B2.
Unpack the SuperBar hand rail unit (10). Locate the small
Allen key wrench (11). Using this Allen key wrench, unscrew the
bottom countersunk screw (12) as shown in figure B1. Pull out
the white plastic pivot bushing (13) and set it and the screw
aside.
B1
.
See steps A1 and A2 on page 2. Complete these
instructions and then continue with step B2.
B5.
See steps A3, A4, and A5 on page 2. Complete these
instructions and then continue with step B6.
B8.
See steps A6 through A9 on page 2. Complete these
instructions to finish the installation of your SuperPole with
SuperBar.
Alternate Installation Option
Steps B6 and B7 can be completed
the pole
has been raised in place (steps A6, A7, A8) to
better determine optimal height and locking
positions of the SuperBar. You may also install just
one set screw to test a height/angle setting of the
SuperBar.
- Should you need to change the position of
the height/angle setting, we recommend that you
change the height by at least one inch. This will
avoid set screw indentations from being too close to
each other and thereby weakening the pole.
after
Note!
B3.
Slide the SuperBar hand rail unit (10) onto the pole
assembly (2) as shown in figure B2. (side with remaining pivot
bushing to go on first). Slide it on as straight as possible to
avoid scratching the paint on the pole.
B4
.
Unpack and slide the grooved collar (14) onto the pole (2)
as shown in figure B2. Gently slide the collar up the pole to
avoid scratching the pole. Next slide the white plastic pivot
bushing (13) (removed in step B2) up the pole (2) as shown in
figure B2.
IMPORTANT -
the next step is to fix the grooved collar (14) to the
pole (2). The position of the grooved collar is important in two
ways; first, the height at which you fix the grooved collar
determines the height of the SuperBar hand rail unit (10), and
secondly, each of the grooves correspond to a rotational locking
position of the hand rail unit (refer to figure B3). You will want to
fix the grooves to have the hand rail lock in the most
advantageous positions for your assistance as discussed on
page 1 ("Getting Started")
B6
.
Once the grooved collar (14) has been set to its desired
location, fasten the grooved collar to the pole (2) by installing and
tightening the three set screws (15) with the larger Allen key
wrench (16). You will need to slide the spring collar (17) upward
to gain access to the screw holes.
-
MUST
or
injury may result
- by tightening these set screws, the
cone points will penetrate the pole for positive engagement,
thereby leaving permanent indentations in the pole.
IMPORTANT These screws
be tightened until they are flush with the collar
. NOTE
BE
CERTAIN THAT THE COLLAR IS AT THE CORRECT HEIGHT
AND ORIENTATION BEFORE PROCEEDING.
Next, slide the
spring collar(17) downward on the grooved collar(14) as shown
to retain set screws(15) while in service. Inspect frequently to
ensure screws and collar are tight.
B7
. Re-install the white plastic pivot bushing (13) removed in
step B2/figure B1 and secure it with the countersunk screw (12)
using the small Allen wrench (11).
10
13
12
11
Figure B1
Figure B1
2
17
14
15
16
Height of hand rail
Rotational
locking
position
Figure B3
Figure B3
10
13
14
2
Figure B2
Figure B2
Prior to installing the SuperBar option, we strongly recommend
that you first read through these instructions. We would also
recommend that you set aside a space on the floor or a table to
prepare the SuperPole System prior to raising the pole for final
installation.
Installation
Instructions
Models SPB-S, SPB-CXX
- 3 -
spring collar
installed