
Hearth & Home Technologies • PIER-DV36IN, ST-DV36IN Installation Manual • 2658-980 Rev. C • 4/22
38
CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during instal-
lation. Sheet metal edges are sharp.
NOTICE:
Once appliance is set up for top or rear venting,
it CANNOT be changed at a later time.
A. Vent Collar Preparation
6
6
Appliance Preparation
Top Vent
Figure 6.3
Cut the metal retaining band and fold the sides out.
Figure 6.5
Remove and discard the seal cap, insulation
donut, insulation plug, and the insulation basket. Attach
the first vent section (it will snap into place). Slide the vent
gasket onto the vent section and then, up against the ap
-
pliance. Secure the vent gasket to the appliance with two
self-tapping screws found in the manual bag. Note: The
vent gasket can found in the manual bag.
Proceed to Section 6.B.
Figure 6.2 ST-DV36IN Only:
Fold heat shield back and
secure with screw. Bend heat shield flange to make it
flat. This step is necessary to allow for framing header
clearance.
Figure 6.4
Fold the center parts of the retaining band up
and use to remove the vent cap.
Figure 6.1 ST-DV36IN Only:
Remove screws from top
heat shield.
TOP HEAT SHIELD
TOP HEAT SHIELD
REMOVE SCREWS
REMOVE SCREWS
FOLD HEAT SHIELD BACK
FOLD HEAT SHIELD BACK
SECURE WITH SCREW
SECURE WITH SCREW
HEAT SHIELD FLANGE
HEAT SHIELD FLANGE
BEND FLAT
BEND FLAT