background image

Marsh Hawk TRV Installation, Operation and Maintenance Guide -  May 2022

1

N OT E :  I N F O R M AT I O N   R E Q U I R E D   F O R   S U CC E S S F U L 

I N S TA L L AT I O N

C AU T I O N :  I N F O R M AT I O N   I F   N OT   F O L LOW E D   M AY 

R E S U LT   I N   DA M AG E   O R   I N S TA L L AT I O N   FA I L U R E

WA R N I N G :  I N F O R M AT I O N   I F   N OT   F O L LOW E D   M AY 

R E S U LT   I N   I N J U RY   O R   D E AT H

C O N T E N TS

PART A: INSTALLATION

A1 

Marsh Hawk TRV Installation

A2 

Marsh Hawk TRV Installation using bolt ring

A3 

De-Icing System Installation

PART B: OPERATION

B1 

Spider Cage (Internals) Removal

B2 

Pressure Spacer Adjustment

PART C: MAINTENANCE

C1 

Replacing Pressure / Vacuum Gasket

C2 

Inspection & Re-lubrication

C3 Troubleshooting
C4 

Antifreeze Solutions

PA RT  A :  

I N S TA L L I N G   M A R S H   H AW K   T RV

N OT E :  T H E   M A R S H   H AW K   T RV   R E Q U I R E S   A N   8”  A P I 

12 F   F L A N G E   C O N N E C T I O N .    I F   M O U N T I N G   D I R E C T -

LY   O N   A   TA N K   R O O F   W I T H O U T   S P O O L ,  N OZ Z L E 

O R   R I S E R ,  T H E   D E E P - S E T   N AT U R E   O F   H ATC H   M AY 

P R E C L U D E   I N S TA L L I N G   FA S T E N E R S   O N   T H E   I N T E R I -

O R   O F   T H E   TA N K .    I N   T H I S   C A S E ,  A   M A R S H   H AW K 

T RV   B O LT   R I N G ,  PA RT # 

H R - F - 8 P - ST U D S - AS M

  W I L L   B E 

R E Q U I R E D   --  S E E   S E C T I O N   A 2  F O R   I N S TA L L AT I O N 

N OT E S .  A DA P T E R   S P O O L S   TO   M O U N T   TO   OT H E R   A P I 

A N D   A N S I   C O N N E C T I O N S   A R E   AVA I L A B L E .  S E E   O U R 

W E B S I T E   F O R   M O R E   I N F O R M AT I O N   O N   S P O O L S   A N D 

R I S E R S .

A1 MARSH HAWK TRV INSTALLATION

TOOLS

 

»

3/4 Box or Socket Wrench (torque wrench 
recommended)

PARTS REQUIRED

 

»

Marsh Hawk TRV

 

»

8” API Tank Gasket

 

»

16   1/2 UNC x 1-3/4 Bolts & Nuts

1. 

Place Tank Gasket on the 8” API Tank Flange and align 
holes. 

SCH 40

OR LIGHTER

NOZZLE

7.98” min

I N STA L L AT I O N ,   O P E R AT I O N   A N D   M A I N T E N A N C E   G U I D E

S E R I E S   4 000  M A R S H   H AW K 

This document contains the recommended procedures for installing, operating and maintaining a Series 4000 Marsh Hawk Tank Relief Vent. Read and understand this document prior to 
installing, operating or maintaining the Series 4000 Marsh Hawk TRV.  Replaces May 2010 Installation and Maintenance Guide.  Suitable for use with all Marsh Hawk TRVs manufactured 
since August 2011.

2. 

Mount Marsh Hawk on base gasket and align holes. 

3. 

Fasten with the supplied 1/2 UNC Bolts and Nuts 
with the 3/4 Box or Socket Wrench. Use washers on 
the Marsh Hawk side of the bolted connection. Install 
hand-tight, then torque to 

14 ft-lbs

.  Installation torques 

over the recommended value may reduce long-term 
sealing performance. Follow bolting pattern below.

5

6

7

8

1

9

10

11

12

13

14

15

16

2

3

4

8 API 12B

A2 INSTALLATION WITH BOLT RING

TOOLS

 

»

3/4 Box or Socket Wrench (torque wrench 
recommended)

PARTS REQUIRED

 

»

Marsh Hawk TRV

 

»

8” API Tank Gasket

 

»

Bolt Ring, c./w studs & nuts

1. 

Align and place bolt ring on the 8” API Tank Opening, 
ensuring gaskets are in place on both sides of the bolt 
ring.  

2. 

Install underside nuts ensuring a minimum 1/4” of 
thread is exposed on the stud when nuts are secured. 
Install hand tight, then torque to 

14 ft-lbs

.   Follow 

bolting pattern in A1, step 3.

.25 MIN

.25 MIN

3. 

Align studs with holes in Marsh Hawk TRV mounting 
flange and drop into place.

4. 

Install remaining nuts.  Install hand-tight, then torque to 

14 ft-lbs

. Installation torques over the recommended 

value may reduce long-term sealing performance 
Follow bolting pattern in A1 step 3.

Отзывы: