UK Combi-Disc 4,5 – 5,5m Part 1 20-01-2021
4
Delivery check
Setting-up of the machine
Check :
•
the roller for any damage.
•
the roller for any paint damage during transport.
•
the hydraulic hoses for cuts and squeezing damage. Check also that the other hydraulic
components have not been damaged during transport.
•
that the frame construction has not been damaged.
•
that the transport wheel nuts are tightened and OK.
•
the air pressure in the tyres (according to the technical specifications).
•
that all wearing parts are intact.
•
that all distance clips for depth control are delivered with the machine.
•
and test the lights, (if mounted).
Check the tightening :
•
of wheel bolts x-Nm according to specifications
•
flange for towing eye
6 pcs of bolts
541 Nm
Содержание Combi-Disc 4.0 m
Страница 1: ...Manual no 8000501 02 200121 Part 1 of 2...
Страница 2: ......
Страница 22: ...UK Combi Disc 4 5 5 5m Part 1 20 01 2021 21 Back to the table of contents...
Страница 23: ......
Страница 24: ...The design is subject to modification without notice...