
USE ONLY GENUINE REPLACEMENT PARTS
Page 3 of 5
Salt & Swim 2.0
Rev. A
1. UNIT DESCRIPTION
3. WALL-MOUNTING THE EQUIPMENT
2. UNIT INSTALLATION
2020
OWNER’S MANUAL
EN
From 3 g salt / l
Self-cleaning
Sea water
Electricity consumption
Use of a 16 A time delay circuit breaker is recommended
with this equipment. Where the power supply is shared
with other devices, please consult a technician for correct
sizing of your installation.
Product
Maximum
consumption
g Cl2/h
8 Gr/h
80 W
8
16 Gr/h
130 W
16
22 Gr/h
145 W
22
33 Gr/h
165 W
33
ELECTRONIC BOX
CELL
Sanitization system and controller for swimming pools.
Sanitization: Chlorine is produced by electrolysis of salt water, using
salt water of low salinity.
Production of sodium hypochlorite in the electrolysis cell is achieved
with a minimum of 3g salt per litre. The chlorine combats and
eliminates bacteria, viruses and pathogenic agents, and oxidizes
organic matter present in the water. The used sodium hypochlorite
reconverts into salt after a few hours.
“Do It Yourself” equipment:
The cell connects to the outside outside of the electronic box, with no
need to open the cover. The cell cable is 1.5m long.
The electronic box can be mounted on the wall without being opened.
Visual information:
The current disinfection status is shown by the colour of the box (blue,
green, purple, yellow, orange).
Filtration pump timer
Silex / glass / diatom filter
Recirculation pump
Electronic box
Electrolysis cell (always vertical)
Øint
63 mm
Øext
63 mm
A
B
C
1
2
Step 1:
Without opening the unit cover, screw the
4 suspension eyes to the box from behind.
Step 2:
Mark the positions of the 4 eyes using the drilling
template.
Step 3:
Drill and insert the 4 rawlplugs into the wall.
Step 4:
Screw in the 4 wall screws and hang up the unit.
Included in the pack
Suspension eye
x4
Screw for
suspension eye x4
Rawlplug
x4
Wall screw
x4
Drilling template
x1
310 mm
Supply 230 V - 50 Hz
Cell connection
ON/OFF buttons
C
A
B
Electrolysis cell
Connection to unit
Cell housing
Flow/gas detector (internal)
D
C
A
B