Mounting
12
A1461-2.0
HBM: public
C16i
4.1
Mounting procedure
Below, we use a weighbridge as an example for the me
chanical installation. We recommend that you proceed as
follows:
S
Use appropriate lifting gear to lift one face of the
weighbridge that has already been centered.
S
Prepare the load introduction parts and mount the part
with the rotation stop dowel pin below and the load
introduction part without the dowel pin above. The
lower load introduction part must be aligned such that
the dowel pin points in the direction in which, later on,
the cable outlet and the type plate are to be point,
although do not yet finally fix it.
CAUTION
or
Position of rotation stop dowel pin:
Radially position open side!
S
Use a sufficient amount of the grease provided with
the load cells to protect from wear, tear, dirt and
corrosion the upper and lower load introduction parts
in the load carrying element, the dowel pin and the
rotation stop on the load cell.
Содержание C16i C3
Страница 1: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 3: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 32: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 61: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 91: ...Dimensions C16i A1461 2 0 HBM public 31...