background image

RUG-045/046/055

Heavy Duty Steel Rugby Posts

3

Prepare the Uprights

- Slide the Bottom Uprights into the Hinge

Assemblies (if applicable). Position the Bottom Uprights with the
Crossbar Channel facing inwards, as shown in Fig 4.

4

Raise the Upright

Fit the Crossbar

- With the use of mechanical assistance, lift each post

(one at a time) into the vertical position and for non-hinging posts: drop
the bottom upright into the Socket. For hinging posts: slide the Safety

Bolt with Washer through the hinge assembly and secure with a Washer and
Nylock Nut as shown in Fig 5. Finally bolt the hinge plates together with the 4
M14 bolts and Washers as shown in Fig 6. Do not let go of the posts until all the
bolts are secure. Repeat for the other post.

- Using a step ladder at each post, lift the crossbar into

position and securely bolt it onto the top of the channel attached to the
uprights with the fasteners supplied with the crossbars, see detail in Fig 3.

5

ADDITIONAL MAINTENANCE:

For smoother operation and to prevent rust periodically grease hinge.

Fig 2

914

1

Dig holes 914x914x914m (3ft

) at

centres of 5

mm as shown in Fig 2. Concrete the sockets in

leav approx

0mm from top of

concrete to ground level (to replace turf . Use a spirit level to make
sure that the sockets are truly vertical and support until set. Replace the
turf extracted when the concrete has cured (allow concrete to set
before moving on to step 2).

Install Sockets

Prepare Hinge Adaptors

-

cubed

676

25mm below ground level and

e

10

)

(if applicable) - Add 1 Hinge Bolt,

Nut and 4 Nylon Washers to the back of the Hinge Adaptor as
shown in Fig 3, and insert the Hinge Tube into the Socket. Leave

the Hinge open with the Top Tube facing in towards the pitch as shown
in Fig 4.

2

5676mm

914

25

100

Fig 5

M14 Bolt

Safety
Bolt

Washer

Nylock
Nut

Fig 6

Fig 4

Fit Crossbar
after Uprights
have been

Nylon
Washer

Safety
Bolt

Fig 3

Nylock
Nut

Code:

Product:

Assembly Instructions

Отзывы: