STEP 1 - SITE PREPARATION
A)
Determine the exact location where the stage will be erected.
B)
For outdoor stages, mudsills are required to distribute the weight (125PSF to 150PSF) on the
stage legs. This will prevent the legs from sinking and ease the leveling of the stage.
C)
All base pads and mudsills should be placed only on a horizontal surface.
STEP 2 - LEG ASSEMBLY
The leg sockets on the stage deck fit 1-3/4” sq. stage legs. Use any of the following:
A)
1-3/4” sq. fixed leg with attached adjustable base pad.
B)
1-3/4” sq. leg plus adjustable base pad with collar. Insert base pad into leg and attach
with 2-3/8” snap pin in third hole of leg.
NOTE: Collar of base pad must be in leg for stability.
C)
Adjustable legs – Insert base pad into 1-1/2” sq. leg and attach with 2-3/8” snap pin
in second hole of leg. Place a 1-3/4” sq. leg over the 1-1/2” sq. leg and adjust to
desired length. Pin together leg tubes with 2-3/8” snap pin.
NOTE: There must be a
minimum of a 6” overlap of tubes for stability.
NOTE:
Leg length (without base pad) is approximately 3” shorter than desired height of stage.
6"
MINIMUM
OVERLAP
BASE PAD
1-1/2" SQ.
TUBE
2-3/8"
SNAP PIN
1-3/4" SQ.
TUBE
a
b
c
This drawing is the property of BilJax INC., Archbold, Ohio. This equipment was designed with
the understanding that the prints are loaned and will not be reproduced, copied, or used to assist in
making further drawing, apparatus or parts therof, and is to be returned unless otherwise specified.
UNLESS OTHERWISE SPECIFIED
THE FOLLOWING APPLY:
*DIMENSIONS ARE IN INCHES.
*TOLERANCES ARE AS FOLLOWS
FRACTION DECIMALS ANGLES
+/- 1/32" XX +/- .01 +/- 1/2
XXX +/- .005
*ALL WELDS ARE TO BE CONTINUOUS
3/16" FILLETS.
*ALL WELD FILLETS ARE TO
COMPLETELY FOLLOW THE JOINT
CREATED BY THE MATING SURFACES
OF PARTS JOINED.
SIZE
DWG NO.
DATE
DR
BY
REV
BY
SCALE
REV
DATE
REVISION
E.C.O. 'S
B
1:4
0
FINISH
lbs.
WEIGHT
9-24-19
ELB
STEP 2
MATERIAL SPECIFICATION
ARCHBOLD, OHIO 43502
COPYRIGHT
C
2017
A
6"
MINIMUM
OVERLAP
BASE PAD
1-1/2" SQ.
TUBE
2-3/8"
SNAP PIN
1-3/4" SQ.
TUBE
a
b
c
This drawing is the property of BilJax INC., Archbold, Ohio. This equipment was designed with
the understanding that the prints are loaned and will not be reproduced, copied, or used to assist in
making further drawing, apparatus or parts therof, and is to be returned unless otherwise specified.
UNLESS OTHERWISE SPECIFIED
THE FOLLOWING APPLY:
*DIMENSIONS ARE IN INCHES.
*TOLERANCES ARE AS FOLLOWS
FRACTION DECIMALS ANGLES
+/- 1/32" XX +/- .01 +/- 1/2
XXX +/- .005
*ALL WELDS ARE TO BE CONTINUOUS
3/16" FILLETS.
*ALL WELD FILLETS ARE TO
COMPLETELY FOLLOW THE JOINT
CREATED BY THE MATING SURFACES
OF PARTS JOINED.
SIZE
DWG NO.
DATE
DR
BY
REV
BY
SCALE
REV
DATE
REVISION
E.C.O. 'S
B
1:4
0
FINISH
lbs.
WEIGHT
9-24-19
ELB
STEP 2
MATERIAL SPECIFICATION
ARCHBOLD, OHIO 43502
COPYRIGHT
C
2017
C
6"
MINIMUM
OVERLAP
BASE PAD
1-1/2" SQ.
TUBE
2-3/8"
SNAP PIN
1-3/4" SQ.
TUBE
a
b
c
This drawing is the property of BilJax INC., Archbold, Ohio. This equipment was designed with
the understanding that the prints are loaned and will not be reproduced, copied, or used to assist in
making further drawing, apparatus or parts therof, and is to be returned unless otherwise specified.
UNLESS OTHERWISE SPECIFIED
THE FOLLOWING APPLY:
*DIMENSIONS ARE IN INCHES.
*TOLERANCES ARE AS FOLLOWS
FRACTION DECIMALS ANGLES
+/- 1/32" XX +/- .01 +/- 1/2
XXX +/- .005
*ALL WELDS ARE TO BE CONTINUOUS
3/16" FILLETS.
*ALL WELD FILLETS ARE TO
COMPLETELY FOLLOW THE JOINT
CREATED BY THE MATING SURFACES
OF PARTS JOINED.
SIZE
DWG NO.
DATE
DR
BY
REV
BY
SCALE
REV
DATE
REVISION
E.C.O. 'S
B
1:4
0
FINISH
lbs.
WEIGHT
9-24-19
ELB
STEP 2
MATERIAL SPECIFICATION
ARCHBOLD, OHIO 43502
COPYRIGHT
C
2017
B
2