21
6. APPENDICES (continued)
6.2 Heating priority connections Single-Phase Pump
Outside the filtration range, the water
temperature needs to be checked by the regular
starting of the filtration pump (15 minutes every
2 hours). If the heat pump is needed during this
checking period, it will start up and retain the
heating priority.
Power supply
230V
/ 50Hz
Single-phase pump
Output 230V
Filtration pump
servo control 20A max
Содержание Powerline EcoPac 81502
Страница 2: ...POMPE A CHALEUR POUR PISCINE Manuel d instructions et d installation ...
Страница 25: ...22 6 ANNEXES suite 6 3 Vues éclatées et pièces détachées 81502 34 ...
Страница 27: ...24 6 ANNEXES suite 81512 ...
Страница 29: ...26 6 ANNEXES suite 81522 35 ...
Страница 31: ...28 6 ANNEXES suite 81542 39 ...
Страница 35: ......
Страница 36: ...SWIMMING POOL HEAT PUMP UNIT Installation Instruction Manual ...
Страница 59: ...22 6 APPENDICES continued 6 3 Exploded view and spare parts 81502 34 ...
Страница 61: ...24 6 APPENDICES continued 81512 ...
Страница 63: ...26 6 APPENDICES continued 81522 35 ...
Страница 65: ...28 6 APPENDICES continued 81542 39 ...
Страница 69: ...UNIDAD DE BOMBA DE CALOR PARA PISCINAS Manual de Instalación e Instrucciones ...
Страница 92: ...22 6 ANEXOS continuación 6 3 Vistas detalladas y piezas sueltas 81502 34 ...
Страница 94: ...24 6 ANEXOS continuación 81512 ...
Страница 96: ...26 6 ANEXOS continuación 81522 35 ...
Страница 98: ...28 6 ANEXOS continuación 81542 39 ...