•1-800-524-9900
7
This loop must be large enough
to allow full range of expected
rotation and extension without
stressing connections.
Collect cables and secure
to the mounting system.
(Note: Mounting system not included)
Cable Management
1)
Tip the Docking Station to a position that is comfortable to work with.
2)
Connect all cables that are necessary for computing needs.
3)
Use Zip Ties (Hardware Kit Item 1) to strain relieve cables. Strain Relief Points
are located on the bottom and sides of Docking Station and should be used
to anchor each cable.
4)
Create a service loop with cables to ensure that no tension is on the
connectors and to enable intended motion.
5)
Tie off cables onto a stationary part of the mounting system.
Use as many zip ties as
necessary to securecables.