background image

 

 
 

MACH

®

 C750-C1050 Outdoor Boilers 

 

 

 

 

3

1 Boiler 

Modifications 

1.1 C

OMPLETED 

O

UTDOOR 

B

OILER 

 

      

 

 
                                  FRONT VIEW                                                                   REAR VIEW 

 

  

 

 
 
 
 
This boiler has been modified by the factory and shipped as an outdoor boiler; additional assembly is 
required to complete the outdoor boiler. These additional assemblies are listed in this manual and the 
MACH

®

 C750-C1050 Installation & Owner’s Manual. 

 
Be sure to identify your boiler and its specific installation requirements.  It is 

essential

 to read, understand, 

and follow the recommendations of this manual before installing, operating, or servicing this equipment.  
Failure to do so could result in serious injury, death, and/or property damage.

 

 
 
 
 
 
 

Содержание C1050

Страница 1: ...co Industrial Patterson Kelley 100 Burson Street East Stroudsburg PA 18301 Telephone 570 476 7261 Toll Free 877 728 5351 Facsimile 570 476 7247 www harscopk com MACH C750 C1050 Outdoor Boilers Rev 1 0...

Страница 2: ...ges occurring in connection with the furnishing performance or use of this material TABLE OF CONTENTS MACH C750 C1050 Outdoor Boilers 1 Table of Contents 2 1 BOILER MODIFICATIONS 3 1 1 Completed Outdo...

Страница 3: ...omplete the outdoor boiler These additional assemblies are listed in this manual and the MACH C750 C1050 Installation Owner s Manual Be sure to identify your boiler and its specific installation requi...

Страница 4: ...l Installing a boiler or vent system using improper installation methods or materials can result in serious injury or death due to fire or asphyxiation from carbon monoxide or other poisonous gases Br...

Страница 5: ...90 elbow item 1 to outlet of boiler and assemble gas shut off valve to the elbow This allows clearance for the air inlet stack Use approved pipe sealer that resists the action of Fuel Gases such as Na...

Страница 6: ...the assembled inlet pipe over the inlet collar position pipe to be straight and parallel to the back of the boiler and secure using 3 6 x self tapping screws ITEM 8 evenly spaced around the pipe Sili...

Страница 7: ...nless venting Below is a table containing the available adapter for each MACH boiler size Installer should use Adapters listed below or equivalent MACH Boiler Size Nominal Stack Size Stainless Adapter...

Страница 8: ...on the 4 angle brackets inside the hood 3 The 4 rectangular spacers will be on the sides of the cabinet 4 Assemble the exhaust vent and place it through the hood then into the exhaust outlet on the b...

Страница 9: ...section can be raised and placed behind the angle supports slowly lower the hood until it is supported by the top section For further instructions on installation see MACH C750 C1050 Installation Owne...

Страница 10: ...ecirculation into the air inlet Flue gas recirculation indicates that the vent is not installed properly for local conditions 2 Check for freezing of the condensate lines Frozen lines will result in b...

Страница 11: ...MACH C750 C1050 Outdoor Boilers 11 4 Assembly Drawing 4 1 ASSEMBLY DRAWING...

Страница 12: ...2007 Harsco Corporation Printed 3 18 2011...

Отзывы: