background image

A3.

Unpack the cover sleeve (4). The cover sleeve has two

end pieces - remove the solid steel socket (5). Next slide the
cover sleeve onto the bottom of the pole (2) as shown in figure
A2, with the remaining grey plastic bushing (6) at the top.

A4.

Remove the rubber O-ring (7) from its bag, and stretch it

to fit onto the bottom of the pole (2), leaving it a few inches up
from the bottom of the pole as shown in figure A2. The cover
sleeve (4) can now slide down to rest on this O-ring while the
pole is being raised.

A5.

Place the circular

base (8) on the floor at
the intended location of
the SuperPole. Place
the steel socket (5) on
top of the base so that it
seats into the central
hole of the circular
base. You are now
ready to raise the
SuperPole assembly.

A6.

Raising the Pole - The SuperPole is most easily raised by

holding the pole up at an angle, inserting the bottom of the
extension screw into the metal socket (5) on the circular base
(8), and then pivoting the pole up above the socket as shown in
figure A4.

to prepare, set the extension screw such that

the distance from the top of the ceiling anchor plate (1) to the
bottom of the extension screw is about two inches less than the
actual floor to ceiling height. You may need to unscrew the jam
nut downward to allow the extension screw to rotate.

HINT -

A7

.

Set the SuperPole to a true

vertical position. This may be
facilitated using a construction
level, plumb bob, or by visually
comparing the pole with other
vertical line features in the room
such as wall corners, etc.

It is easier to swing the

pole up from one of the sides of
the anchor plate as shown in
figure A4. If the anchor plate hits
the ceiling prior to reaching
vertical you will need to shorten
the length of the extension screw.

HINT -

A8.

Tightening the pole - while the cover sleeve is held up by the

O-ring , insert a bar such as the shaft of a screwdriver, through the
drive hole of the extension screw. Turn the extension screw
(clockwise) as shown in figure A5 to make the anchor plate contact
the ceiling.

- The anchor plate must be made to

contact the ceiling squarely. This can be facilitated by having a
second person hold the pole exactly vertical while turning the
extension screw. Continue turning the extension screw until the
anchor plate contacts the ceiling squarely. From this point
continue to turn the extension screw approximately two to five
turns until the SuperPole is secure and ready for testing in step A9.

IMPORTANT

A9.

Testing installation -

test the

SuperPole by firmly holding onto the
pole at mid-height and rigorously
attempting to force the pole from side
to side. If either the base, or the
anchor plate appear to slide or shift,
tighten the extension screw one more
turn and repeat the test until the pole
will not move during this test.

A10.

IMPORTANT

-

Lock

extension screw after installing
pole by turning jam nut up until
touching the bottom of the pole,
then, simultaneously turning jam
nut and extension screw
backwards until jammed tight as
shown in steps 1 & 2 of figure A6.
When finally tight, remove the
turning rod, slide down the O-ring
(it stores on top of the metal
socket), and move the cover
sleeve down onto the metal
socket. Your SuperPole is now
installed.

Figure A2

Figure A2

6

4

7

Figure A3

Figure A3

5

8

Figure A5

Figure A5

Figure A6

Figure A6

A1.

Unpack the ceiling anchor plate (1) from the rectangular

box, and the pole assembly (2) from the cardboard tube
(remove staples to avoid scratching the pole). Remove the
locking pin (3) from the pole receptacle in the center of the
anchor plate.

Prior to installing the SuperPole System, we strongly
recommend that you first read through these instructions. We
would also recommend that you set aside a space on the floor
or a table to prepare the SuperPole System prior to raising the
pole for final installation.

A2.

Slide the top end of the pole (2) onto the receptacle of the

ceiling anchor plate (1) as shown in figure A1. Set the pole so
that the locking pin holes of the pole and the receptacle align.
At this point re-insert the locking pin (3) removed in step A1.

1

2

3

Figure A1

Figure A1

Figure A4

Figure A4

2

8

Installation

Instructions

Models SP-S, SP-CXX

- 2 -

1

2

Содержание SP-S

Страница 1: ...ne and as close to bed as possible while allowing clearance for bed coverings If using SuperBar option you will need to set the pivot locking positions of the bar As a suggestion positions A and E are good for moving in bed B for pulling up to sitting C for pulling up to standing and D for transferring out of bed Toilet Bathtub only locate pole between three to ten inches forward of the knees and ...

Страница 2: ...he anchor plate contact the ceiling The anchor plate must be made to contact the ceiling squarely This can be facilitated by having a second person hold the pole exactly vertical while turning the extension screw Continue turning the extension screw until the anchor plate contacts the ceiling squarely From this point continue to turn the extension screw approximately two to five turns until the Su...

Страница 3: ...r is important in two ways first the height at which you fix the grooved collar determines the height of the SuperBar hand rail unit 10 and secondly each of the grooves correspond to a rotational locking position of the hand rail unit refer to figure B3 You will want to fix the grooves to have the hand rail lock in the most advantageous positions for your assistance as discussed on page 1 Getting ...

Страница 4: ...Testing the location Have the user gently try the installed location of the trapeze handle and pole Ensure that the trapeze handle is not too close to allow a comfortable sit up action Should the trapeze support arm need to be moved remove the set screw installed in step C6 and lift the support arm up by at least one inch and reinstall the screw with the arm at a new angle to avoid the set screw b...

Отзывы: