4 Planning and installation – Dimensions
23
4 Planning and installation
4.1 Dimensions
Figure 4/1 - Dimensions
D
E
B
A
I
L
G
K
J
H
C
F
HDG Euro 30/40/45/
50
A
Supply connection height
1184 mm
B
Boiler width (without attachments)
793 mm
C
Return connection height
599 mm
D
Height at middle of the flue gas pipe connection
1106 mm
E
Boiler height
1374 mm
F
Height with open cleaning shaft lid
1920 mm
G
Height with open fuel chamber door
1941 mm
H
Height at edge of fuel chamber 1105 mm
1105 mm
I
Diameter of flue pipe connection 180 mm
180 mm
J
Flue gas fan overhang
216 mm
K
Boiler length
1256 mm
L
Length of boiler incl. flue gas fan
1472 mm
Table 4/1 - Dimensions
Содержание Euro 30
Страница 1: ...hdg bavaria com HDG Euro 30 40 45 50 Operation Manual ...
Страница 2: ......
Страница 86: ...10 Index 86 HDG Euro 30 40 45 50 Version 1 de HDG Bavaria GmbH 06 2008 ...
Страница 87: ......