Laying, backfilling and compaction
Connection of the Hateflex hose system onto
............................................ 14
..................................................... 14
1
Publishing Notes
Copyright ©
2021
by
Hauff-Technik GmbH & Co. KG
Department: Technical Editing
Robert-Bosch-Straße 9
89568 Hermaringen, GERMANY
Tel.
Fax
E-mail
Internet
+49 7322 1333-0
+49 7322 1333-999
[email protected]
www.hauff-technik.de
Reproduction of this Installation instructions – even in
extracts –
in the form of reprint, photocopy, on electronic
data media or using any other method requires our writ-
ten consent.
All rights reserved.
Subject to technical alterations at any time and without
prior announcement.
These installation instructions form part of the product.
Printed
in the Federal Republic of Germany.
2
Explanation of Symbols
1
Work stages
►
Effect/result of a work step
Reference numerals in drawings
3
Tools and aids required
To install the Hateflex spiral hose
correctly, you will only
need the usual tools.
4
Pipe trench and bearing
The pipe trenches height and width has got in-
fluence onto size and allocation of the earth and
working load.
Please consider dimensions given by technical specifica-
tions or static calculation while work.
To calculate the depth of the
ditch, count the high of the
stacked cable safety ducts (as well as the distance
between the pipes which are based on the pipes outer di-
ameter given by the spacer) and the planed covering of
the pipes.
5
Laying, backfilling and compaction
Notice
figure 1
for the following work stages.
Legend for fig.: 1
1
Safety duct trench
2
e.g. 4x Hateflex14078
3
Distance (A)
4
Ø 87 mm
5
Ground trench: stone-
less, with 10 cm compacted
sand bed
6
Compaction oft he Hateflex hoses with 10 cm
covering
7
Compacted ground
1
Dig the pipe trench in the necessary width. Take spe-
cial care on the ground trench, it needs to be com-
pacted to ensure no settling down of the earth.
2
The ground trench needs to be flat without stones
and foreign materials.
A sand bed of ~ 10 cm needs to be brought in.
Ensure that the excavation cannot fall into the
cable trenches.
3
All Hateflex hoses should be laid straight, please avoid
sinuous lines on the bridge bearing and fixing at the
side. The laying in sinuous lines reduces the sub
se-
quent draw-
in length extremely.
4
The Hateflex hose system needs to be covered with
10 cm sand and compacted by hand. The rest of the
pipe trench needs to be backfilled and compacted in
parts of 30 cm with stone-less filling material.
Do not move the pipes lateral after the backfil-
ling.
Last step is a warning tape.
The laying of the pipes needs to be done accord-
ing to the currently valid rules.
If the cable safety ducts will be laid in steps, pipe
laying and backfilling in part of the cable safety
ducts will come together. In that case the work
sequence should be as shown on
figure 2
.
Qualified trained persons are needed for imple-
mentation and controlling.
Legend for fig.: 2
1
Pipe trench
2
Spacer
3
Safety duct