29
6)
Insert the end of the load chain [42] to the bottom hook [4] and fix them with the chain pin [7],
slotted nut [8] and split pin [9]. For Bullard
, Shur-loc
, or Inspection type hooks, refer to
Table 6-
3 for yoke nut torque specifications.
:
Always bend the split pin securely.
Figure 6-3 Bottom Hook Assembly
7)
Place the load chain [42] on the load sheave [18] so that the bottom hook side comes to right hand
and the end link of the other side becomes vertical to the load sheave pocket.
:
Put the welded part of the vertical chain link outward.
Figure 6-4 Load Chain Assembly
8)
Put chain guide [20] (or guide rollers for ½ ton [20-A]) on the frame [13].
:
Fit the larger boss of chain guide [20] into holes on frame [13].
9)
Put stripper [21] on the frame [13].
10)
Insert pinion [14] shaft from its gear side through the frame [13] and into ball bearing B [16].
11)
Insert top pin [3] into the frame [13] and put top hook [1] to the top pin. For Bullard
, Shur-loc
,
or Inspection type hooks, refer to Table 6-3 for yoke nut torque specifications.
Содержание CF005
Страница 41: ...41 This Page Intentionally Left Blank...
Страница 43: ...43 9 1 1 2 to 5 Parts Figure 9 2 1 2 to 5 Ton Parts...
Страница 49: ...49 NOTES...
Страница 50: ...50 NOTES...
Страница 51: ...51 NOTES...