3.0 INSTALLATION
3.1 Panel Mounting:
An outline drawing detailing panel cut-out dimensions is provided on page 29. Install the meter on the panel using the
supplied hardware.
3.2 Cabinet Models:
Cabinet models (VT-4B, VT-4S2, VT-4S, VT-5AB, VT-6B, VT-6S2, VT-6S) require only installation of gauge tube and
cable as described in the following sections. However, the cover must be removed to perform any necessary
calibration adjustments.
3.3 Power Switch:
If an ON-OFF switch is desired, a switch may be wired into the power cable to provide this function. If both "hot" leads are to
be broken, a double pole single throw switch should be utilized. The power cable may also be cut and wired into any master
switch or circuit breaker on a panel.
CAUTION: If cutting cables, DO NOT interchange power and gauge tube cables.
3.4 Hastings Multiposition Switching Capabilities:
3.4.1 Multiposition Switching Attachment
If a Hastings Panel Kit is utilized, an ON-OFF single pole switch, pilot light, and 8-foot cables are included with a 2 or
5 position (Model VL-2 or VL-5) selector switch which can monitor 2 or up to 5 stations.
3.4.2 Cabinet Models With Switching
Cabinet model vacuum gauges can be obtained with built-in switching arrangements that operate in the same
manner as the multiposition switching attachment. Models include the VT-4S2, VT-4S, VT-6S2, and VT-6S. No installation is
necessary other than that of the power cord and gauge tube.
NOTE: You must order gauge tube cables, type CF-XX-OFV, when using five-position cabinet models.
3.5 Gauge Tube Installation:
Situate the gauge tube in a clean, dry vacuum system with the open end pointing down so as to be self-draining
should any vapors condense in it (see Section 6.0). Screw metal tubes into 1/8" female NPT threads using a suitable
sealant; Teflon tape is recommended, or use Hastings Quick Connect O-ring seals for a vacuum tight installation.
Glass tubes have 10mm (3/8") OD tubulation.
Gauge tube may be operated immediately, but best results will be obtained after the tube has outgassed for approximately 1
hour.
Содержание DV-20
Страница 2: ...101B PAGE 2 ...
Страница 16: ...101B PAGE 16 ...
Страница 18: ...101B PAGE 18 ...
Страница 20: ...101B PAGE 20 ...
Страница 21: ...101B PAGE 21 ...
Страница 22: ...101B PAGE 22 ...
Страница 23: ...101B PAGE 23 ...
Страница 24: ...101B PAGE 24 ...
Страница 25: ...101B PAGE 25 ...
Страница 26: ...101B PAGE 26 VT 4B VT 6B Schematic information from Hastings drawing 30429 rev P ...
Страница 27: ...101B PAGE 27 VT 4S VT 6S Schematic ...
Страница 29: ...101B PAGE 29 VT 4A VT 5A VT 6A Schematic information from Hastings drawing 30472 rev J ...
Страница 30: ...101B PAGE 30 VT 4S2 VT 6S2 Schematic information from Hastings drawing 30506 rev F ...
Страница 31: ...101B PAGE 31 ...
Страница 32: ...101B PAGE 32 ...
Страница 33: ...101B PAGE 33 ...
Страница 34: ...101B PAGE 34 ...