Power     Termination Procedure

 

(AI365 Rev 5 – 01Mar16) 

 

17)

 

Tighten down the 2 grub screws on the rear engaging 
nut. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

18)

 

Terminate the equipotential external earth to the ring 
terminal crimp provided if applicable. Remove the 
button head screw, spring washer and crimp from the 
rear engaging nut. Crimp the external earth wire into the 
crimp and reassemble. 
 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

19)

 

Refit the protective or flameproof cap if applicable. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

20)

 

The connector is now ready for installation. Please refer 
to the hook up procedure. 

 

HOOK UP PROCEDURE 

Before commencing hook up, a visual inspection should be 
carried out on the cable / gland / connector assembly. The 
assembly should be checked to ensure that all of the 
assembly components are tight. If the assembly components 
have loosened during transportation / cable installation, they 
should be retightened in accordance with the relevant 
assembly instruction sheets without twisting the cable in the 
cable gland / connector assembly. No hazardous gases 
should be present. 

 

1)

 

Turn off the power to the connectors. 

2)

 

Ensure the connectors are both set to the same keying 
position number, are of the same insert type and phase 
orientation. 

 
 

 

 
 
 
 
 
 
 
 
 
3)

 

Engage the CP connector with the BR / CR connector and 
align the key on the CP connector to the keyway on the 
BR / CR connector. 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
4)

 

Engage the two connectors by screwing the engaging 
nut clockwise onto the BR/CR shell. If the engaging nut 
will not screw on more than half a turn, then the 
connectors are set to different keying positions. 
 
 
 
 
 
 
 
 
 
 
 
 

GRUB SCREWS 

EARTH 

CAP 

KEYING POSITION INDICATORS 

CP KEY 

BR / CR KEYWAY 

ENGAGING NUT SHOULD COVER BR / CR 

SHELL THREAD WHEN FULLY MATED 