![HATO 400Y Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/hato/400y/400y_manual_2107307012.webp)
Within
5s
, start setting the time.
Press
SETUP
x
times. One press corresponds to
15s
. Each pressing is signaled by the lighting of the
diode. If the button is not pressed within these
5
seconds
, the controller will set the default time.
After
3s
from the last press, the
LED
will flash
3
times
. The controller will remember the settings
and return to normal operation.
ENGINE OPERATION PROGRAMMING
The maximum engine operation time is 2 minutes. The controller enables programming of the gate
slowing down - during this time the motor works at a reduced speed, reaching the end position. Adjust
the settings so that the motor slows down approx. 50 cm before the end position.
DEFAULT SETTINGS:
60s (without deceleration)
ATTENTION!
The photocell input is ignored
during the procedure.
Adjust the thrust on the
VR1
potentiometer in accordance
with the applicable standards.
Hold down the
SETUP
button.
The
LED
will turn on and then turn off.
Release the
SETUP
button.
If the gate is in the fully closed position, the
LED
will flash quickly and
items marked with asterisks
* should be omitted
.
If the gate is not fully closed, the
LED
will flash
slowly.
CL
?
Press shortly the
LEARN
button to set whether the
motor has a built-in pulse generator.
Pressing the button changes the state of the
function to the opposite. The lit
ENCODER
diode
means that the pulser service is on, and the
extinguished diode - it is off.
(For the driver version without encoder support,
skip this point.)
ENC
ENC
ENCODER
ENCODER
* Press the
SBS
sequence control button for less
than
3s
or the transmitter button assigned to the
SBS
function.
or
SBS
* The gate starts to close (for work without the
encoder with the power set on the potentiometer
P). The
LED
will be on.
* When the gate is fully closed, the
LED
will flash
rapidly.
CL
Содержание 400Y
Страница 1: ...HATO 400Y AUTOMATION MANUAL FOR SLIDING GATES WITH SLOW DOWN...
Страница 5: ...3 MOUNTING OF THE LIMIT SWITCH CAMS Fig 3...
Страница 22: ...HATO POLSKA SP Z O O...