hd 680 DEI-V
ValiDoc Pro
Page GB 11
9.693.018
Version 1.06
2.3 Commissioning the sealing machine
Preparing the machine
Switching the machine on
Program version
Heating-up phase
Until the the set temperature
has been reached, after approx.
3-4 mins, the control light
flashes "okay"
Once the set temperature has
been reached, the control light
remains permanently on
Machine is ready for sealing
Connect the mains plug to the mains
Switch the machine on using the mains
switch
Test the control lights and the display
Display program version
Display current actual temperature
Rated temperature is reached
Power switch
Power connection