Power Termination Procedure
(AI365 Rev 5 – 01Mar16)
17)
Tighten down the 2 grub screws on the rear engaging
nut.
18)
Terminate the equipotential external earth to the ring
terminal crimp provided if applicable. Remove the
button head screw, spring washer and crimp from the
rear engaging nut. Crimp the external earth wire into the
crimp and reassemble.
19)
Refit the protective or flameproof cap if applicable.
20)
The connector is now ready for installation. Please refer
to the hook up procedure.
HOOK UP PROCEDURE
Before commencing hook up, a visual inspection should be
carried out on the cable / gland / connector assembly. The
assembly should be checked to ensure that all of the
assembly components are tight. If the assembly components
have loosened during transportation / cable installation, they
should be retightened in accordance with the relevant
assembly instruction sheets without twisting the cable in the
cable gland / connector assembly. No hazardous gases
should be present.
1)
Turn off the power to the connectors.
2)
Ensure the connectors are both set to the same keying
position number, are of the same insert type and phase
orientation.
3)
Engage the CP connector with the BR / CR connector and
align the key on the CP connector to the keyway on the
BR / CR connector.
4)
Engage the two connectors by screwing the engaging
nut clockwise onto the BR/CR shell. If the engaging nut
will not screw on more than half a turn, then the
connectors are set to different keying positions.
GRUB SCREWS
EARTH
CAP
KEYING POSITION INDICATORS
CP KEY
BR / CR KEYWAY
ENGAGING NUT SHOULD COVER BR / CR
SHELL THREAD WHEN FULLY MATED