35
Figure 6-13 Double Fall Chaining
Figure 6-14 Triple Fall Chaining
For Triple Fall Hoists
a. Feed a piece of small diameter mechanics type wire around the idle sheaves in the top and
bottom hook blocks.
b. Make sure there are no twists in the load chain and attach the load chain to the wire in the
bottom hook block.
c. Feed the chain into the bottom hook block, making sure that the welds are facing the idle
sheave. Refer to Figure 6-13.
d. Attach the load chain to the wire in the top hook block and pull it around the idle sheave so that
the end of the chain will exit the idle sheave towards the center of the bottom hook block. Refer
to Figure 6-14.
e. Install chain pin, castle nut, and split pin
:
NEVER
forget to bend the split pin after inserting into the castle nut.
6.5.13 Install hand chain
6.5.13.1 Stand facing the hand wheel side of the hoist.
6.5.13.2 Place the end link of hand chain flat in a pocket on the left side of the hand wheel and turn hand
wheel clockwise. The welds on the standing link should face away from the hand wheel.
6.5.13.3 When the forst link of chain comes out on the right side of the hand wheel, place a master link
(connecting link) onto the end link and hold in position.
NOTE
: Do not turn or twist the chain.
6.5.13.4 Keep pulling hand chain through the hoist until the last link of hand chain hangs in proper alignment
with the pockets on the hand wheel, and attach the master link from the other end of hand chain.
6.5.13.5 Close master link in a vise.
6.5.13.6 Attach the warning tag to the chain stopper link and install the chain stopper link around the hand
chain.
Содержание CF005
Страница 41: ...41 This Page Intentionally Left Blank...
Страница 43: ...43 9 1 1 2 to 5 Parts Figure 9 2 1 2 to 5 Ton Parts...
Страница 49: ...49 NOTES...
Страница 50: ...50 NOTES...
Страница 51: ...51 NOTES...