 1 in from the door trim Fig C 3 Secure OO using seven 2 screws through outside trim into OO Fig C 4 OO 2 5 1 cm Screw 1 2 5 cm OFFSET 1 2 5 cm OFFSET Secure OO using seven 2 screws through outside trim into OO Fig B 2 Fig A Fig C Fig B Center OO in door opening Screws 2 5 1 cm x14 11 28 cm App...

Страница 56: ...h 1 2 drill Fig B Keep drilled hole square to trim to avoid breaking edge of 1 1 4 x 2 1 2 door stiffener BEGIN 1 2 Measure and mark location of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit x2 1 1 2 3 8 cm TOP VIEW 1 2 5 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 3 4 4 4 cm 35 3 4 90 cm RIGHT DOOR 1 2 1 3 cm SIDE VIEW Fig B 1...

Страница 57: ...p is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR Fig B PARTS REQUIRED D BOLTS x2 5 16 0 8 cm Drill Bit You have finished installing your D bolts FINISH 5 Fig A FLOOR Loop contacts base x4 1 2 5 16 drill for bolt 1 deep PRE DRILL 4 HOLES 1 2 5 cm x8 1 1 2 x 2 1 2 x 69 1 1 2 x 2 1 2 x 69 OPEN POSITION Spring is loose OO x4 Loop contacts b...

Страница 58: ... at top of wall panel and 1 at bottom of the other wall Cut out marked openings Caulk behind vent flanges You have finished installing your vents Secure using 3 4 1 9 cm screws x2 8 x 16 20 3 x 35 6 cm 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm Caulk 4 10 1 cm Caulk 4 10 1 cm 4 10 1 cm 14 35 6 cm 6 15 2 cm VENTS 1 2 1 2 cm x12 ...

Страница 59: ...llow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 OVERLAP Flush Flush 57 Edge flush to trim Install ...

Страница 60: ...cross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing...

Страница 61: ... 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Страница 62: ...verlap at ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line 5 7 6 9 8 SHINGLES continued If more than 5 to rain slot you must install another row of shingles 5 12 7 cm MAX To...

Страница 63: ...ff pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED FRONT OF SHED Flush 28 to 30 Pieces ...

Страница 64: ...e sure there is 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH 8 Flush to shingles Trim cap off flush to shingles Cap ...

Страница 65: ...and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic latex exterior paint or an acrylic latex so...

Отзывы: