Power Termination Procedure
(AI365 Rev 5 – 01Mar16)
CP / CR PROCEDURE
1)
Terminate the cable into the Exd cable gland as per the
manufacturer’s instructions. Consider at this stage the
relative position of the phases.
2)
Cut the conductors to the lengths shown.
(For earth conductors which are being terminated to the
earth ring (see step 6) but not carried through the
contact, cut back X = 100mm for all sizes, see 10 - 13)
3)
Strip back the insulation as shown. (For all earth
conductors terminated via the internal earth ring, cut
back the insulation flush with the gland entry thread, see
10 - 13).
4)
Unscrew the rear engaging nut from the CP / CR shell.
Remove the rear shell, spacer tube and insert from the
CP / CR shell.
5)
a)
CONTACT SIZES 50 - 240mm²
.
Remove the screws from the front of the contacts
only and push the crimp lugs out of the insert.
b)
CONTACT SIZES 300 – 630mm²
.
Remove the screw from the plastic housing and
remove the contact from inside.
CP / CR SHELL
INSERT
SPACER TUBE
REAR SHELL
ENGAGING NUT
REMOVE CONTACT
SCREWS
CRIMP LUGS
HOUSING SCREW
CONTACT
X mm
Y mm
CONTACT SIZE
X mm (± 1.5mm)
50mm²
147
70mm²
147
95mm²
147
120mm²
146
150mm²
146
185mm² (ExP 40 & 50)
149
185mm² (ExP 75)
159
240mm² (ExP 40 & 50)
149
240mm² (ExP 75)
159
300mm²
167
400mm²
172
500mm²
188
630mm²
188
CONTACT SIZE
Y mm (± 1.5mm)
50mm²
30
70mm²
30
95mm²
32
120mm²
32
150mm²
32
185mm²
40
240mm²
45
300mm²
50
400mm²
57
500mm²
62
630mm²
67
IMPORTANT NOTE
Hawke International does not recommend the use of their Power Connectors in applications where rigid PVC / SWA / PVC
power cabling (typically to BS 6346 standards) is used in portable / semi-portable applications.
In addition, Hawke recommends that barrier type glands are fitted to flexible power and loose filled control cabling entering the
connectors to maintain the Exd protection concept and to reduce the potential for core movements within the cable being
transferred to the connector’s internal components.