
FIG.E
FIG.D
FIG.F
FIG.G
FIG.H
P.V.I.
P.V.I.
Émis
Par
NE PAS MODIFIER MANUELLEMENT
Échelle
FORMAT Modèle du Fichier:
A
FEUILLE
DE 1
REV.
DATE
APPROBATION
DESSINÉ PAR:
VÉRIFIÉ PAR:
RESP ENG
DESSIN GÉNÉRÉ PAR ORDINATEUR
De
(LBS)
APPROX.
POIDS
SONT EN POUCE
TOLÉRANCES APPLICABLES:
TOUTES LES DIMENSIONS
FRACTIONS DÉCIMALES ANGLES
1/32"
À MOINS D'INDICATIONS CONTRAIRES
.005
NE PAS CHANGER L'ÉCHELLE
Pascal Clément
.XXX
.01
.XX
1:60
1
1
TYPE D'ASSEMBLAGE:
ENLEVER TOUTES LES ARRÊTES VIVES
FINI:
Révision
Numéros
EST INTERDITE.
PARTIEL OU TOTAL SANS LA PERMISSION ÉCRITE DE LA COMPAGNIE
TOUTES REPRODUCTIONS
Révision
Description de la Révision
De
L' INFORMATION CONTENU DANS CE DESSIN EST LA PROPRIÉTÉ EXCLUSIVE DE
Date
ÉRECTION DE LA STRUCTURE ET DE LA TOILE
STRUCTURE AND TARP ASSEMBLY
FIG.B
ERECTION DE LA STRUCTURE / STRUCTURE ASSEMBLY
X1
X2
X1 = X2
2
3
6
5
4
1
FIG.C
FIG. A
( SS ) = SIMPLE SHELTER
( DS ) = DOUBLE SHELTER
( AS ) = ABRI SIMPLE
( AD ) = ABRI DOUBLE
1.
Assemble all arches on the ground making sure that you follow the positions shown (Fig. A)
Caution: Set the first arch with two #4 post 2 holes to secure the #9 (SS),#10 (DS) diagonals.
Caution: From 48’ to 60’ 6 posts with 2 holes and 6 diagonals.
2.
Connect the base of the posts of the first arch with the base of the posts of the second arch with two #10(SS), #11(DS)
swedge brace male and secure the #10 diagonals at the base of the posts of the second arch.
3.
Lift the first arch and bolt the diagonals to the posts of the first arch.
4.
Lift the second arch and secure it to the first one by putting in place the swedge braces.
5.
To assemble the other arches, secure the base of the post of the last arch lifted with the base of the post of the next arch.
Lift it and secure them by putting in place the proper brace.
Caution: Always place the #11 (SS) ,#12 ( DS ) female braces between the second and third arch.
Important: All the wing nuts must be tighten and placed inside the shelter in order not to touch the cover.
6.
Before putting the cover on, set the frame where you want it, adjust the base width and set the frame square measuring
as shown (Fig. B). The two measurements must be the same.
Caution: If the structure is not perfectly square, the cover will be difficult to install and it could be damaged during the
installation.
7.
Carefully slide the cover on top of the frame using ropes as shown (Fig. D)
8.
Tie the cover to the frame with the supplied rope (Fig. C, D, E & F). Start at the center of both ends moving towards the
sides. At the bottom, tie the cover to the base braces.
Important: Make sure that the cover is centered on the frame.
Important: The tarp must always be securely tied in order to avoid premature wear and tear.
9.
Once the tarp is installed, anchor the shelter using the #18 (SS) #25 (DS) and #19 (SS), #26 (DS) items.
AS IT IS
ILLUSTRATED FROM THE POINT OF VIEW OF GENERAL ASSEMBLY
10.
Install the accessories following the instructions supplied with each items.
WARNING: WE STRONGLY RECOMMEND THE USE OF ‘’WINDSECURE KIT’’ (2T3800-A) TO HOLD YOUR SHELTER DOWN WHEN
EXPOSED TO STRONG WINDS. THIS ITEM IS SOLD SEPARATELY. SEE FIGURE ( G AND H ) . NEVER INSTALL A SHELTER WITHOUT
USING THE APPROPRIATE ANCHORS.
abrisquebec.com