Installing Flue Components

1. Attach the First Flue Component to the

Starting Collars

To attach the first flue component to the starting

collars of the fireplace:
• Apply a 3/8 inch (10mm) bead of stove cement

around  the  inner  pipe  heater  starting  collar.

• Make sure that the heater rope gasket sup-

plied with the heater seals between the first

flue  component  and  the  outer  heater  wrap.

• Lock the flue components into place by sliding

the concentric pipe sections with four (4) equally

spaced interior beads into the heater collar or

previously installed component end with four (4)

equally spaced indented sections.

• When the internal beads of each outer pipe line

up, rotate the pipe section clockwise about one-

quarter (1/4) turn. The flue pipe is now locked

together.

• The first 90° elbow installed in the flue system of

a rear flueing heater 

MUST BE

 in a vertical po-

sition.

Figure 10    Attaching the First Flue

                    Component to the Starting Collars

          WARNING:  A  3/8  INCH  (10MM)

BEAD  OF  STOVE  CEMENT  MUST  BE

PLACED  AROUND  THE  INNER  PIPE

HEATER  STARTING  COLLAR  BEFORE

ATTACHING  THE  FIRST  FLUE

COMPONENT. FAILURE  TO SEAL THIS

JOINT  MAY  CAUSE  THE  HEATER  TO

OPERATE IMPROPERLY. SEE FIGURE 10.

!

!

WARNING:  ENSURE  THAT  THE

FIBER-GLASS  ROPE  GASKET

SUPPLIED  WITH  THE  HEATER

SEALS  BETWEEN  THE  FIRST

FLUE  COMPONENT  AND  THE

OUTER HEATER WRAP.

2.  Continue Adding Flue Components

To continue adding flue components in accordance

with the pre-planned flue system configuration:
• Ensure that each succeeding flue component is

securely fitted and locked into the preceding com-

ponent in the flue system.

90° elbows may be installed and rotated to any point

around the preceding component’s vertical axis. If

an elbow does not end up in a locked position with

the preceding component, attach with a minimum

of two (2) sheet metal screws.

3. Install Support Brackets
For Horizontal Runs - 

The flue system must be

supported every five (5) feet of horizontal run by a

horizontal pipe support.
To install support brackets for horizontal runs:
•    Place the pipe supports around the flue pipe.
•    Nail the pipe supports to the framing members.

STARTING
COLLAR

FIRST
FLUE
COMPONENT

STOVE
SEALANT
BEAD
3/8" (10mm)

1 INCH (25mm)

Содержание HEAT-N-GLO 6000XLT-AU

Страница 1: ...USA 952 985 6000 546 900E 5 01 INSTALLATION AND OPERATION INSTRUCTIONS This product is covered by one or more of the following patents United States 4 112 913 4 408 594 4 422 426 4 424 792 4 520 791...

Страница 2: ...h this Installation Manual Report to your dealer any parts damaged in shipment specifically check glass condition The gas logs and flue system components are in separate pack ages Read all instruction...

Страница 3: ...8 1 7 Log Installation 18 1 8 Installer Testing 21 2 0 OPERATING INSTRUCTIONS 22 2 1 Safety and Lighting Information 23 2 2 Safety Information 24 2 3 Lighting Instructions 25 2 4 Fan Operation 26 3 0...

Страница 4: ...d If the heater is to be installed on carpeting or tile or on any combustible material other than wood flooring the heater should be installed on a metal or wood panel that extends the full width and...

Страница 5: ...Heater Dimensions Locations and Space Requirements 1 1 Locating the Heater The diagram See figure 2 shows space and clearance requirements for locating a heater within a room Minimum Clearances from t...

Страница 6: ...vent termination clearance diagrams on page 7 1 2 Framing the Heater Framing can be built before or after the heater is set in place Framing should be positioned to accommodate wall coverings and hea...

Страница 7: ...ity meter or fuse box areas for flue terminals a Below eaves balconies or other projections MIN CLEARANCE mm Appliances up to 50 MJ h input 300 Appliances over 50 MJ h input 500 b From the ground or a...

Страница 8: ...ns other than depicted con tact your dealer for further information Refer to Figure 4 for required clearances to flue termi nals STRAIGHT OUT HORIZONTAL FLUE SYSTEM Table 2 and Figure 5 show straight...

Страница 9: ...9 Figure 5 VERTICAL VENTING V FT 30 MAX 9 2M...

Страница 10: ...W NOTE IF A 90 ELBOW IS FIRST ATTACHED TO THE UNIT THE MAXIMUM HORIZONTAL RUN H IS 2 1 2 FEET 762MM V FT H FT 1 MIN 305 mm 5 MAX 1 5 m 2 MIN 610 mm 10 MAX 3 1 m 3 MIN 914 mm 15 MAX 4 6 m 4 MIN 1 22 m...

Страница 11: ...N 914 mm 15 MAX 4 6 m 4 MIN 1 22 m 20 MAX 6 1 m 20 MAX 6 2 m 20 MAX 6 1 m VENTING WITH TWO 2 90 ELBOWS V FT H FT 1 MIN 305 mm 5 MAX 1 5 m 2 MIN 610 mm 10 MAX 3 1 m 3 MIN 914 mm 15 MAX 4 6 m 4 MIN 1 22...

Страница 12: ...m 4 MIN 1 22 m 20 MAX 6 1 m 20 MAX 6 1 m NOTE H H1 MAX 20 6 1 m V V1 MAX 30 9 2 m VENTING WITH THREE 3 90 ELBOWS V FT H H1 FT 1 MIN 305 mm 5 MAX 1 5 m 2 MIN 610 mm 10 MAX 3 1 m 3 MIN 914 mm 15 MAX 4...

Страница 13: ...CEMENT MUST BE PLACED AROUND THE INNER PIPE HEATER STARTING COLLAR BEFORE ATTACHING THE FIRST FLUE COMPONENT FAILURE TO SEAL THIS JOINT MAY CAUSE THE HEATER TO OPERATE IMPROPERLY SEE FIGURE 10 WARNIN...

Страница 14: ...enter of the hole is one 1 inch 25mm above the center of the horizontal flue pipe Position the firestops on both sides of the hole previously cut and secure the firestops with nails or screws The heat...

Страница 15: ...hole Figure 16 Attic Firestop C Flue Termination For Horizontal Terminations Toattachandsecure the termination to the last section of horizontal flue Rotate and interlock the ends as described at the...

Страница 16: ...the outline of the roof hole around the cen ter point nail The size of the roof hole framing dimensions depend on the pitch of the roof There MUST BE a 1 inch 25mm clearance from the verti cal flue pi...

Страница 17: ...he wire connector provided inside the junc tion box attach the neutral service wire to the blue wire the hot service wire to the black wire and the service ground wire to the ground screw stud of the...

Страница 18: ...previously removed prior to light ing the unit Be certain the gas logs are properly posi tioned 1 7 LOG INSTALLATION Carefully remove the log package and hood from the heater Handle logs gently Removi...

Страница 19: ...over the second bar LOG 3 SRV446 702 Log 3 is positioned on the right hand side with its back against the tabs and indent over the fourth bar Log Assembly LOG CAMP LOG 1 SRV446 701 Carefully remove t...

Страница 20: ...on the left side of log 1 LOG 5 SRV446 705 Put the forked end of log 5 on the fourth vertical bar and rest it right above the burned section of log 4 LOG 6 SRV446 706 Place log 6 on the grate tab on...

Страница 21: ...and operate as indi cated in the Lighting Instructions Subsequent lightings of the appliance will not require such purging CAUTION DURING THE INITIAL PURGING AND SUBSEQUENT LIGHTINGS NEVER ALLOW THE G...

Страница 22: ...with the pilot light will provide approximately 350 to 500 millivolts This activates the gas control valve See Figure 27 for appliance wiring diagram Additionally a high temperature limit switch is w...

Страница 23: ...D BYTHEGASHEATERMANUFACTURER NOSUB STITUTE MATERIALS MAY BE USED 2 1 SAFETY LIGHTING INFORMATION Follow Section 2 2 SAFETY INFORMATION and 2 3 LIGHTING INSTRUCTIONS to light the appliance By design th...

Страница 24: ...YOU SMELL GAS Do not try to light any appliance Do not touch any electric switch do not use any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplie...

Страница 25: ...hepilotshouldnotrequireaccessingforlighting purposes The pilot is located inside the combustionchamber THERMOPILE PILOTBURNER 6 To put the control in the pilot position turn the control knob counter c...

Страница 26: ...ment logs and burner area surrounding the logs clean by vacuuming or brush ing at least twice a year CAUTION THE LOGS GET VERY HOT HANDLE ONLY WHEN COOL WARNING DO NOT USE ABRASIVE CLEANERS ON THE GLA...

Страница 27: ...the electrode wire up through the grommeted hole in the base pan 3 3 PARTS REPLACEMENT 1 FAN SWITCHES Unplug the fan wires from the junction box wires by pulling the male and female connectors apart...

Страница 28: ...gnitor 1 Using a match light pilot If pi lot lights turn off pilot and trig ger the red button again If pilot lights an improper gas air mix ture caused the bad lighting and a longer purge period is r...

Страница 29: ...he micro switch and connect to terminal TP on the gas valve Turn green knob to pilot position depress and light pilot light If meter reading is greater than 325 m v after 30 seconds the pilot generato...

Страница 30: ...allow for igni tion or the heater continues to shut off disconnect the limit switch wire from the gas valve and repeat the lighting instruc tions If the pilot and burner re main lit after the heater...

Страница 31: ...debris or blockage 1 Adjust the log set so that the flame does not impinge on it 1 Adjust the air shutter at the base of the burner 1 Inspect the opening at the base of the burner It is imperative th...

Страница 32: ...efectiveelectricalormanualcomponents optional componentsoraccessories andglasspanels notincludingglasspanelsbrokenduringmisuseorcareless handling HEAT N GLOshallnotberesponsibleforanylabor transportat...

Отзывы: