10
3. INSTALLATION AND CONNECTION (continued)
3.4 Electrical connection
Electrical installation and wiring for this equipment must be in
conformity with local installation standards.
Dry contact 7 A max
potential free.
Priority heating function
L N
= =
1
3 4
=
= =
2
=
Power supply
230V / 50Hz
K2
Verify that the available electrical power supply and the network
frequency correspond to the required operating current taking into
account the appliance's specific location, and the current required to
supply any other appliance connected to the same circuit.
See the corresponding wiring diagram in the appendix § 6.1.
The connection box is behind the front panel.
•
There are three L-N-GND connections for powering single-phase
models.
•
Five R-S-T-N-GND connections serve for the power supply of the
three-phase models.
Terminals (1-2) are for controlling filter pump (K2 relay). Terminals (3-4),
normally closed, are for remote on/off control.
230V +/- 10 % 50 Hz 1 Phase
400V +/- 10 % 50 Hz 3 Phases
Check that the phases
balance does not
exceed 2%
F
NF C15-100
GB BS7671:1992
D
DIN VDE 0100-702
EW EVHS-HD 384-7-702
A
ÖVE 8001-4-702
H
MSZ 2364-702/1994/MSZ 10-553 1/1990
E
UNE 20460-7-702 1993,
RECBT ITC-BT-31 2002
M
MSA HD 384-7-702.S2
IRL Wiring Rules + IS HD 384-7-702
PL PN-IEC 60364-7-702:1999
I
CEI 64-8/7
CZ CSN 33 2000 7-702
LUX 384-7.702 S2
SK STN 33 2000-7-702
NL NEN 1010-7-702
SLO SIST HD 384-7-702.S2
P
RSIUEE
TR TS IEC 60364-7-702
Remote A1 On/Off contact
HP5131DT3
HP5171DT3
HP5211DT3
HP5251DT3
HP5301DT3
HP5211ET3
HP5251ET3
HP5301ET3
HP5361ET3
Содержание SUMHEAT HP5131DT3
Страница 1: ...SWIMMING POOL HEAT PUMP UNIT Installation Instruction Manual ISSUMINVR32 RevA SUMHEAT FULL INVERTER ...
Страница 23: ...21 4 USER INTERFACE continued Manual Deactivation Setting the Timer 1 2 Silence mode deactivated 1 2 ...
Страница 33: ...31 Page left intentionally blank ...
Страница 47: ......