www.havis.com • 1-800-524-9900
8
5
Cable Management
1)
Tip the Docking Station to a position that is comfortable to work with.
2)
Install all cables that are necessary for computing needs.
3)
Use Zip Ties (Hardware Kit Item 1) to strain relieve cables. Each port has
an individual Strain Relief Point that should be used to anchor each cable.
If desired for routing purposes, additional Strain Relief Points on each side
of Docking Station may be used.
4)
Create a service loop with cables to ensure that no tension is on the
connectors and to enable intended motion.
5)
Tie off cables onto a stationary part of the mounting system.
Collect cables and secure
to the mounting system.
(Note: Mounting system not included)
This loop must be large enough
to allow full range of expected
rotation and extension without
stressing connections.
Docking Station
Parts Included
FRONT
All Models
Barrel Lock
Docking Connector
Latch Handle
Latch Tab
Locator Pin
BACK
Strain Relief
Ports
Mounting Hole
(x4)